Chwilio Deddfwriaeth

Channel Tunnel Act 1987

Changes over time for: Part III

 Help about opening options

Alternative versions:

Status:

Point in time view as at 01/02/1991.

Changes to legislation:

There are currently no known outstanding effects for the Channel Tunnel Act 1987, Part III. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Part IIIU.K. The Railways Board’s Scheduled Works

In the London borough of Lambeth—

  • Work No. 21—A railway (705 metres in length), at Waterloo station on the west side of the railway between that station and Clapham Junction, commencing at a point on platforms 19 and 20 serving two of the Windsor lines of the said railway 61 metres south of the buffer stops of those two lines and terminating by a junction with the said Windsor lines at a point 15 metres north of the bridge carrying the said railway over Carlisle Lane at its junction with Hercules Road, including bridges over Westminster Bridge Road, Upper Marsh, Carlisle Lane, Centaur Street and Virgil Street and viaducts over lands between or adjoining those roads:

  • Work No. 21A—An access road at Waterloo station, commencing at a point on the arched structure carrying the said station 115 metres south-west of the buffer stop of the Windsor line served by platform 21 and terminating by a junction with Leake Street at a point 26 metres south-east of the junction of that street with York Road:

  • Work No. 21B—An access road at Waterloo station, commencing at a point in the existing access road serving the said station 28 metres east of its junction with Westminster Bridge Road and terminating at the point in Addington Street where that street branches to join Westminster Bridge Road:

In the London borough of Wandsworth—

  • Work No. 23—A railway (984 metres in length) at Stewart’s Lane, Battersea, commencing by a junction with the Windsor lines of the railway between Waterloo and Clapham Junction at a point 480 metres north-east of the bridge carrying that railway over Thessaly Road and terminating by a junction with the railway between Victoria and Ashford at a point 225 metres south-east of the bridge carrying that railway over the said railway between Waterloo and Clapham Junction, including bridges over the access road to Covent Garden Market, Thessaly Road and Stewart’s Road and viaducts over lands between or adjoining those roads and the said railway between Waterloo and Clapham Junction:

  • Work No. 23A—A railway (1012 metres in length) at Stewart’s Lane, Battersea, on the north-west side of the railway between Waterloo and Clapham Junction, commencing by a junction with the Windsor lines of that railway at a point 480 metres north-east of the bridge carrying that railway over Thessaly Road and terminating by a junction with those lines at a point 1 metre north-east of the viaduct carrying the South London line between London Bridge and Victoria over that railway, including a viaduct and bridges over the said access road and Thessaly Road:

  • Work No. 23B—A railway (328 metres in length) at Stewart’s Lane, Battersea, on the south-east side of the railway between Waterloo and Clapham Junction, commencing by a junction with the Weymouth lines of that railway at a point 1 metre south-west of the bridge carrying that railway over Thessaly Road and terminating by a junction with those lines at a point 1 metre north-east of the viaduct carrying the railway between Victoria and Ashford over that railway, including bridges over Stewart’s Road and the railway between Victoria and Stewart’s Lane Junction:

  • Work No. 24—A railway (489 metres in length) at Clapham Junction (being a reinstatement of a former railway), commencing by a junction with the Windsor lines of the railway between Waterloo and Clapham Junction at a point 5 metres south-west of the bridge carrying those lines over Culvert Road and terminating by a junction with the West London Extension railway, between Longhedge Junction and Kensington Olympia, at a point 3 metres south-east of the bridge carrying that railway over Latchmere Road:

In the London boroughs of Ealing and Hammersmith and Fulham and the Royal borough of Kensington and Chelsea—

  • Work No. 25A—A railway (1716 metres in length) at Old Oak Common, commencing in the London borough of Ealing at a point 205 metres south-west of the bridge carrying the railway between Reading and Paddington over the Central Line railway between North Acton and East Acton and terminating in the London borough of Hammersmith and Fulham by a junction with the West London railway, between Mitre Bridge Junction and Kensington Olympia, at a point 3 metres north-west of the bridge carrying that railway over Scrubs Lane, including bridges over the said Central Line and Old Oak Common Lane:

  • Work No. 25B—A railway (2300 metres in length) at Old Oak Common, commencing in the London borough of Ealing by a junction with Work No. 25A at a point 260 metres east of Old Oak Common Lane, passing through the London borough of Hammersmith and Fulham and terminating in the Royal borough of Kensington and Chelsea at a point 100 metres north-east of the junction of Barlby Gardens with Barlby Road:

  • Work No. 25C—A railway (290 metres in length) at Old Oak Common, commencing by a junction with the railway between Reading and Paddington at a point 138 metres west of the bridge carrying the said West London railway over that railway and terminating by a junction with the Victoria branch railway at a point 85 metres south-east of the eastern portal of Mitre Tunnel on that railway, including the removal of that tunnel and the substitution of bridges to carry Scrubs Lane and the said West London railway over the said Victoria branch railway:

In the district of Tandridge (parishes of Bletchingley and Nutfield), in the county of Surrey—

  • Work No. 26—A railway (1120 metres in length) at Nutfield on the north side of the railway between Redhill and Ashford, commencing by a junction with that railway at a point 63 metres east of the bridge carrying that railway over Coopers Hill Road and terminating by a junction with that railway at a point 20 metres west of the bridge carrying Outwood Lane over that railway:

  • Work No. 26A—A cut (115 metres in length) at Nutfield forming a diversion of Nutfield Brook, commencing at a point 22 metres north of the southern head-wall of the culvert conducting that stream under the railway between Redhill and Ashford and terminating at a point 98 metres north-east of that point of commencement:

In the borough of Maidstone (parish of Lenham), in the county of Kent—

  • Work No. 28A—A railway (543 metres in length) on the north side of the railway between London and Ashford, commencing by a junction with that railway at a point 560 metres north-west of the bridge carrying Ham Lane over that railway and terminating by a junction with that railway at a point 18 metres north-west of that bridge:

  • Work No. 28B—A railway (543 metres in length) on the south side of the railway between London and Ashford, commencing by a junction with that railway at a point 170 metres north-west of the bridge carrying Lenham Road over that railway and terminating by a junction with that railway at a point 365 metres south-east of that bridge:

In the borough of Ashford (town of Ashford), in the county of Kent—

Works Nos. 29A and 29B—Widenings on the north sides of the bridges carrying the railways between Ashford and Canterbury, Folkestone West and Rye over the rivers Great Stour and East Stour:

In the district of Shepway (parishes of Newington and Saltwood), in the county of Kent—

  • Work No. 30—A railway (700 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with Work No. 1 at its commencement:

  • Work No. 30A—A railway (1270 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 375 metres east of the eastern portal of Saltwood Tunnel and terminating by a junction with Work No. 30 at a point 125 metres from the termination of that work:

  • Work No. 30B—A railway (558 metres in length), being a deviation of the railway between Ashford and Folkestone West, commencing by a junction with that railway at the said point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with that railway at a point 415 metres east of that bridge.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill