Chwilio Deddfwriaeth

The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2016

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)
 Help about opening options

Dewisiadau Agor

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Amendments in relation to minerals permitted development

This adran has no associated Memorandwm Esboniadol

14.  In Part 17 of Schedule 2 (mining and mineral exploration)—

(a)in Class J, in paragraph J.1—

(i)for sub-paragraph (c), substitute—

(c)any operation would be carried out within a National Park, an area of outstanding national beauty, a site of archaeological interest, a site of special scientific interest or the Broads;; and

(ii)in sub-paragraph (g), for “12” substitute “15”;

(b)after Class J, insert—

Class JA – temporary use of land etc in respect of petroleum exploration

Permitted development

JA.  Development on any land during a period not exceeding 28 consecutive days consisting of the drilling of boreholes for the purposes of—

(a)carrying out groundwater monitoring;

(b)carrying out seismic monitoring; or

(c)locating and appraising the condition of mines,

which is preparatory to potential petroleum exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those drilling, monitoring or locating and appraising operations.

Development not permitted

JA.1.  Development is not permitted by Class JA if—

(a)any operation would be carried out within 50 metres of any part of an occupied residential building or a building occupied as a hospital or school;

(b)any operation would be carried out within a National Park, an area of outstanding natural beauty, a site of archaeological interest, a site of special scientific interest or the Broads;

(c)any explosive charge of more than 1 kilogram would be used;

(d)any structure assembled or provided would exceed 15 metres in height, or, where the structure would be within 3 kilometres of the perimeter of an aerodrome, 3 metres in height;

(e)in the case of boreholes for locating and appraising the condition of mines, the borehole exceeds 160 metres in depth; or

(f)drilling would be carried out within a protected groundwater source area.

Conditions

JA.2.  Development is permitted by Class JA subject to the following conditions—

(a)no operations are carried out between 6.00pm and 7.00am;

(b)no trees on the land are removed, felled, lopped or topped and no other thing is done on the land likely to harm or damage any trees, unless the mineral planning authority have so agreed in writing;

(c)within a period of 28 days from the cessation of operations unless the mineral planning authority have agreed otherwise in writing—

(i)any structure permitted by Class JA and any waste material arising from other development so permitted is removed from the land;

(ii)any borehole is adequately sealed;

(iii)the surface of the land on which any operations have been carried out is levelled and any topsoil replaced as the uppermost layer, and

(iv)the land is, so far as is practicable, restored to its condition before the development took place, including the carrying out of any necessary seeding and replanting;

(d)the developer notifies the Environment Agency and the relevant drinking water supply undertaker in writing of its intention to carry out the development (specifying the nature and location of the development), and no development takes place until 28 days after that notification; and

(e)in the case of boreholes for locating and appraising the condition of mines, the developer notifies the Coal Authority in writing of its intention to carry out the development (specifying the nature and location of the development), and no development takes place until 28 days after that notification.

Interpretation of Class JA

JA.3.(1) For the purposes of Class JA, “protected groundwater source area” means any land at a depth of less than 1,200 metres beneath a relevant surface area.

(2) In paragraph (1), “relevant surface area” means any land at the surface that is—

(a)within 50 metres of a point at the surface at which water is abstracted from underground strata and which is used to supply water for domestic or food production purposes, or

(b)within or above a zone defined by a 50-day travel time for groundwater to reach a groundwater abstraction point that is used to supply water for domestic or food production purposes.;

(c)in Class K, in paragraph K.1(f), for “12” substitute “15”;

(d)after Class K, insert—

Class KA – use of land etc in respect of petroleum exploration

Permitted development

KA.  Development on any land consisting of the drilling of boreholes for the purposes of—

(a)carrying out groundwater monitoring;

(b)carrying out seismic monitoring; or

(c)locating and appraising the condition of mines,

which is preparatory to potential petroleum exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those drilling, monitoring, or locating and appraising operations.

Development not permitted

KA.1.  Development is not permitted by Class KA if—

(a)the developer has not previously notified the mineral planning authority in writing of its intention to carry out the development (specifying the nature and location of the development);

(b)the relevant period has not elapsed;

(c)any explosive charge of more than 2 kilograms would be used;

(d)any structure assembled or provided would exceed 15 metres in height; or

(e)in the case of boreholes for locating and appraising the condition of mine operations, the borehole exceeds 160 metres in depth.

Conditions

KA.2.  Development is permitted by Class KA subject to the following conditions—

(a)the development is carried out in accordance with the details in the notification referred to in paragraph KA.1(a), unless the mineral planning authority has otherwise agreed in writing;

(b)no trees on the land are removed, felled, lopped or topped and no other thing is done on the land likely to harm or damage any trees, unless specified in detail in the notification referred to in paragraph KA.1(a) or the mineral planning authority has otherwise agreed in writing;

(c)within a period of 28 days from operations ceasing, unless the mineral planning authority has agreed otherwise in writing—

(i)any structure permitted by Class KA and any waste material arising from other development so permitted is removed from the land;

(ii)any borehole is adequately sealed;

(iii)the surface of the land is levelled and any topsoil replaced as the uppermost layer; and

(iv)the land is, so far as is practicable, restored to its condition before the development took place, including the carrying out of any necessary seeding and replanting;

(d)the developer notifies the Environment Agency and the relevant drinking water supply undertaker in writing of its intention to carry out the development (specifying the nature and location of the development), and no development takes place until 28 days after that notification;

(e)in the case of boreholes for locating and appraising the condition of mines, the developer notifies the Coal Authority in writing of its intention to carry out the development (specifying the nature and location of the development), and no development takes place until 28 days after that notification; and

(f)the development ceases no later than a date which is—

(i)in the case of development involving the drilling of boreholes for groundwater monitoring, 24 months; and

(ii)in other cases, 6 months,

after the elapse of the relevant period, unless the mineral planning authority has otherwise agreed in writing.

Interpretation of Class KA

KA.3.  For the purposes of Class KA, “relevant period” means the period elapsing—

(a)where a direction is not issued under article 5, 28 days after the notification referred to in paragraph KA.1(a) or, if earlier, on the date on which the mineral planning authority notifies the developer in writing that it will not issue such a direction, or

(b)where a direction is issued under article 5, 28 days from the date on which notice of that decision is sent to the Secretary of State, or, if earlier, the date on which the mineral planning authority notifies the developer that the Secretary of State has disallowed the direction.; and

(e)in paragraph N.1 (interpretation of Part 17)—

(i)after the definition of “coal mining operations”, insert—

“groundwater” has the same meaning as in regulation 2(1) of the Environmental Permitting (England and Wales) Regulations 2010(1);; and

(ii)after the definition of “normal and regular use”, insert—

“relevant drinking water supply undertaker” means any water undertaker in whose area of appointment development will take place and, in the case where the development is likely to affect water resources in the area of appointment of another water undertaker, that undertaker;.

(1)

S.I. 2010/675, to which there are amendments not relevant to these Regulations.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill