SCHEDULE 1Scheduled works

(introduced by section 1)

In the local government area of the City of Edinburgh—

  • Work No. 1—A road tramway 463 metres in length (single line) extending from its junction with the termination of Work No. 3 at a point on Princes Street near the Sir Walter Scott Monument, along Princes Street, South St. Andrew Street, the east side of St. Andrew Square, North St. Andrew Street to a point on North St. Andrew Street south of the junction with Queen Street.

  • Work No. 2—A road tramway 495 metres in length (single line) extending from its junction with the termination of Work No. 3 at a point on Princes Street near the Sir Walter Scott Monument, along South St. David Street, the west side of St. Andrew Square, North St. David Street, Queen Street and North St. Andrew Street to its junction with the termination of Work No. 1 on North St. Andrew Street.

  • Work No. 3—A road tramway 1724 metres in length (double line) extending from its junction with the termination of Work No. 4, along Haymarket Terrace, Clifton Terrace, West Maitland Street, Shandwick Place, Rutland Place and Princes Street to its junction with the commencement of Work No. 1 at a point near the Sir Walter Scott Monument.

  • Work No. 4—A tramroad 670 metres in length (double line, with additional layover siding of approximately 100 metres in length) and associated retaining wall structures extending from a point close to 57 Balbirnie Place along the reserved public transport corridor between Balbirnie Place, CA House, Elgin House and the railway, on-road along Haymarket Yards, before running off-road to the north of Rosebery House to a point on the south side of Haymarket Terrace near Haymarket Station.

  • Work No. 5—A tramroad 1650 metres in length (double line) extending from its junction with the commencement of Work No. 4, crossing Russell Road by bridge, crossing Roseburn Street by bridge, crossing the Water of Leith by viaduct and crossing Balgreen Road by bridge, to a point close to the Jenners Depository, including construction of a viaduct along the north side of the main railway line.

  • Work No. 5A—A path and cycleway 300 metres in length extending from a junction with Russell Road south across the disused railway lines to a junction with Balbirnie Place near 46 Balbirnie Place.

  • Work No. 5B—A tramroad 105 metres in length (double line) extending from a point on Work No. 5 to the east of Russell Road, crossing Russell Road by bridge, to a point on the disused railway lines near 46 Balbirnie Place.

  • Work No. 5C—An access road 142 metres in length extending from a junction with Russell Road near 20 Russell Road, crossing Work No. 5 on the level, to a point near the main railway line sidings.

  • Work No. 5D—An access road 66 metres in length extending from a junction with Roseburn Street near the entrance to Murrayfield Stadium, under Work No. 5, to a point near the main railway sidings.

  • Work No. 5E—An access road 30 metres in length extending from a junction with Roseburn Street north of the junction with West Approach Road, under Work No. 5, to a point near Murrayfield Stadium.

  • Work No. 5F—An access road 116 metres in length extending from a junction with Balgreen Road near the junction with Whitson Road, along Pansy Walk and northeast to a point near the main railway line.

  • Work No. 5G—An access road 305 metres in length extending from a point near where the main railway line crosses Leith Water to a point near where the main railway line crosses Balgreen Road, including a junction with the termination of Work No. 5F.

  • Work No. 5H—An access road 172 metres in length extending from a junction with Balgreen Road south of the junction with Baird Drive, crossing Work No. 5 on the level, to a point close to the Jenners Depository.

  • Work No. 6—A tramroad 1188 metres in length (double line) extending from its junction with the termination of Work No. 5, crossing the main railway lines by bridge, to Saughton Mains Street.

  • Work No. 6A—Diversion of Carrick Knowe footpath 42 metres in length extending from a junction with Stenhouse Drive, crossing Work No. 6 on the level, to a point on the existing Carrick Knowe footpath.

  • Work No. 7—A tramroad 3150 metres in length (double line) extending from its junction with the termination of Work No. 6, crossing Saughton Road by bridge, crossing Broomhouse Road by bridge, crossing South Gyle Access by bridge and crossing the main railway line by viaduct, to a point near Lochside Way, including provision of a footpath and cycleway.

  • Work No. 7A—An access road 251 metres in length extending from a junction with Cultins Road to a junction with the roundabout at Hermiston Gait.

  • Work No. 8—A tramroad 950 metres in length (double line) extending from its junction with the termination of Work No. 7, crossing Lochside Avenue on the level, crossing South Gyle Broadway on the level and terminating at a point between South Gyle Broadway and the car park of the Gyle Shopping Centre.

  • Work No. 9—A tramroad 4099 metres in length (double line) extending from its junction with the termination of Work No. 8, under the A8 Glasgow Road, crossing the access road to Meadowfield Farm on the level, crossing the access road to Gogar Castle on the level, crossing the access road to Gogar Farm on the level, crossing Gogar Burn by bridge, crossing Gogar Mains Farm Road on the level, past the Ingliston Park and Ride, crossing the access road to Edinburgh Airport on the level and terminating at a point to the south of the Edinburgh Airport terminal building, including construction of a depot north of the A8 Glasgow Road and construction of a car park for the Ingliston Park and Ride.

  • Work No. 9A—An access road 585 metres in length extending from a junction with the access road to Meadowfield Farm along the access road to Castle Gogar to a junction with the A8 Glasgow Road.

  • Work No. 10—A tramroad 530 metres in length (double line) extending from its junction with Work No. 9 at the Ingliston Park and Ride, crossing Eastfield Road on the level, to a point near the A8 Glasgow Road north of No. 4 Ingliston, including construction of a car park for the Ingliston Park and Ride.

  • Work No. 11—A road tramway 890 metres in length (double line) extending from its junction with the termination of Work No. 10, crossing Ingliston Road on the level, along the A8 Glasgow Road to a point south of the junction with Hallyards Road.

  • Work No. 12—A tramroad 950 metres in length (double line) extending from its junction with the termination of Work No. 11, crossing Station Road on the level, to Harvest Road.

  • Work No. 12A—A path 84 metres in length, crossing work No. 12 on the level.

  • Work No. 13—A road tramway 1817 metres in length (double line) extending from its junction with the termination of Work No. 12, along Harvest Road, under the M9 motorway, along Cliftonhall Road, along Newbridge Industrial Estate Road and terminating at a point west of the Newbridge Roundabout.

  • Work No. 13A—A revision to the road layout 154 metres in length of the Newbridge Industrial Estate Access Road at the termination of Work No. 13.

  • Work No. 13B—A revision to the road layout 386 metres in length of the B7030 near Newbridge Industrial Estate and the Newbridge Roundabout at the termination of Work No. 13.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill