- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
There are currently no known outstanding effects for the The Simple Pressure Vessels (Safety) Regulations 2016, PART 2.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
10. Conformity to type based on internal production control plus supervised vessel testing is a conformity assessment procedure whereby the manufacturer fulfils the obligations laid down in paragraphs 11 to 13 and it is the manufacturer's sole responsibility to ensure and declare that the vessels concerned are in conformity with the type described in the [F1Type] examination certificate and satisfy the applicable requirements of these Regulations.
Extent Information
E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Word in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(e) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
10. Conformity to type based on internal production control plus supervised vessel testing is a conformity assessment procedure whereby the manufacturer fulfils the obligations laid down in paragraphs 11 to 13 and it is the manufacturer's sole responsibility to ensure and declare that the vessels concerned are in conformity with the type described in the EU-type examination certificate and satisfy the applicable requirements of these Regulations.
Extent Information
E5This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
11.—(1) A manufacturer must take all measures necessary so that the manufacturing process and its monitoring ensure conformity of the manufactured vessels with the type described in the [F1Type] examination certificate and with the applicable requirements of these Regulations.
(2) Before commencing manufacture, a manufacturer must provide [F2an approved] body of the manufacturer's choice with all necessary information, and in particular—
(a)the technical documentation referred to in paragraph 2(2)(c), together with —
(i)the certificates relating to the suitable qualification of the welding operations and of the welders or welding operators;
(ii)the inspection slip for the materials used in the manufacture of parts and components contributing to the strength of the vessel; and
(iii)a report on the examination and tests performed;
(b)the inspection document, describing the appropriate examinations and tests to be carried out during manufacture, together with the procedures in respect thereof and the frequency with which they are to be performed; and
(c)the [F1Type] examination certificate.
Extent Information
E2This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Word in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(e) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F2Words in Sch. 2 para. 11(2) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(b) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
11.—(1) A manufacturer must take all measures necessary so that the manufacturing process and its monitoring ensure conformity of the manufactured vessels with the type described in the EU-type examination certificate and with the applicable requirements of these Regulations.
(2) Before commencing manufacture, a manufacturer must provide a notified body of the manufacturer's choice with all necessary information, and in particular—
(a)the technical documentation referred to in paragraph 2(2)(c), together with —
(i)the certificates relating to the suitable qualification of the welding operations and of the welders or welding operators;
(ii)the inspection slip for the materials used in the manufacture of parts and components contributing to the strength of the vessel; and
(iii)a report on the examination and tests performed;
(b)the inspection document, describing the appropriate examinations and tests to be carried out during manufacture, together with the procedures in respect thereof and the frequency with which they are to be performed; and
(c)the EU-type examination certificate.
Extent Information
E6This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
12.—(1) For each individual type of vessel manufactured, the [F3approved] body must carry out the appropriate examinations and tests in order to verify the conformity of the vessel with the type described in the [F1Type] examination certificate and with the corresponding requirements of these Regulations.
(2) The manufacturer must present the vessels in the form of uniform batches and must take all necessary measures in order that the manufacturing process ensures the uniformity of each batch produced.
(3) When a batch is examined, the [F3approved] body must ensure that the vessels have been manufactured and checked in accordance with the technical documentation, and must perform a hydrostatic test or a pneumatic test of equivalent effect on each vessel in the batch at a pressure Ph equal to 1.5 times the vessel's design pressure in order to check its strength; the pneumatic test must be subject to acceptance of the test safety procedures by the [F4Secretary of State].
(4) In order to examine the weld quality, the [F3approved] body must carry out tests on test-pieces taken from, at the choice of the manufacturer, either a production test-piece or from a vessel. The tests must be carried out on longitudinal welds; however, where differing weld techniques are used for longitudinal and circumferential welds, the tests must be repeated on the circumferential welds.
(5) For the vessels subject to the experimental methods referred to in paragraph 17 (experimental method) of Schedule 1, these tests on test-pieces must be replaced by a hydrostatic test on five vessels taken at random from each batch in order to check that they conform to the essential safety requirements set out in that paragraph.
(6) In the case of accepted batches, the [F3approved] body must affix its identification number, or cause that number to be affixed, to each vessel and must draw up a written certificate of conformity relating to the tests carried out. All vessels in the batch may be placed on the market except for those which have not successfully undergone a hydrostatic test or a pneumatic test.
(7) If a batch is rejected, the [F3approved] body must take appropriate measures to prevent the placing on the market of that batch. In the event of frequent rejection of batches, the [F3approved] body may suspend the statistical verification.
(8) The manufacturer must be able to supply on request by the relevant authorities the [F3approved] body's certificates of conformity referred to in sub-paragraph (6).
(9) The [F3approved] body must supply the Secretary of State and, on request, other [F3approved] bodies, F5... with a copy of the inspection report issued by it.
(10) The manufacturer must, under the responsibility of the [F3approved] body, affix the [F3approved] body's identification number during the manufacturing process.
(11) In this paragraph, a “batch” of vessels must consist of no more than 3,000 vessels of the model of the same type.
Extent Information
E3This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Word in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(e) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F3Words in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(c) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in Sch. 2 para. 12(3) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(j) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F5Words in Sch. 2 para. 12(9) omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(k) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
12.—(1) For each individual type of vessel manufactured, the notified body must carry out the appropriate examinations and tests in order to verify the conformity of the vessel with the type described in the EU-type examination certificate and with the corresponding requirements of these Regulations.
(2) The manufacturer must present the vessels in the form of uniform batches and must take all necessary measures in order that the manufacturing process ensures the uniformity of each batch produced.
(3) When a batch is examined, the notified body must ensure that the vessels have been manufactured and checked in accordance with the technical documentation, and must perform a hydrostatic test or a pneumatic test of equivalent effect on each vessel in the batch at a pressure Ph equal to 1.5 times the vessel's design pressure in order to check its strength; the pneumatic test must be subject to acceptance of the test safety procedures by the [F9relevant state] in which the test is performed.
(4) In order to examine the weld quality, the notified body must carry out tests on test-pieces taken from, at the choice of the manufacturer, either a production test-piece or from a vessel. The tests must be carried out on longitudinal welds; however, where differing weld techniques are used for longitudinal and circumferential welds, the tests must be repeated on the circumferential welds.
(5) For the vessels subject to the experimental methods referred to in paragraph 17 (experimental method) of Schedule 1, these tests on test-pieces must be replaced by a hydrostatic test on five vessels taken at random from each batch in order to check that they conform to the essential safety requirements set out in that paragraph.
(6) In the case of accepted batches, the notified body must affix its identification number, or cause that number to be affixed, to each vessel and must draw up a written certificate of conformity relating to the tests carried out. All vessels in the batch may be placed on the market except for those which have not successfully undergone a hydrostatic test or a pneumatic test.
(7) If a batch is rejected, the notified body must take appropriate measures to prevent the placing on the market of that batch. In the event of frequent rejection of batches, the notified body may suspend the statistical verification.
(8) The manufacturer must be able to supply on request by the relevant authorities the notified body's certificates of conformity referred to in sub-paragraph (6).
(9) The notified body must supply the Secretary of State and, on request, other notified bodies, other [F10relevant states] and the Commission, with a copy of the inspection report issued by it.
(10) The manufacturer must, under the responsibility of the notified body, affix the notified body's identification number during the manufacturing process.
(11) In this paragraph, a “batch” of vessels must consist of no more than 3,000 vessels of the model of the same type.
Extent Information
E7This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
Textual Amendments
F9Words in Sch. 2 para. 12(3) substituted (N.I.) (31.12.2020) by The Pressure Vessels (Amendment) (Northern Ireland) (EU Exit) Regulations 2020 (S.I. 2020/678), reg. 1(b), Sch. 1 para. 8(1)(b)
F10Words in Sch. 2 para. 12(9) substituted (N.I.) (31.12.2020) by The Pressure Vessels (Amendment) (Northern Ireland) (EU Exit) Regulations 2020 (S.I. 2020/678), reg. 1(b), Sch. 1 para. 8(1)(c)
13.—(1) The manufacturer must affix the [F7UK] marking to each individual vessel that is in conformity with the type described in the [F1Type] examination certificate and satisfies the applicable requirements of these Regulations.
(2) The manufacturer must draw up a written [F8declaration] of conformity for each vessel model and keep it at the disposal of the enforcing authority for a period of 10 years beginning on the day on which the vessel was placed on the market. The [F8declaration] of conformity must identify the vessel model for which it has been drawn up.
(3) A copy of the [F8declaration] of conformity must be made available to the enforcing authority upon request.
Extent Information
E4This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Word in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(e) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F6Sch. 2 para. 13 heading substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(l) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F7Word in Sch. 2 para. 13 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(m)(i) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F8Word in Sch. 2 para. 13 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(m)(ii) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
13.—(1) The manufacturer must affix the CE marking to each individual vessel that is in conformity with the type described in the EU-type examination certificate and satisfies the applicable requirements of these Regulations.
(2) The manufacturer must draw up a written EU declaration of conformity for each vessel model and keep it at the disposal of the enforcing authority for a period of 10 years beginning on the day on which the vessel was placed on the market. The EU declaration of conformity must identify the vessel model for which it has been drawn up.
(3) A copy of the EU declaration of conformity must be made available to the enforcing authority upon request.
Extent Information
E8This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys