Chwilio Deddfwriaeth

The Building Regulations 2010

Changes to legislation:

The Building Regulations 2010 is up to date with all changes known to be in force on or before 18 June 2024. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

  1. Introductory Text

  2. PART 1 General

    1. 1.Citation and commencement

    2. 2.Interpretation

  3. PART 2 Control of Building Work

    1. 3.Meaning of building work

    2. 4.Requirements relating to building work

    3. 5.Meaning of material change of use

    4. 6.Requirements relating to material change of use

    5. 7.Materials and workmanship

    6. 8.Limitation on requirements

    7. 9.Exempt buildings and work

    8. 10.Exemption of the Mayor’s Office for Policing and Crime from procedural requirements

    9. 11.Power to dispense with or relax requirements

  4. PART 3 Notices, Plans and Certificates

    1. 12.Giving of a building notice or deposit of plans

    2. 13.Particulars and plans where a building notice is given

    3. 14.Full plans

    4. 15.Consultation with sewerage undertaker

    5. 16.Notice of commencement and completion of certain stages of work

    6. 17.Completion certificates

    7. 17A.Certificate for building occupied before work is completed

    8. 18.Unauthorised building work

  5. PART 4 Supervision of Building Work Otherwise than by Local Authorities

    1. 19.Supervision of building work otherwise than by local authorities

  6. PART 5 Self-certification schemes and third party certification schemes

    1. 20.Provisions applicable to self-certification schemes

    2. 20A.Provisions applicable to third party certification schemes

  7. PART 6 Energy Efficiency Requirements

    1. 21.Application of energy efficiency requirements

    2. 22.Requirements relating to a change to energy status

    3. 23.Requirements for the renovation or replacement of thermal elements

    4. 24.Methodology of calculation and expression of energy performance

    5. 25.Minimum energy performance requirements for new buildings

    6. 25A.Consideration of high-efficiency alternative systems for new buildings

    7. 25B.Nearly zero-energy requirements for new buildings

    8. 25C.New buildings: minimum energy performance requirements

    9. 26.CO2 emission rates for new buildings

    10. 26A.Primary energy consumption rates for new buildings

    11. 26B.Fabric performance values for new dwellings

    12. 27.CO2 emission rate calculations

    13. 27A.Fabric energy efficiency rate calculations

    14. 27B.Fabric performance values calculations

    15. 28.Consequential improvements to energy performance

    16. 29.Energy performance certificates

    17. 29A.Recommendation reports

    18. 30.Energy assessors

    19. 31.Related party disclosures

    20. 32.Duty of care

    21. 33.Right to copy documents

    22. 34.Application of building regulations to educational buildings, buildings of statutory undertakers and Crown Buildings

    23. 35.Interpretation of Part 6

  8. PART 7 Water Efficiency

    1. 36.Water efficiency of new dwellings

    2. 37.Wholesome water consumption calculation

  9. PART 7A Automatic fire suppression systems

    1. 37A.Provision of automatic fire suppression systems

    2. 37B.Requirements of automatic fire suppression systems

  10. PART 8 Information to be Provided by the Person Carrying Out Work

    1. 38.Fire safety information

    2. 39.Information about ventilation

    3. 40.Information about use of fuel and power

  11. PART 9 Testing and Commissioning

    1. 41.Sound insulation testing

    2. 42.Mechanical ventilation air flow rate testing

    3. 43.Pressure testing

    4. 44.Commissioning

  12. PART 10 Miscellaneous

    1. 45.Testing of building work

    2. 46.Sampling of material

    3. 47.Contravention of certain regulations not to be an offence

    4. 48.Electronic service of documents

    5. 49.Transitional provisions: interpretation

    6. 50.Transitional provisions: work already started before 1st October

    7. 51.Transitional provisions: work for which notification is not required

    8. 52.Transitional provisions: notice given or plans deposited before 1st October 2010

    9. 53.Transitional and saving provisions: earlier Building Regulations

    10. 54.Revocations and consequential amendments

  13. Signature

    1. SCHEDULE 1

      Requirements

    2. SCHEDULE 2

      Exempt Buildings and Work

      1. CLASS 1

        1. 1.Buildings controlled under other legislation

        2. 2.Any building (other than a building containing a dwelling or...

        3. 3.A building included in the schedule of monuments maintained under...

      2. CLASS 2

        1. 1.Buildings not frequented by people

        2. 2.The description of buildings in paragraph 1 does not include...

      3. CLASS 3

        1. 1.Greenhouses and agricultural buildings

        2. 2.A building used, subject to paragraph 3, for agriculture, or...

        3. 3.The descriptions of buildings in paragraphs 1 and 2 do...

        4. 4.In paragraph 2, “agriculture” includes horticulture, fruit growing, the growing...

      4. CLASS 4

        1. Temporary buildings

      5. CLASS 5

        1. 1.Ancillary buildings

        2. 2.A building on the site of construction or civil engineering...

        3. 3.A building, other than a building containing a dwelling or...

      6. CLASS 6

        1. 1.Small detached buildings

        2. 2.A detached building designed and intended to shelter people from...

        3. 3.A detached building, having a floor area which does not...

      7. CLASS 7

        1. Extensions

        2. where the floor area of that extension does not exceed...

    3. SCHEDULE 3

      Self-certification Schemes and Exemptions from Requirement to Give Building Notice or Deposit Full Plans

    4. SCHEDULE 3A

      Third Party Certification Schemes and Exemptions from Requirement to Give Building Notice or Deposit Full Plans

    5. SCHEDULE 4

      Descriptions of Work where no Building Notice or Deposit of Full Plans Required

      1. 1.Work consisting of— (a) replacing any fixed electrical equipment which...

      2. 2.Work which— (a) is not in a kitchen, or a...

      3. 3.Work on— (a) telephone wiring or extra-low voltage wiring for...

      4. 3A.Installation of thermal insulation to suspended timber floors where the...

      5. 4.For the purposes of this Schedule— ... “self-contained” in relation...

    6. SCHEDULE 4A

      Green deal information

      1. PART 1 Green deal information to be included in energy performance certificates

        1. 1.The information about a green deal plan to be included...

        2. 2.The date on which the energy performance certificate ceases to...

        3. 3.A statement indicating that a new energy performance certificate should...

        4. 4.A statement— (a) indicating that improvements have been installed at...

        5. 5.A statement indicating— (a) that a green deal plan is...

        6. 6.Where the green deal plan is a regulated consumer credit...

        7. 7.Where the green deal plan is not a regulated consumer...

        8. 8.A statement indicating that— (a) the outstanding credit under the...

        9. 9.Where a term has been included in a green deal...

        10. 10.The unique reference number assigned to the green deal plan....

        11. 11.The name of the person (“G”) who is the green...

        12. 12.G’s electronic mail address and telephone number.

        13. 13.The date on which the payment period starts and the...

        14. 14.The amount payable under the green deal plan—

        15. 15.The rate of interest charged under the green deal plan....

        16. 16.A statement indicating whether the interest rate charged under the...

        17. 17.Where, in accordance with regulation 33(b) of the Green Deal...

        18. 18.The estimated first year savings.

        19. 19.Where the green deal property is a domestic property, a...

        20. 20.Where the green deal property is a non-domestic property, a...

        21. 21.In respect of each improvement installed at the green deal...

        22. 22.A statement advising the person receiving the energy performance certificate—...

        23. 23.A statement indicating that— (a) the improvements installed under the...

        24. 24.A statement indicating that further information is contained in the...

        25. 25.Where G knows or has reasonable cause to believe that...

        26. 26.Where G knows or has reasonable cause to believe that...

      2. PART 2 Interpretation

    7. SCHEDULE 5

      Revocation of Regulations

    8. SCHEDULE 6

      Consequential Amendments

      1. 1.In the Building (Local Authority Charges) Regulations 2010 —

      2. 2.In the Energy Performance of Buildings (Certificates and Inspections) (England...

  14. Explanatory Note

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill