Search Legislation

Commission Decision of 19 December 2007 laying down rules for the implementation of Decision No 573/2007/EC of the European Parliament and of the Council establishing the European Refugee Fund for the period 2008 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document number C(2007) 6396) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2008/22/EC)

 Help about what version

What Version

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Status:

This is the original version as it was originally adopted in the EU.
This legislation may since have been updated - see the latest available (revised) version

  1. Introductory Text

  2. PART I INTRODUCTION

    1. CHAPTER 1 Subject and definitions

      1. Article 1.Subject matter

      2. Article 2.Definitions

  3. PART II PROVISIONS COMMON TO THE FOUR FUNDS

    1. CHAPTER 1 Designated authorities

      1. Article 3.Common authorities

      2. Article 4.Delegated authority

      3. Article 5.Outsourcing of tasks

    2. CHAPTER 2 Management and control systems

      1. Article 6.Manual of procedures

      2. Article 7.Implementation of the Fund by the responsible authority

      3. Article 8.Conditions under which the responsible authority acts as executing body

      4. Article 9.Selection and award procedure when the responsible authority acts as awarding body

      5. Article 10.Grant agreements with final beneficiaries when the responsible authority acts as awarding body

      6. Article 11.Implementation contracts

      7. Article 12.Determination of the final Community contribution

      8. Article 13.Technical assistance

      9. Article 14.Technical assistance expenditure in the case of a common authority

      10. Article 15.Verifications by the responsible authority

      11. Article 16.Audit trail

      12. Article 17.Audits of systems and audits of projects

      13. Article 18.Verifications by the certifying authority

    3. CHAPTER 3 Information to be provided regarding use of the Fund

      1. Article 19.Principle of proportionality

      2. Article 20.Description of management and control systems

      3. Article 21.Revision of the description of management and control systems

      4. Article 22.Programming documents

      5. Article 23.Revision of financial breakdown in annual programmes

      6. Article 24.Progress and final reports on implementation of annual programmes

      7. Article 25.Documents established by the audit authority

      8. Article 26.Documents established by the certifying authority

    4. CHAPTER 4 Reporting irregularities

      1. Article 27.Initial reporting — derogations

      2. Article 28.Reporting of follow-up — non-recovery

      3. Article 29.Contacts with Member States

      4. Article 30.Use of information

    5. CHAPTER 5 Information and publicity

      1. Article 31.Information for potential final beneficiaries

      2. Article 32.Information for final beneficiaries

      3. Article 33.Responsibilities of the responsible authority relating to information and publicity for the general public

      4. Article 34.Responsibilities of final beneficiaries relating to information and publicity for the general public

      5. Article 35.Technical characteristics of information and publicity for the operation

    6. CHAPTER 6 Personal data

      1. Article 36.Protection of personal data

    7. CHAPTER 7 Electronic exchange of documents

      1. Article 37.Electronic exchange of documents

      2. Article 38.Computer system for the exchange of documents

  4. PART III PROVISIONS SPECIFIC TO THE EUROPEAN REFUGEE FUND

    1. CHAPTER 1 Eligibility rules

      1. Article 39.Eligibility rules

    2. CHAPTER 2 Management and control systems

      1. Article 40.Emergency measures

      2. Article 41.Fixed amount for resettled persons

      3. Article 42.Implementation of annual programmes

  5. PART IV FINAL PROVISIONS

    1. Article 43.Addressees

  6. Signature

    1. ANNEX 1

      MODEL DESCRIPTION OF MANAGEMENT AND CONTROL SYSTEMS

      1.  Initial version  Revised version (number, date dd/mm/year) following...

      2. MEMBER STATE:

      3. FUND(S):

      4. MAIN CONTACT POINT:

      5. THE INFORMATION PROVIDED DESCRIBES THE SITUATION ON: …

      6. 1. IDENTIFICATION OF THE DESIGNATED AUTHORITIES

        1. 1.1. General information on the designated authorities

          1. 1.1.1. Short description of the choices made on the designation of...

          2. 1.1.2. Indication of whether these management and control systems are operational...

          3. 1.1.3. Indication of whether these management and control systems have been...

        2. 1.2. Organisation chart(s) of the entire body(-ies) within which the designated...

        3. 1.3. Responsible authority

          1. 1.3.1. The date and form of the formal designation of the...

          2. 1.3.2. Legal status of the responsible authority

          3. 1.3.3. Specification of the functions carried out directly by the responsible...

          4. 1.3.4. Organisation chart and specification of the functions of the units...

          5. 1.3.5. Information whether the responsible authority can also act as executing...

          6. 1.3.6. If the responsible authority is the same for more than...

        4. 1.4. The delegated authority(ies)

          1. 1.4.1. The reasons for establishing any delegated authority

          2. 1.4.2. The date and form of the formal designation of the...

          3. 1.4.3. Legal status of the delegated authority(ies)

          4. 1.4.4. Specification of the functions carried out directly by the delegated...

          5. 1.4.5. Organisation chart and specification of the functions of the units...

          6. 1.4.6. Information whether delegated authority(ies) can also act as executing body...

          7. 1.4.7. If the delegated authority(ies) is (are) the same for more...

        5. 1.5. Certifying authority

          1. 1.5.1. The date and form of the formal designation of the...

          2. 1.5.2. Legal status of the certifying authority

          3. 1.5.3. Specification of the functions carried out directly by the certifying...

          4. 1.5.4. Organisation chart and specification of the functions of the units...

          5. 1.5.5. If the certifying authority is the same for more than...

        6. 1.6. Audit authority

          1. 1.6.1. The date and form of the formal designation of the...

          2. 1.6.2. Legal status of the audit authority

          3. 1.6.3. Specification of the functions carried out directly by the audit...

          4. 1.6.4. Organisation chart and specification of the functions of the units...

          5. 1.6.5. Staff qualifications for the audit authority and (if applicable and/or...

          6. 1.6.6. If the audit authority is the same for more than...

          7. 1.6.7. If a responsible authority can also act as executing body...

      7. Guidance for sections 2–4

      8. First part of each table

      9. The description of the processes should include the tasks to...

      10. Second part of each table

      11. The checklist should be completed by indicating whether each target...

      12. If procedures are formalised, a reference to the document should...

      13. 2. FUNCTIONING OF DESIGNATED AUTHORITIES

      14. 3. OPERATIONAL AND FINANCIAL PROCESSES

      15. 4. INFORMATION MANAGEMENT

      16. 5. APPROVAL OF THE DESCRIPTION OF THE MANAGEMENT AND CONTROL SYSTEMS...

    2. ANNEX 2

      MODEL MULTI-ANNUAL PROGRAMME

      1.  Initial version  Revised version (number, date dd/mm/year) following...

      2. MEMBER STATE:

      3. FUND:

      4. RESPONSIBLE AUTHORITY:

      5. PERIOD COVERED:

      6. 1. SITUATION IN THE MEMBER STATE

        1. 1.1. The national situation and the migratory flows affecting it

        2. 1.2. The measures undertaken by the Member State so far

        3. 1.3. The total national resources allocated

      7. 2. ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE

        1. 2.1. The requirements in the Member State in relation to the...

        2. 2.2. The operational objectives of the Member State designed to meet...

      8. 3. STRATEGY TO ACHIEVE THE OBJECTIVES

        1. 3.1. Priority 1

        2. 3.2. Priority 2

        3. 3.3. Etc.

      9. 4. COMPATIBILITY WITH OTHER INSTRUMENTS

        1. 4.1. Priority 1

        2. 4.2. Priority 2

        3. 4.3. Etc.

      10. 5. FRAMEWORK FOR IMPLEMENTATION OF THE STRATEGY

        1. 5.1. The publication of the programme

        2. 5.2. The approach chosen to implement the principle of partnership

      11. 6. INDICATIVE FINANCING PLAN

        1. 6.1. Community contribution

          1. 6.1.1. Table

          2. 6.1.2. Comments on the figures/trends

        2. 6.2. Overall financing plan

          1. 6.2.1. Table

          2. 6.2.2. Comments on the figures/trends

    3. ANNEX 3

      MODEL ANNUAL PROGRAMME

      1.  Initial version  Revised version (number, date dd/mm/year) following...

      2. MEMBER STATE:

      3. FUND:

      4. RESPONSIBLE AUTHORITY:

      5. YEAR COVERED:

      6. 1. GENERAL RULES FOR SELECTION OF PROJECTS TO BE FINANCED UNDER...

      7. 2. CHANGES IN THE MANAGEMENT AND CONTROL SYSTEMS (if appropriate)

      8. 3. ACTIONS TO BE SUPPORTED BY THE PROGRAMME UNDER THE PRIORITIES...

        1. 3.1. Actions implementing priority 1

        2. 3.2. Actions implementing priority 2

        3. 3.3. Etc.

      9. 4. TECHNICAL ASSISTANCE

        1. 4.1. Purpose of the technical assistance

        2. 4.2. Expected quantified results

        3. 4.3. Visibility of EC funding

      10. 5. DRAFT FINANCING PLAN

    4. ANNEX 4

      MODEL PROGRESS REPORT ON IMPLEMENTATION OF THE ANNUAL PROGRAMME

      1. MEMBER STATE:

      2. FUND:

      3. RESPONSIBLE AUTHORITY:

      4. YEAR COVERED:

      5. A. Technical report

        1. 1. OPERATIONAL IMPLEMENTATION

          1. 1.1. Timetable for the implementation of the programme

          2. 1.2. Description of the organisation of the selection of projects and...

          3. 1.3. Progress made in implementing the actions of the programme under...

            1. 1.3.1. Actions implementing Priority 1

            2. 1.3.2. Actions implementing Priority 2

            3. 1.3.3. Etc.

          4. 1.4. Use of technical assistance

          5. 1.5. Problems encountered and measures taken

        2. 2. FINANCIAL IMPLEMENTATION

        3. 3. REPORTING ON IRREGULARITIES

      6. B. Request for the second pre-financing payment

    5. ANNEX 5

      MODEL FINAL REPORT ON IMPLEMENTATION OF THE ANNUAL PROGRAMME

      1. MEMBER STATE:

      2. FUND:

      3. RESPONSIBLE AUTHORITY:

      4. YEAR COVERED:

      5. A. Technical report

        1. 1. OPERATIONAL IMPLEMENTATION

          1. 1.1. Timetable on the implementation of the programme

          2. 1.2. Update from the progress report on the description of the...

          3. 1.3. The achievements in implementing the actions of the programme under...

            1. 1.3.1. Actions implementing priority 1

            2. 1.3.2. Actions implementing priority 2

            3. 1.3.3. Etc.

          4. 1.4. The results of the technical assistance

          5. 1.5. Problems encountered and measures taken on the implementation of the...

          6. 1.6. Procedures applied when the responsible authority implemented project(s) directly acting...

          7. 1.7. Coherence and complementarity with other instruments

        2. 2. ASSESSMENT OF THE PROGRESS MADE IN IMPLEMENTING THE MULTIANNUAL PROGRAMME...

        3. 3. MEASURES TAKEN TO PROVIDE INFORMATION ON THE PROGRAMME

          1. 3.1. Measures taken to make the multiannual and annual programme public...

          2. 3.2. Implementation of the visibility principle

        4. 4. FINANCIAL IMPLEMENTATION

          1. 4.1. List of all pending recoveries at 30 June of the...

          2. 4.2. List of recovery orders not included in the financial reports...

        5. 5. REPORTING ON IRREGULARITIES

        6. 6. ANNEXES

      6. B. Request for payment of the balance/ Statement of reimbursement

    6. ANNEX 6

      1. MODEL AUDIT STRATEGY

        1. 1. THE AUDIT UNIVERSE

          1. 1.1. Scope of the strategy (Funds covered)

          2. 1.2. Period covered by the strategy

          3. 1.3. Audit standards applied

        2. 2. RISK ASSESSMENT

          1. 2.1. Risk identification and assessment

          2. 2.2. Risk response and residual risk

        3. 3. OBJECTIVES AND PRIORITIES

          1. 3.1. Objectives of the audits

          2. 3.2. Priorities for the audits

        4. 4. AUDIT APPROACH

          1. 4.1. System audits

            1. 4.1.1. The responsible body(ies) for the audit work

            2. 4.1.2. The authorities to be audited

            3. 4.1.3. Horizontal issues to be covered by the system audits

            4. 4.1.4. Indicative multiannual plan for system audits (if possible)

          2. 4.2. Audits of projects

            1. 4.2.1. The responsible body(ies) for the audit work

            2. 4.2.2. Description of the sampling methodology

        5. 5. AUDIT PLANS COVERING CALENDAR YEARS 2007 AND 2008

          1. 5.1. Year 2007

          2. 5.2. Year 2008

      2. Annex(es) to the audit strategy: annual plans

        1. 1. CHANGES TO THE AUDIT STRATEGY, WHERE APPLICABLE

        2. 2. MAIN RESULTS OF AUDITS OF THE PREVIOUS YEAR

        3. 3. AUDIT PLAN YEAR 20XX

    7. ANNEX 7

      MODEL REPORT BY THE AUDIT AUTHORITY

      1. MEMBER STATE:

      2. FUND:

      3. RESPONSIBLE AUTHORITY:

      4. ANNUAL PROGRAMME COVERED BY THE REPORT: …

      5. A. Annual audit report

        1. 1. GENERAL INFORMATION

          1. 1.1. The bodies that have been involved in preparing the report...

          2. 1.2. Identification and justification of major changes in the implementation of...

          3. 1.3. Summary table of the results of the audits

        2. 2. SYSTEMS AUDITS

          1. 2.1. The bodies that carried out audits

          2. 2.2. A summary list of the audits carried out

          3. 2.3. The principal findings, recommendations and the conclusions drawn from the...

          4. 2.4. Financial impact of the audit findings

          5. 2.5. Additional work, where appropriate

          6. 2.6. Indication whether any problems identified were considered to be systemic...

          7. 2.7. Information on the follow-up of the audit recommendations

        3. 3. AUDITS ON PROJECTS

          1. 3.1. The bodies that carried out the audits

          2. 3.2. A summary list of audits carried out and the percentage...

          3. 3.3. The principal findings, recommendations and conclusions of the audits with...

          4. 3.4. The conclusions drawn from the results of the audits with...

          5. 3.5. Financial impact of the audit findings

          6. 3.6. Additional work, where appropriate

          7. 3.7. Information on the follow-up of audit recommendations

          8. 3.8. Indication whether any problems identified were considered to be systemic...

        4. 4. FOLLOW-UP OF AUDIT ACTIVITY COVERED BY PREVIOUS REPORTS, IF APPROPRIATE...

          1. 4.1. Information on the follow-up to previous system audit recommendations

          2. 4.2. Information on results of audits of actions of a systemic...

      6. B. Opinion on the functioning of the management and control systems...

        1. 1. INTRODUCTION

        2. 2. SCOPE OF THE EXAMINATION

        3. 3. OPINION

          1. Either (unqualified opinion)

          2. Or (qualified opinion)

          3. Or (adverse opinion)

      7. C. Validation of the payment request

        1. 1. INTRODUCTION

        2. 2. SCOPE OF THE EXAMINATION

        3. 3. OPINION

          1. Either (unqualified opinion)

          2. Or (qualified opinion)

          3. Or (adverse opinion)

    8. ANNEX 8

      MODEL DECLARATION OF EXPENDITURE FOR THE SECOND PRE-FINANCING

      1. MEMBER STATE:

      2. FUND:

      3. CERTIFYING AUTHORITY:

      4. ANNUAL PROGRAMME COVERED BY THE CERTIFICATION:

      5. I, the undersigned, [name of the person in charge]

      6. representing the certifying authority designated for the [name of the...

      7. hereby certify that all expenditure included in the progress report...

      8. I also certify that actions are progressing in pursuance with...

      9. the declaration of expenditure is accurate, results from reliable accounting...

      10. This declaration of expenditure is based on accounts provisionally closed...

      11. In accordance with Article 43 of the basic act, the...

      12. Date

      13. Name in capital letters, stamp, position and signature of certifying...

    9. ANNEX 9

      MODEL DECLARATION OF EXPENDITURE FOR PAYMENT OF THE BALANCE

      1. MEMBER STATE:

      2. FUND:

      3. CERTIFYING AUTHORITY:

      4. ANNUAL PROGRAMME COVERED BY THE CERTIFICATION:

      5. I, the undersigned, [name of the person in charge]

      6. representing the certifying authority designated for the [name of the...

      7. hereby certify that all expenditure included in the final report...

      8. I also certify that actions are progressing in pursuance with...

      9. the declaration of expenditure is accurate, results from reliable accounting...

      10. This declaration of expenditure is based on accounts closed on...

      11. In accordance with Article 43 of the basic act, the...

      12. Date

      13. Name in capital letters, stamp, position and signature of certifying...

    10. ANNEX 10

      INSTRUCTIONS CONCERNING THE EMBLEM AND DEFINITION OF THE STANDARD COLOURS

      1. Symbolic description

      2. Heraldic description

      3. Geometric description

      4. Regulation colours

        1. Four-colour process

        2. Internet

        3. Monochrome reproduction process

        4. Reproduction on a coloured background

    11. ANNEX 11

      1. RULES ON THE ELIGIBILITY OF EXPENDITURE EUROPEAN REFUGEE FUND

        1. I. General principles

          1. I.1. BASIC PRINCIPLES

            1. 1. In accordance with the basic act, for it to be...

            2. 2. In the case of multiannual actions within the meaning of...

            3. 3. Projects supported by the Fund shall not be financed by...

          2. I.2. BUDGET OF A PROJECT

          3. I.3. INCOME AND NON-PROFIT PRINCIPLE

            1. 1. Projects supported by the Fund must be of a non-profit-making...

            2. 2. Project income shall come from all financial contributions granted to...

            3. 3. The Community contribution resulting from the application of the principle...

          4. I.4. ELIGIBILITY PERIOD

            1. 1. Costs relating to a project must be incurred and the...

            2. 2. An exception to the abovementioned eligibility period is made for...

          5. I.5. RECORD OF EXPENDITURE

            1. 1. Expenditure shall correspond to payments made by the final beneficiary....

            2. 2. As a rule, expenditure shall be justified by official invoices....

            3. 3. Expenditure must be identifiable and verifiable. In particular:

            4. 4. Where applicable, the final beneficiaries are obliged to keep certified...

            5. 5. The storage and processing of such records must comply with...

          6. I.6. TERRITORIAL SCOPE

            1. 1. Expenditure for actions described in Articles 3 and 5 of...

            2. 2. Partners in the project registered and established in third countries...

        2. II. Categories of eligible costs (at project level)

          1. II.1. DIRECT ELIGIBLE COSTS

            1. II.1.1. Staff costs

              1. II.1.1.1. General rules

                1. 1. Direct costs for staff are eligible only for persons that...

                2. 2. Staff costs shall be detailed in the forward budget, indicating...

                3. 3. The cost of staff assigned to the project, i.e. salaries...

              2. II.1.1.2. Specific conditions for staff costs of public bodies

            2. II.1.2. Travel and subsistence costs

              1. 1. Travel and subsistence costs are only eligible as direct costs...

              2. 2. Travel costs shall be eligible on the basis of the...

              3. 3. Subsistence costs shall be eligible on the basis of real...

            3. II.1.3. Equipment

              1. II.1.3.1. General rules

                1. 1. Costs pertaining to the acquisition of equipment (based on depreciation...

                2. 2. Costs for day-to-day administrative equipment (such as printer, laptop, fax,...

                3. 3. The choice between leasing, rental or purchase must always be...

              2. II.1.3.2. Renting and leasing

              3. II.1.3.3. Purchasing

                1. 1. Where equipment is purchased before or during the lifetime of...

                2. 2. Equipment that was purchased before the lifetime of the project,...

                3. 3. Purchase costs of equipment shall correspond to normal market costs...

                4. 4. For individual items costing below EUR 1 000, the full...

            4. II.1.4. Real estate

              1. II.1.4.1. General rules

              2. II.1.4.2. Purchase, construction or renovation

                1. 1. Where the acquisition of real estate is essential for implementation...

                2. 2. In the case of renovation, only conditions (c) and (d)...

              3. II.1.4.3. Rental

              4. II.1.4.4. Office space for the final beneficiary

            5. II.1.5. Consumables, supplies and general services

              1. 1. The costs of consumables, supplies and general services are eligible...

              2. 2. However, office supplies as well as all kinds of small...

            6. II.1.6. Subcontracting

              1. 1. As a general rule, final beneficiaries must have the capacity...

              2. 2. Expenditure relating to the following subcontracts is ineligible for co...

              3. 3. For all subcontracts, subcontractors shall undertake to provide all audit...

            7. II.1.7. Costs deriving directly from the requirements linked to EU co-financing...

            8. II.1.8. Expert fees

            9. II.1.9. Specific expenses in relation to the target groups

            10. II.1.10. Emergency measures

              1. 1. For duly justified reasons, derogations to the eligibility rules defined...

              2. 2. In accordance with Article 21(3) of the basic act, the...

          2. II.2. INDIRECT ELIGIBLE COSTS

            1. 1. Indirect costs relate to categories of expenditure that are not...

            2. 2. The percentage allocated to indirect costs shall cover the following...

        3. III. Ineligible expenditure

        4. IV. Costs covered by assigned income

          1. 1. In duly substantiated cases, co-financing of the project as regards...

          2. 2. Such contributions shall not exceed 50 % of the total contribution...

        5. V. Technical assistance at the initiative of Member States

          1. 1. At the initiative of each Member State, the following technical...

          2. 2. Technical assistance may finance expenses incurred by any of the...

          3. 3. Activities linked to technical assistance must be performed and the...

          4. 4. Any procurement must be carried out in accordance with national...

          5. 5. Member States may implement technical assistance measures for this Fund...

    12. ANNEX 12

      APPLICATION FOR EMERGENCY MEASURES

      1. MEMBER STATE:

      2. RESPONSIBLE AUTHORITY:

      3. YEAR OF APPLICATION:

      4. ANNUAL PROGRAMME TO BE AMENDED:

      5. 1. Description of the situation of particular pressure requiring emergency measures...

        1. 1.1. An indication of the exceptional character of the situation

        2. 1.2. The number and nature of arrivals

        3. 1.3. The effects of these arrivals on reception capacities, the asylum...

        4. 1.4. The urgent needs

        5. 1.5. The short-term objectives

      6. 2. Emergency measures envisaged

        1. 2.1. Measure 1

        2. 2.2. Measure 2

        3. 2.3. Etc.

      7. 3. Eligibility rules

        1. 3.1. Start date and end date of all the measures

        2. 3.2. Derogations to the eligibility rules on expenditure, referred to in...

      8. 4. Indicative financing plan

Back to top

Options/Help

Print Options

You have chosen to open the Whole Decision

The Whole Decision you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources