Chwilio Deddfwriaeth

The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau Agor

Rhagor o Adnoddau

Changes over time for: PART II

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998, PART II. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART IIU.K.STRENGTH, CONSTRUCTION AND WATERTIGHT SUBDIVISION

Structural strengthU.K.

6.  The structural strength of every ship shall be sufficient for the service for which the ship is intended.

Commencement Information

I1Reg. 6 in force at 12.11.1998, see reg. 1

Construction of watertight bulkheadsU.K.

7.—(1) Every portion of the ship required by these Regulations to be watertight shall be constructed in accordance with such of the requirements of Schedule 4 in Merchant Shipping Notice MSN 1699(M) as apply to it.

(2) All tanks forming part of the structure of the ship and used for the storage of oil fuel or other liquids including double bottoms, peak tanks, settling tanks and bunkers shall be of a design and construction adequate for that purpose.

Commencement Information

I2Reg. 7 in force at 12.11.1998, see reg. 1

Watertight subdivisionU.K.

8.  Every subdivided ship shall be subdivided by bulkheads, which shall be watertight up to the bulkhead deck, into compartments the maximum length of which shall be calculated in accordance with such of the provisions of Section 2 of Schedule 2 in Merchant Shipping Notice MSN 1699(M) as apply to that ship. Every other portion of the internal structure which affects the efficiency of the subdivision of the ship shall be watertight, and shall be of a design which will maintain the integrity of the subdivision.

Commencement Information

I3Reg. 8 in force at 12.11.1998, see reg. 1

Peak and machinery space bulkheads, shaft tunnelsU.K.

9.—(1) Every subdivided ship shall be provided with a collision bulkhead which shall be watertight up to the bulkhead deck and shall be fitted at a distance from the ship’s forward perpendicular of not less than five per cent of the length of the ship and not more than three metres plus five per cent of such length. If the ship has a forward superstructure, the collision bulkhead shall be extended weathertight to the deck next above the bulkhead deck. The extension shall not be required to be fitted directly over the bulkhead below, provided that it is at least five per cent of the length of the ship from the forward perpendicular and the part of the bulkhead deck which forms the step is made effectively weathertight. A collision bulkhead need not be provided if the design of the ship, its service or its operation makes its fitting unnecessary.

(2) Every such ship shall be provided with a watertight afterpeak bulkhead and with watertight bulkheads, dividing the space appropriate to the main and auxiliary propelling machinery (and boilers if any) from other spaces. Such bulkheads shall be watertight up to the bulkhead deck provided that the afterpeak bulkhead may be stopped below the bulkhead deck if the safety of the ship as regards subdivision is not thereby impaired.

(3) The stern gland of every such ship shall be situated in a watertight shaft tunnel or other watertight space separate from the stern tube compartment and of such a volume that if the tunnel or space is flooded the margin line will not be submerged.

Additional requirements for ships constructed on or after 1st September 1984

(4) Where bow doors are fitted and a sloping loading ramp forms part of the extension of the collision bulkhead above the bulkhead deck, any part of the ramp structure which is more than 2.3 metres above the bulkhead deck may extend forward of the limit specified in paragraph (1). The ramp shall form a complete weathertight closure of the collision bulkhead extension above the bulkhead deck.

Commencement Information

I4Reg. 9 in force at 12.11.1998, see reg. 1

WeatherdeckU.K.

10.  On a subdivided ship the bulkhead deck or a deck above the bulkhead deck shall be weathertight. All openings in an exposed weathertight deck shall have coamings of adequate height and strength and shall be provided with efficient and rapid means of closing so as to make them weathertight. Freeing ports, open rails and scuppers shall be fitted as necessary for rapidly clearing the weather deck of water under all weather conditions.

Commencement Information

I5Reg. 10 in force at 12.11.1998, see reg. 1

Partial subdivision above the bulkhead deckU.K.

11.  On subdivided ships all reasonable and practicable measures shall be taken to limit, where necessary, the entry and spread of water above the bulkhead deck. Such measures may include partial bulkheads or webs. Where such partial watertight bulkheads and webs are fitted on the bulkhead deck, above or in the immediate vicinity of main subdivision bulkheads, they shall have watertight shell and bulkhead deck connections so as to restrict the flow of water along the deck when the ship is heeled in a damaged condition. Where such partial watertight bulkheads do not coincide with the bulkheads below, the bulkhead deck between shall be made effectively watertight.

Commencement Information

I6Reg. 11 in force at 12.11.1998, see reg. 1

Openings in watertight bulkheadsU.K.

12.  Bulkheads required by these Regulations to be watertight shall not be pierced by doorways, ventilation trunks or other similar openings, unless such openings are essential for the proper working of the ship and do not impair the ship’s survivability standard.

Commencement Information

I7Reg. 12 in force at 12.11.1998, see reg. 1

Openings in the shell plating below the bulkhead deckU.K.

13.—(1) In every subdivided ship the number of sidescuttles, scuppers, sanitary discharges and other openings in the shell below the bulkhead deck shall be the minimum compatible with the design and proper working of the ship. Every such sidescuttle shall be a non-opening type and shall be fitted with efficient hinged deadlights permanently attached so that it can be readily and effectively closed and secured watertight.

(2) The arrangements for closing every such opening below the bulkhead deck shall be consistent with its intended purpose and shall be such as will ensure watertightness.

(3) In every subdivided ship the design and operation of openings in the shell plating below the bulkhead deck shall take into account the specifications set out in Schedule 10 in Merchant Shipping Notice MSN 1699(M).

Commencement Information

I8Reg. 13 in force at 12.11.1998, see reg. 1

Side and other openings above the bulkhead deckU.K.

14.—(1) In every subdivided ship, sidescuttles, windows, gangway ports, cargo ports, bunkering ports and other openings in the shell above the bulkhead deck and their means of closing shall be of efficient design and construction and of sufficient strength having regard to the spaces in which they are fitted and to their positions relative to the deepest subdivision load waterline and to the intended service of the ship. All sidescuttles and windows shall be manufactured to standards recognised by the Certifying Authority.

(2) In every subdivided ship efficiently hinged deadlights, which can be easily closed and secured watertight, shall be provided for all sidescuttles to spaces below the first deck above the bulkhead deck and, in the case of a ship which is marked with a summer load line, to all sidescuttles in an enclosed superstructure.

(3) In every subdivided ship which is marked with a summer load line, each discharge led through the shell above the margin line from a space below the freeboard deck or from within any enclosed superstructure or from within any deckhouse on the freeboard deck which is fitted with weathertight doors, shall take into account the requirements of paragraph 2(2) of Schedule 10 in Merchant Shipping Notice MSN 1699(M) with efficient means for preventing water from passing inboard.

Commencement Information

I9Reg. 14 in force at 12.11.1998, see reg. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.