- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
5.—(1) During the construction of the works the Council may take from the said Kilfinnan Burn such water as they may require for such construction.
(2) After the completion of the works the Council shall not—
(a)take water from the said Kilfinnan Burn through the supply pipe (Work No.4) so as to reduce the rate of flow of water through the discharge pipe (Work No.3) below 170 cubic metres per day as measured through or over an approved gauge (part of Work No.2);
(b)in any one day take from the said Kilfinnan Burn through the supply pipe (Work No.4) a quantity of water greater than 250 cubic metres as measured through or over an approved gauge (part of Work No.2).
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: