Article 21

SCHEDULE 1

Article 2(1)

SCHEDULE A1MCS-certified installations

1.  An eligible installation is an MCS-certified installation if it is certified under—

(a)the MCS and installed in accordance with the relevant installation standard in the scheme; or

(b)a scheme where—

(i)installers are certified to that scheme’s standards by an organisation accredited to EN 45011(2) or EN ISO/IEC 17065:2012(3);

(ii)the plant is installed in accordance with the installation standards applicable to the plant under that scheme on the plant’s first commissioning date and which are equivalent to a relevant installation standard; and

(iii)that scheme is equivalent to the Microgeneration Certification Scheme.

2.  In paragraph 1, “relevant installation standard” means—

(a)if the commissioning date for the installation is on or after 15th January 2016, if the installation is—

(i)a solar photovoltaic installation, version 3.3 of the document entitled Microgeneration Installation Standard: MIS 3002 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of solar-photovoltaic (PV) microgeneration systems,

(ii)a wind installation, version 3.4 of the document entitled Microgeneration Installation Standard: MIS 3003 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of micro and small wind turbine systems,

(iii)a heat-led combined heat and power installation, version 3.2 of the document entitled Microgeneration Installation Standard: MIS 3007 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing and micro-cogeneration package; or

(iv)an electricity-led combined heat and power installation, version 2.3 of the document entitled Microgeneration Installation Standard: MIS 3007-2 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a domestic hot water system combining an electricity led micro-cogeneration package; or

(b)if the commissioning date for the installation is before the 15th January 2016, any installation requirements applicable to the installation under the MCS on the installation’s commissioning date.

3.  When exercising any functions under this Order, the Authority may treat the certification of an eligible installation in accordance with this Schedule as evidence that the installation is installed in accordance with a relevant installation standard or a standard which is equivalent to a relevant installation standard.

4.  In this Schedule, “MCS” means the Microgeneration Certification Scheme.

Article 22

SCHEDULE 2

Article 8B

SCHEDULE 1ALimit of aggregate capacity of eligible installations

Table 1: Limit of aggregate total installed capacity of eligible installations (in megawatts) applied for in respect of eligible installations of a particular description for a particular tariff period

8th February to 31st March 20161st April to 30th June 20161st July to 30th September 20161st October to 31st December 20161st January to 31st March 20171st April to 30th June 20171st July to 30th September 20171st October to 31st December 20171st January to 31st March 20181st April to 30th June 20181st July to 30th September 20181st October to 31st December 20181st January to 31st March 2019
Anaerobic digestion installations5.85.05.05.05.05.05.05.05.05.05.05.05.0
Hydro generating stations with total installed capacity of 100 kW or less1.11.11.21.21.21.31.31.31.31.31.41.41.4
Hydro generating stations with total installed capacity greater than 100 kW6.16.26.36.36.46.46.46.46.46.46.46.36.3
Solar photovoltaic (other than stand-alone) with total installed capacity of 10 kW or less48.449.650.651.752.853.854.255.957.058.059.160.161.1
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 10 kW but not exceeding 50 kW16.517.017.417.818.218.618.719.419.820.320.721.121.5
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 50 kW14.114.514.915.415.816.216.417.117.618.018.519.019.4
Stand-alone solar photovoltaic5.05.05.05.05.05.05.05.05.05.05.05.05.0
Wind with total installed capacity of 50 kW or less5.65.65.55.55.65.55.55.45.55.45.45.35.4
Wind with total installed capacity greater than 50 kW but not exceeding 100 kW0.30.30.30.30.30.30.30.30.30.30.30.30.3
Wind with total installed capacity greater than 100 kW but not exceeding 1500 kW6.86.76.66.56.46.36.26.16.15.95.85.75.7
Wind with total installed capacity greater than 1500 kW5.05.05.05.05.05.05.05.05.05.05.05.05.0

Article 23

SCHEDULE 3

Article 36

SCHEDULE 2Publication of FIT deployment data

1.  Within the first 5 working days of each tariff period, the Authority must determine and publish the data set out in paragraphs 2 to 4.

2.  The data referred to in paragraph 1, in respect of installations not able to be granted preliminary accreditation are—

(a)the aggregate total installed capacities of solar photovoltaic (other than stand-alone), with total installed capacity of 10 kilowatts or less, which were registered on the MCS database in the deployment period;

(b)the aggregate total installed capacities of solar photovoltaic (other than stand-alone), with total installed capacity greater than 10 kilowatts but not exceeding 50 kilowatts, which were registered on the MCS database in that period; and

(c)the aggregate total installed capacities of wind installations, with total installed capacity of 50 kilowatts or less, which were registered on the MCS database in that period.

3.  The data referred to in paragraph 1, in respect of installations to which the Authority may grant preliminary accreditation, are—

(a)the aggregate total installed capacities of anaerobic digestion installations, with total installed capacity of 500 kilowatts or less, applied for within that deployment period;

(b)the aggregate total installed capacities of anaerobic digestion installations, with total installed capacity greater than 500 kilowatts, applied for within that period;

(c)the aggregate total installed capacities of hydro generating stations applied for within that period;

(d)the aggregate total installed capacities of solar photovoltaic installations (other than stand-alone), with total installed capacity greater than 50 kilowatts applied for within that period;

(e)the aggregate total installed capacity of wind installations, with total installed capacity greater than 50 kilowatts, applied for within that deployment period.

4.  The data referred to in paragraph 1, in respect of stand-alone solar photovoltaic installations, are the aggregate total installed capacities of stand-alone solar photovoltaic installations applied for within that deployment period (including those which were registered on the MCS database in that period).

5.  In this Schedule—

“applied for” refers to an application for accreditation or preliminary accreditation being received as defined in article 8B(4)(a);

“deployment period” means the period of three months immediately preceding the tariff period; and

“MCS database” means the database maintained by the Microgeneration Certification Scheme that records the details of MCS-certified installations.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill