Chwilio Deddfwriaeth

The Wireless Telegraphy (Licence Award) Regulations 2018

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

  1. Introductory Text

  2. PART 1 Introductory

    1. 1.Citation, commencement, and extent

    2. 2.Interpretation

  3. PART 2 Application stage

    1. 3.Applications for the grant of a licence

    2. 4.Application

    3. 5.Meaning of existing spectrum holdings

    4. 6.3.4 GHz minimum requirement rule

    5. 7.Application for a replacement licence

  4. PART 3 Qualification stage

    1. CHAPTER 1 Qualification

      1. 8.Notification of names of applicants and associates

      2. 9.Recording of applicant group members

      3. 10.Subsequent changes to bidder groups

      4. 11.Changes to existing spectrum holdings

      5. 12.Fitness to hold a licence

      6. 13.Qualification to participate in the award process

      7. 14.Publication of names of qualified applicants

      8. 15.Withdrawal of an application

      9. 16.Determination of number of bidders

    2. CHAPTER 2 Additional deposit and eligibility limit for the first principal stage round

      1. 17.Additional deposit before the first principal stage round

      2. 18.Determination of a bidder’s eligibility limit for the first principal stage round

    3. CHAPTER 3 Recording of existing spectrum holdings, determination of the 2.3 GHz bid limit and overall bid constraints

      1. 19.Recording of existing spectrum holdings

      2. 20.Determination of the 2.3 GHz bid limits

      3. 21.Determination of overall bid constraints

  5. PART 4 Award process

    1. 22.Principal stage, assignment stage and grant stage

  6. PART 5 Participation by the pre-existing licence holder

    1. 23.Participation by the pre-existing licence holder where it is a bidder and has applied for a replacement licence

    2. 24.3.4 GHz lots available in the award process

  7. PART 6 The principal stage

    1. CHAPTER 1 Principal stage rounds, principal stage forms, principal stage bids and round prices

      1. 25.Principal stage rounds

      2. 26.Principal stage form

      3. 27.Principal stage bids

      4. 28.Number of principal stage rounds

      5. 29.Round prices for the first principal stage round

      6. 30.Determination of round prices for subsequent principal stage rounds

      7. 31.Round price for 2.3 GHz lots

      8. 32.Round price for 3.4 GHz lots

    2. CHAPTER 2 Assignment of standing high bid status

      1. 33.Assignment of standing high bid status by OFCOM after the end of each principal stage round

      2. 34.Process for assigning standing high bid status: ranking the bidders

      3. 35.Process for assigning standing high bid status: ranking the bids

      4. 36.Process for assigning standing high bid status: assigning standing high bid status to the bids

    3. CHAPTER 3 Winning principal stage bids and determination of base price

      1. 37.Determination of the winning principal stage bids

      2. 38.Bids with standing high bid status becoming winning principal stage bids

      3. 39.2.3 GHz bids in respect of which standing high bid status was withdrawn becoming winning principal stage bids

      4. 40.3.4 GHz bids in respect of which standing high bid status was withdrawn becoming winning principal stage bids

      5. 41.Determination of base price

      6. 42.Determination of total base price

    4. CHAPTER 4 Constraints for principal stage bids, withdrawals of standing high bid status and carrying forward an eligibility limit

      1. SECTION 1 Constraints for principal stage bids

        1. 43.Maximum number of principal stage bids for 2.3 GHz lots and 3.4 GHz lots

        2. 44.Overall bid constraint rule

        3. 45.Number of principal stage bids following assignment of standing high bid status

        4. 46.3.4 GHz minimum requirement

      2. SECTION 2 Withdrawal of Standing High Bid Status

        1. 47.Withdrawal of standing high bid status

      3. SECTION 3 Request by a bidder to carry forward its eligibility limit

        1. 48.Request by a bidder to carry forward its eligibility limit

    5. CHAPTER 5 Eligibility

      1. 49.Eligibility rule

      2. 50.Determination of a bidder’s eligibility limit

      3. 51.Eligibility points used by a bidder

      4. 52.Eligibility event

    6. CHAPTER 6 Deposit constraint

      1. 53.Deposit constraint on bidding

    7. CHAPTER 7 Information released during and following the principal stage

      1. 54.Notice to be given to bidders before each principal stage round

      2. 55.Notification of information to bidders after the end of each principal stage round

      3. 56.Publication of information at the end of each day during the principal stage

      4. 57.Notification of results of the principal stage to bidders

      5. 58.Publication of results of the principal stage

    8. CHAPTER 8 Procedure for principal stage

      1. 59.Submission of principal stage form to OFCOM

      2. 60.Alternative method for submission of principal stage form

      3. 61.Incomplete or defective principal stage form

      4. 62.Notification that principal stage form is not valid

    9. CHAPTER 9 Deposits during and following the principal stage

      1. 63.Deposits during the principal stage

      2. 64.Required final principal stage deposit

  8. PART 7 Assignment stage

    1. CHAPTER 1 Assignment stage: Preliminary

      1. 65.Assignment stage

    2. CHAPTER 2 Assignment without bidding

      1. 66.Assignment of numbered 2.3 GHz lots without bidding

      2. 67.Assignment of numbered 3.4 GHz lots without bidding

    3. CHAPTER 3 Assignment by bidding

      1. 68.Assignment of numbered 2.3 GHz lots by bidding

      2. 69.Assignment of numbered 3.4 GHz lots by bidding

      3. 70.Assignment stage round

      4. 71.Assignment stage form

    4. CHAPTER 4 2.3 GHz frequency assignments determined by bidding

      1. 72.Bidding for numbered 2.3 GHz lots in the assignment stage

      2. 73.Preparing a 2.3 GHz assignment stage option list for each bidder

      3. 74.2.3 GHz assignment stage bids

      4. 75.Determination of the winning 2.3 GHz assignment stage bids

      5. 76.Determination of 2.3 GHz additional prices

    5. CHAPTER 5 3.4 GHz frequency assignments determined by bidding

      1. 77.Bidding for numbered 3.4 GHz lots in the assignment stage

      2. 78.Preparing a 3.4 GHz assignment stage option list for each bidder if the pre-existing licence holder is a bidder and did apply for a replacement licence

      3. 79.Preparing a 3.4 GHz assignment stage option list for each bidder if the pre-existing licence holder is not a bidder or is a bidder but did not apply for a replacement licence

      4. 80.3.4 GHz assignment stage bids

      5. 81.Determination of the winning 3.4 GHz assignment stage bids

      6. 82.Valid combinations of 3.4 GHz assignment stage bids where the pre-existing licence holder is a bidder and did apply for a replacement licence

      7. 83.Valid combinations of 3.4 GHz assignment stage bids where the pre-existing licence holder is not a bidder or is a bidder but did not apply for a replacement licence

      8. 84.Determination of 3.4 GHz additional prices

    6. CHAPTER 6 Procedure and further deposit for assignment stage

      1. 85.Notice to bidders before the assignment stage round

      2. 86.Submission of assignment stage form to OFCOM

      3. 87.Alternative method for submission of assignment stage form

      4. 88.Incomplete or defective assignment stage form

      5. 89.Required assignment stage deposit

      6. 90.Notification of results of the assignment stage

  9. PART 8 Grant Stage

    1. CHAPTER 1 Licences available, the determination of licence fees and the precise frequencies for particular licences

      1. 91.Interpretation

      2. 92.Determination of licences, licence fees and frequencies associated with particular licences

      3. 93.Licences which may be granted under this award process

      4. 94.Licence fee payable by a winning bidder for a 2.3 GHz licence

      5. 95.Licence fee payable by a winning bidder for a 2.3 GHz withdrawn lot licence

      6. 96.Licence fee payable by a winning bidder for a 3.4 GHz licence

      7. 97.Licence fee payable by a winning bidder for a 3.4 GHz withdrawn lot licence

      8. 98.Licence fee payable by the pre-existing licence holder for a replacement licence

      9. 99.Particular frequencies to be included in 2.3 GHz licences and 2.3 GHz withdrawn lot licences

      10. 100.Particular frequencies to be included in 3.4 GHz licences and 3.4 GHz withdrawn lot licences granted to a winning bidder where the pre-existing licence holder is not a bidder or where the pre-existing licence holder is a bidder but did not apply for a replacement licence

      11. 101.Particular frequencies to be included in any 3.4 GHz licence, 3.4 GHz withdrawn lot licence and replacement licence granted to the pre-existing licence holder where it is a bidder and did apply for a replacement licence

    2. CHAPTER 2 Withdrawn lot licences

      1. 102.Acceptance or refusal of the withdrawn lot licence

      2. 103.Refusal payment for withdrawn lot licences

    3. CHAPTER 3 Total auction sum

      1. 104.Determination of the total auction sum payable by winning bidders to OFCOM

      2. 105.Notification of the total auction sum payable by winning bidders to OFCOM

      3. 106.Further payment where the amount of a winning bidder’s deposit is less than its total auction sum

    4. CHAPTER 4 Grant of licences

      1. 107.Entitlement to the grant of licences

      2. 108.Grant of licences

    5. CHAPTER 5 Completion of the award process

      1. 109.Refunds

      2. 110.Notification to bidders following the grant of licences

      3. 111.Completion of the award process

  10. PART 9 Activity rules

    1. 112.Forfeit of deposit and exclusion from award process

    2. 113.Bids made by an excluded bidder

    3. 114.Exclusion of the pre-existing licence holder

    4. 115.Events

  11. PART 10 MISCELLANEOUS

    1. 116.General power of exclusion

    2. 117.Notification to OFCOM

    3. 118.Changes to timing or location

    4. 119.Changes to round times and use of electronic auction system

    5. 120.Rerunning rounds

    6. 121.Refunds

    7. 122.Deposits

  12. Signature

    1. SCHEDULE 1

      Lots

    2. SCHEDULE 2

      Application form and warranty

      1. 1. Details of the applicant

      2. 2. Authorised persons

      3. 3. Directors or members of managing body

      4. 4. Applicant group

      5. 5. Qualification to bid

      6. 6. Other information

      7. 7. Existing spectrum holdings

      8. 8. Warranty

      9. 9. 3.4 GHz minimum requirement selection

    3. SCHEDULE 3

      Document for member of applicant’s applicant group or bidder group who is not an associate

      1. Applicant/bidder

      2. [Insert name of person to be included in applicant or bidder group who is not an associate]

    4. SCHEDULE 4

      Declaration to be made by the pre-existing licence holder

    5. SCHEDULE 5

      Determination of 2.3 GHz additional price

      1. 1.Additional price

      2. 2.First requirement

      3. 3.Second requirement

      4. 4.Third requirement

      5. 5.Fourth requirement

      6. 6.Interpretation

    6. SCHEDULE 6

      Determination of 3.4 GHz additional price

      1. 1.Additional price

      2. 2.First requirement

      3. 3.Second requirement

      4. 4.Third requirement

      5. 5.Fourth requirement

      6. 6.Interpretation

    7. SCHEDULE 7

      Frequency bands for existing immediately useable spectrum holdings

    8. SCHEDULE 8

      Frequency bands for existing overall spectrum holdings

  13. Explanatory Note

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill