Chwilio Deddfwriaeth

The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau Agor

Rhagor o Adnoddau

Changes over time for: PART III

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998, PART III. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART IIIU.K.CLOSING OF OPENINGS IN HULLS AND WATERTIGHT BULKHEADSBELOW THE BULKHEAD DECK

InterpretationsU.K.

15.  In this Part “a closing appliance” shall be deemed to be below the margin line if the sill of the opening with which it is associated is below that line.

Commencement Information

I1Reg. 15 in force at 12.11.1998, see reg. 1

Closure of hull openings and openings in watertight bulkheadsU.K.

16.—(1) The following closing appliances are to be securely closed before the ship proceeds on any voyage and are to be kept so closed until the ship has been secured at a berth or anchorage—

(a)sidescuttles which can be opened and which are situated below the bulkhead deck;

(b)deadlights of any sidescuttles which are situated below the bulkhead deck and which—

(i)will not be accessible whilst the ship is at sea; or

(ii)are situated in spaces appropriated for use sometimes for the carriage of cargo and sometimes for use by passengers, while such spaces are being used for the carriage of cargo; and

(c)gangway and cargo-loading doors below the bulkhead deck.

(2) No closing appliance described in paragraph (1) shall be considered as being securely closed unless it is locked.

(3) Every portable plate closing an opening below the bulkhead deck in any portion of the internal structure of the ship which is required to be watertight shall be fitted in place before the ship proceeds on any voyage and shall be kept in place, except in case of urgent necessity, until the ship has been secured at a berth or anchorage. In replacing any such plate all reasonable precautions shall be taken to ensure that the joints are watertight.

(4) Both the watertight cover and the automatic non-return valve of any overboard discharge having its inboard opening below the margin line shall be kept closed and secured when such device is not in use.

Commencement Information

I2Reg. 16 in force at 12.11.1998, see reg. 1

Marking of valves, doors and mechanismsU.K.

17.  All doors, valves and mechanisms connected with the damage control and watertight integrity of the ship shall be suitably marked to ensure that they may be properly used to provide maximum safety.

Commencement Information

I3Reg. 17 in force at 12.11.1998, see reg. 1

Drills and inspectionsU.K.

18.—(1) All deadlights which are accessible, all watertight doors, all valves and closing mechanisms of scuppers and the devices referred to in regulation 16(4) shall be opened and closed for purposes of drill—

(a)at intervals of not more than seven days; and

(b)immediately before the ship proceeds to sea if the ship is intended to remain at sea for a period of more than seven days.

(2) All closing appliances and devices referred to in regulation 16(1) and (4) shall be inspected by a person appointed by the master for that purpose before the ship proceeds on any voyage.

(3) The following closing appliances and mechanisms are to be inspected at intervals of not more than seven days by a person appointed for that purpose either generally or on any particular occasion by the master—

(a)all valves, the closing of which is necessary to make watertight any compartment below the margin line; and

(b)all valves, the operation of which is necessary for the efficient operation of damage-control cross-connections.

Commencement Information

I4Reg. 18 in force at 12.11.1998, see reg. 1

NoticesU.K.

19.  Suitable notices and signs shall be provided on, or in the vicinity of, all the closing appliances referred to in regulation 16 to indicate, as necessary, the procedures for operating the appliances, the purpose of the controls and any precautions to be observed.

Commencement Information

I5Reg. 19 in force at 12.11.1998, see reg. 1

Entries to be recordedU.K.

20.  Entries shall be made in a book retained on board to record the following—

(1) the times of the last closing, before the ship proceeds on any voyage, of the closing appliances referred to in regulation 16(1) and of the next opening of such closing appliances;

(2) the times when the portable plates referred to in regulation 16(3) are fitted in place and the times of any removal and replacement of such plates whilst the ship is on any voyage; and

(3) the occasions on which drills are held and inspections made in compliance with these Regulations and whether or not the closing appliances and devices to which any such drill or inspection relates are in good working order when the drill or inspection takes place.

Commencement Information

I6Reg. 20 in force at 12.11.1998, see reg. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.