Chwilio Deddfwriaeth

Directive (EU) 2019/944 of the European Parliament and of the CouncilDangos y teitl llawn

Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012/27/EU (recast) (Text with EEA relevance)

 Help about what version

Pa Fersiwn

 Help about UK-EU Regulation

Mae hon yn Gyfarwyddeb sy’n deillio o’r UE

Close

Mae hon yn eitem o ddeddfwriaeth sy’n deillio o’r UE

Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE.

Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex.

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

Article 8Authorisation procedure for new capacity

1.For the construction of new generating capacity, Member States shall adopt an authorisation procedure, which shall be conducted in accordance with objective, transparent and non-discriminatory criteria.

2.Member States shall lay down the criteria for the grant of authorisations for the construction of generating capacity in their territory. In determining appropriate criteria, Member States shall consider:

(a)the safety and security of the electricity system, installations and associated equipment;

(b)the protection of public health and safety;

(c)the protection of the environment;

(d)land use and siting;

(e)the use of public ground;

(f)energy efficiency;

(g)the nature of the primary sources;

(h)the characteristics particular to the applicant, such as technical, economic and financial capabilities;

(i)compliance with measures adopted pursuant to Article 9;

(j)the contribution of generating capacity to meeting the overall Union target of at least a 32 % share of energy from renewable sources in the Union's gross final consumption of energy in 2030 referred to in Article 3(1) of Directive (EU) 2018/2001 of the European Parliament and of the Council(1);

(k)the contribution of generating capacity to reducing emissions; and

(l)the alternatives to the construction of new generating capacity, such as demand response solutions and energy storage.

3.Member States shall ensure that specific, simplified and streamlined authorisation procedures exist for small decentralised and/or distributed generation, which take into account their limited size and potential impact.

Member States may set guidelines for that specific authorisation procedure. Regulatory authorities or other competent national authorities, including planning authorities, shall review those guidelines and may recommend amendments thereto.

Where Member States have established particular land use permit procedures applying to major new infrastructure projects in generation capacity, Member States shall, where appropriate, include the construction of new generation capacity within the scope of those procedures and shall implement them in a non-discriminatory manner and within an appropriate time frame.

4.The authorisation procedures and criteria shall be made public. Applicants shall be informed of the reasons for any refusal to grant an authorisation. Those reasons shall be objective, non-discriminatory, well-founded and duly substantiated. Appeal procedures shall be made available to applicants.

(1)

Directive (EU) 2018/2001 of the European Parliament and the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (OJ L 328, 21.12.2018, p. 82).

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill