Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. PART 1 Interpretation and Application

    1. 1.Citation, commencement and extent

    2. 2.Interpretation

    3. 3.Application

    4. 3A.Appointment and obligations of an authorised representative

  3. PART 1A National Technical Specification Notices and National Technical Rules

    1. 3B.Publication of National Technical Specification Notices

    2. 3C.Publication of a list of National Technical Rules

  4. PART 2 Subsystems

    1. 4.Requirement for authorisation

    2. 5.Application for authorisation

    3. 6.Authorisation for a vehicle already authorised for an EU Member State

    4. 7.Authorisation decision

    5. 8.Determination of type

    6. 9.Type authorisation

    7. 10.Type authorisation: changes to applicable standards

    8. 11.Revocation of authorisations

    9. 12.List of projects for the renewal or upgrading of subsystems

    10. 13.Authorisation requirements for the renewal or upgrading of subsystems

    11. 14.Exemption from need to conform with NTSNs (exemptions)

    12. 14A.Application for exemptions

    13. 15.Essential requirements for project subsystems

    14. 16.Role of project entity

    15. 17.Project subsystems: UK verification assessment procedure

    16. 18.Project subsystems: UK declaration of verification

    17. 19.Retention of documents

    18. 20.Continuing duty on operator in relation to standards

    19. 21.Fees payable to the Safety Authority

    20. 22.Fees payable to the Competent Authority

  5. PART 3 Interoperability Constituents

    1. 23.Prohibition on placing interoperability constituents on the market

    2. 24.Assessment procedure for interoperability constituents

    3. 25. UK declaration of conformity or suitability for use

    4. 26.Effect of declarations of conformity or suitability for use

    5. 27.Duties on operators

    6. 28.Recognition of assessments of other Member States

    7. 29.Notification to the European Commission of incorrect declaration

  6. PART 4 Approved and Designated Bodies

    1. 30.Approved bodies

    2. 31.Appointment of approved bodies and designated bodies

    3. 32. Approved bodies and designated bodies: certificates etc.

    4. 33.Fees of approved bodies and designated bodies

    5. 34.Fees of the Secretary of State

    6. 34A.Register of approved bodies

    7. 34B.UK national accreditation body

  7. PART 5 Registers

    1. 35.Register of infrastructure

    2. 36.National vehicle register

  8. PART 6 Appeals and Enforcement

    1. 37.Appeals in Great Britain

    2. 38.Appeals in Northern Ireland

    3. 39.Enforcement in Great Britain

    4. 40.Enforcement in Northern Ireland

    5. 41.Notices relating to interoperability constituents not meeting the essential requirements

    6. 42.Notice of improper drawing up of the EC or UK declaration of conformity or suitability for use for an interoperability constituent

    7. 43.Defence of due diligence

  9. PART 7 Supplementary

    1. 44.Deemed authorisation

    2. 45.Accessibility for people with reduced mobility

    3. 46.Dispensations

    4. 47.Revocation and savings

    5. 47A.Further savings and transitional arrangements

    6. 48.Amendments to legislation

    7. 49.Review

  10. Signature

    1. SCHEDULE 1

      Amendments to legislation

      1. 1.Section 182 of the Equality Act 2010 (rail vehicle accessibility...

      2. 2.In regulation 2(1) of the Rail Vehicle Accessibility (Non-Interoperable Rail...

      3. 3.The Railways and Other Guided Transport Systems (Safety) Regulations 2006...

    2. SCHEDULE 2

      Essential Requirements

      1. (This Schedule substantially reproduces Annex III to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.General requirements

        2. 1.1.Safety (1.1.1) The design, construction or assembly, maintenance and monitoring...

        3. 1.2.Reliability and availability The monitoring and maintenance of fixed or...

        4. 1.3.Health (1.3.1) Materials likely, by virtue of the way they...

        5. 1.4.Environmental protection (1.4.1) The environmental impact of establishment and operation...

        6. 1.5.Technical compatibility The technical characteristics of the infrastructure and fixed...

        7. 1.6.Accessibility (1.6.1) The ‘infrastructure’ and ‘rolling stock’ subsystems must be...

        8. 2.Requirements specific to each subsystem

        9. 2.1.Infrastructure (2.1.1) Safety Appropriate steps must be taken to prevent...

        10. 2.2.Energy (2.2.1) Safety Operation of the energy-supply systems must not...

        11. 2.3.Control-command and signalling (2.3.1) Safety The control-command and signalling installations...

        12. 2.4.Rolling stock (2.4.1) Safety The rolling-stock structures and those of...

        13. 2.5.Maintenance (2.5.1) Health and safety The technical installations and the...

        14. 2.6.Operation and traffic management (2.6.1) Safety Alignment of the network...

        15. 2.7.Telematics applications for freight and passengers (2.7.1) Technical compatibility The...

    3. SCHEDULE 3

      Subsystems

      1. (This Schedule substantially reproduces Annex II to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.List of subsystems

        2. 2.Description of the subsystems

        3. 2.1.Infrastructure The track, points, engineering structures (bridges, tunnels etc.), associated...

        4. 2.2.Energy The electrification system, including overhead lines and the trackside...

        5. 2.3.Trackside control-command and signalling All the trackside equipment required to...

        6. 2.4.On-board control-command and signalling All the on-board equipment required to...

        7. 2.5.Operation and traffic management The procedures and related equipment enabling...

        8. 2.6.Telematics applications This subsystem comprises two elements—

        9. 2.7.Rolling stock Structure, command and control system for all train...

        10. 2.8.Maintenance The procedures, associated equipment, logistics centres for maintenance work...

    4. SCHEDULE 4

      UK verification assessment procedure for subsystems

      1. (This Schedule substantially reproduces Annex VI to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.General principles “UK verification” means a procedure carried out by...

        2. 2.UK certificate of verification issued by an approved body

        3. 2.1.Introduction For the purpose of these Regulations, the verification by...

        4. 2.2.Intermediate statement of verification (ISV) (2.2.1) Principles At the request...

        5. 2.3.UK certificate of verification (2.3.1) The approved bodies responsible for...

        6. 2.4.Technical file accompanying the UK declaration of verification The technical...

        7. 2.5.Surveillance by approved body (2.5.1) The approved body responsible for...

        8. 2.6.Submission A copy of the technical file accompanying the UK...

        9. 2.7.Publication Each approved body must periodically publish relevant information concerning:...

        10. 3.UK certificate of verification issued by a designated body

        11. 3.1.Introduction In any case where UK specific rules apply, the...

        12. 3.2.Certificate of verification The designated body must draw up the...

        13. 3.3.Technical file The technical file compiled by the designated body...

        14. 4.Verification of parts of subsystems If a UK certificate of...

    5. SCHEDULE 5

      UK declaration of verification of subsystems

      1. (This Schedule substantially reproduces Annex V to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.UK declaration of verification of subsystems The UK declaration of...

        2. 2.Modification of subsystems with EC or UK declaration of verification...

        3. 2.1.If the entity introducing the modifications demonstrates that the modification...

        4. 2.2.If the entity introducing the modification demonstrates that the modification...

        5. 3.UK declaration of verification in the case of additional verifications...

    6. SCHEDULE 6

      Model declaration of conformity to an authorised type of vehicle

    7. SCHEDULE 7

      UK declaration of conformity or suitability for use of interoperability constituents

      1. (This Schedule substantially reproduces Annex IV to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.Interoperability constituents The UK declaration of conformity or suitability for...

        2. 2.Scope The UK declaration of conformity or suitability for use...

        3. 3.Contents of the UK declaration of conformity or suitability for...

    8. SCHEDULE 8

      Minimum criteria which must be taken into account by the Secretary of State when approving bodies

      1. (This Schedule substantially reproduces Annex VIII to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)

        1. 1.The body, its Director and the staff responsible for carrying...

        2. 2.The body and the staff responsible for the checks must...

        3. 3.The body must employ staff and possess the means required...

        4. 4.The staff responsible for the checks must possess—

        5. 5.The independence of the staff responsible for inspections must be...

        6. 6.The body must take out civil liability insurance unless that...

        7. 7.The staff of the body must be bound by professional...

  11. Explanatory Note

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill