1.—(1) The title of these Regulations is the Building (Amendment) (Wales) Regulations 2022.
(2) These Regulations apply in relation to Wales.
(3) These Regulations come into force on 23 November 2022.
(4) In these Regulations—
“the Approved Inspectors Regulations” (“y Rheoliadau Arolygwyr Cymeradwy”) means the Building (Approved Inspectors etc.) Regulations 2010(1);
“the Building Regulations” (“y Rheoliadau Adeiladu”) means the Building Regulations 2010(2).
2. The Building Regulations are amended in accordance with regulations 3 to 17.
3. In regulation 2(1) (interpretation)—
(a)in the definition of “energy efficiency requirements”—
(i)after “26B” insert “, 26C”;
(ii)for “and 40” substitute “40 and 40A, ”;
(b)after the definition of “softened wholesome water” insert—
“;
“system for on-site electricity generation” means a system that produces electricity and has a direct electrical connection to the building in question.”
4. In regulation 4 (requirements relating to building work), after paragraph (3) insert—
“(4) This paragraph applies in relation to a building where—
(a)building work is undertaken in respect of that building (“relevant work”), and
(b)Part L of Schedule 1 imposes a requirement in respect of the relevant work.
(5) Notwithstanding paragraph (3), upon completion of the relevant work, any building to which paragraph (4) applies must—
(a)comply with Part F of Schedule 1, or
(b)where the building did not comply with Part F of Schedule 1 before the relevant work was begun, be no more unsatisfactory in relation to it than before the work was begun.”
5. In regulation 17(2A) (completion certificates)—
(a)in sub-paragraph (c), omit “consumption”;
(b)after sub-paragraph (ca) insert—
“(cb)regulation 26C (target primary energy rates for new buildings),”.
6. In regulation 25C (new buildings: minimum energy performance requirements)—
(a)in paragraph (a)—
(i)omit “(other than new dwellings),”;
(ii)omit “consumption”;
(b)in paragraph (b), for “new dwellings” substitute “when a dwelling is erected”.
7. After regulation 25C (new buildings: minimum energy performance requirements) insert—
25D. Energy efficiency ratings must be approved by the Welsh Ministers, applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24 for new buildings.”
8. In regulation 26A (primary energy consumption rates for new buildings)—
(a)in the heading, omit “consumption”;
(b)omit “(other than a dwelling)”;
(c)omit “consumption”.
9. After regulation 26B (fabric performance values for new dwellings) insert—
26C. Where a dwelling is erected, it must equal or exceed the energy efficiency rating for the dwelling which has been approved pursuant to regulation 25D applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24 for new buildings.”
10. In regulation 27A (primary energy consumption rate calculations)—
(a)in the heading, omit “consumption”;
(b)in paragraph (1), omit “(other than a dwelling)”;
(c)in paragraphs (2)(a) and (b), (3)(a)(i) and (ii) and (5), omit “consumption”.
11. After regulation 27B (fabric performance values calculations) insert—
27C.—(1) This regulation applies where a dwelling is erected and regulation 26C applies.
(2) Not later than the day before the work starts, the person carrying out the work must give the local authority a notice which specifies—
(a)the energy efficiency rating for the dwelling as designed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
(b)a list of specifications to which the dwelling is to be constructed.
(3) Not later than five days after the work has been completed, the person carrying out the work must give the local authority—
(a)a notice which specifies—
(i)the target energy efficiency rating for the building, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
(ii)the energy efficiency rating of the building as constructed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
(iii)whether the building has been constructed in accordance with the list of specifications referred to in paragraph (2)(b), and if not, a list of any changes to those specifications, or
(b)a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraph (a).
(4) A local authority is authorised to accept as evidence that the requirements of regulation 26C have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.”
12. After regulation 40 (information about use of fuel and power) insert—
40A.—(1) This regulation applies to building work in respect of a building in relation to which paragraph L2 of Schedule 1 applies.
(2) The person carrying out the work must, not later than five days after the work has been completed, provide to the owner sufficient information about the system for on-site electricity generation in respect of its operation and maintenance requirements so that the system may be operated and maintained in such a manner as to produce the maximum electricity that is reasonable in the circumstances and delivers this electricity to the optimal place for use.
40B.—(1) This regulation applies to building work in respect of a building where Part O of Schedule 1 imposes a requirement in relation to building work.
(2) The person carrying out the work must, not later than five days after the work has been completed, give sufficient information to the owner about the provision made in accordance with Part O so that the systems in place further to Part O can be operated in such a manner as to protect against overheating.”
13. In regulation 42 (mechanical ventilation air flow rate testing)—
(a)for paragraph (1) substitute—
“(1) This regulation applies where paragraph F1(1) of Schedule 1 imposes a requirement in relation to—
(a)the creation of a new dwelling by building work; or
(b)an existing dwelling which undergoes building work for the provision or extension of any fixed building system for mechanical ventilation.
(1A) Paragraph (1)(b) excludes building work to which Schedule 4 applies.”;
(b)in paragraph (2)(b), for “.” substitute “, other than when Schedules 3 or 4 apply.”
14. In regulation 43(4) (pressure testing), for “the Independent Airtightness Testing Scheme Limited” substitute “Elmhurst Energy Systems Limited”.
15. After regulation 44 (commissioning) insert—
44ZA.—(1) This regulation applies to building work in respect of a building in relation to which paragraph L2 of Schedule 1 imposes a requirement, but does not apply to the provision or extension of any system for on-site electricity generation where testing and adjustment is not possible.
(2) Where this regulation applies the person carrying out the work must, for the purpose of ensuring compliance with paragraph L2 of Schedule 1, give to the local authority a notice confirming that the system for on-site electricity generation has been commissioned.
(3) The notice must be given to the local authority—
(a)not later than the date on which the notice required by regulation 16(4) is required to be given; or
(b)where that regulation does not apply, not more than 30 days after completion of the work.”
16. In Schedule 1 (requirements)—
(a)in Part L, after entry L1 insert—
"On-site generation of electricity | |
L2. Where a system for on-site electricity generation is installed— (a) reasonable provision must be made to ensure that— (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances." | Requirement L2 applies only to dwellings. |
(b)after Part N of Schedule 1 insert—
"PART O OVERHEATING | |
Overheating Mitigation | |
O1.—(1) Reasonable provision must be made to— (a) limit unwanted solar gains in summer; (b) provide an adequate means to remove heat from the indoor environment. (2) In meeting the obligations in sub-paragraph (1)— (a)account must be taken of the safety of any occupant, and their reasonable enjoyment of the building; and (b)mechanical cooling may only be used where insufficient heat is capable of being removed from the indoor environment without it." | Requirement O1 applies only to the erection of the following buildings— (a) a dwelling; (b) an institution; or (c) any other building containing one or more rooms for residential purposes (other than a room in a hotel). |
17.—(1) Schedule 3 (self-certification schemes and exemptions from requirement to give building notice or deposit full plans) is amended as follows.
(2) In the table, in column 2 (person carrying out work)—
(a)in each of rows 7, 8 and 9, omit “, Building Engineering Services Competence Assessment Limited”;
(b)in each of rows 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 17, 18, 19 and 20, omit “or Stroma Certification Limited”;
(c)in row 2, after “NAPIT Registration Limited”, for “,” substitute “or”;
(d)in row 3, after “NAPIT Registration Limited”, for “,” substitute “or”;
(e)in row 4, after “NAPIT Registration Limited”, for “,” substitute “or”;
(f)in row 5, after “Certsure LLP”, for “,” substitute “or”;
(g)in row 6, after “Certsure LLP”, for “,” substitute “or”;
(h)in row 7, after “Certsure LLP”, for “,” substitute “or”;
(i)in row 8, after “NAPIT Registration Limited”, for “,” substitute “or”;
(j)in row 9, after “Certsure LLP”, for “,” substitute “or”;
(k)in row 10, after “Fenestration Self-Assessment Scheme”, for “,” substitute “or”;
(l)in row 11, after “Fenestration Self-Assessment Scheme”, for “,” substitute “or”;
(m)in row 12, after “HETAS Limited”, for “,” substitute “or”;
(n)in row 13, after “HETAS Limited”, for “,” substitute “or”;
(o)in row 14, after “HETAS Limited”, for “,” substitute “or”;
(p)in row 15, after “NAPIT Registration Limited”, for “,” substitute “or”;
(q)in row 17—
(i)for “Cavity Insulation Guarantee Agency” substitute “Insulation Assurance Authority Limited”;
(ii)after “Certsure LLP”, for “,” substitute “or”;
(r)in row 18, after “Certsure LLP”, for “,” substitute “or”;
(s)in row 19, after “Certsure LLP”, for “,” substitute “or”;
(t)in row 20, after “Certsure LLP”, for “,” substitute “or”.
18. The Approved Inspectors Regulations are amended in accordance with regulations 19 and 20.
19. In regulation 8(1) (functions of approved inspectors)—
(a)in sub-paragraph (a)—
(i)after “26B (fabric performance values for new dwellings),” insert “26C (target primary energy rates for new buildings),”;
(ii)for “and” before “40” substitute “,”;
(iii)after “40 (information about use of fuel and power)” insert “, 40A (information about systems for on-site generation of electricity) and 40B (information about overheating)”;
(b)in sub-paragraph (b)—
(i)after “27B,” insert “27C,”;
(ii)for “and 44” substitute “, 44 and 44ZA”.
20. In regulation 20 (application of certain regulations of the Building Regulations)—
(a)in the heading—
(i)after “27B,” insert “27C,”;
(ii)for “and 44” substitute “, 44 and 44ZA”;
(b)in paragraph (1)—
(i)after “27B (fabric performance values calculations),” insert “27C (target primary energy rate calculations for new buildings),”;
(ii)for “and 44” substitute “, 44”;
(iii)after “(commissioning)” insert “and 44ZA (commissioning in respect of a system for on-site electricity generation)”;
(c)after paragraph (2B) insert—
“(2C) Regulation 27C(3) of the Principal Regulations applies in relation to building work which is the subject of an initial notice as if after “work has been completed,” there were inserted “or, if earlier, the date on which in accordance with regulation 17 of the Building (Approved Inspectors etc.) Regulations 2010 the initial notice ceases to be in force”.”;
(d)after paragraph (6) insert—
“(6A) Regulation 44ZA of the Principal Regulations applies in relation to building work which is the subject of an initial notice as if for paragraph (3) there were substituted—
“(3) The notice must be given to the approved inspector—
(a)subject to sub-paragraphs (b) and (c), not later than five days after completion of the work to which the initial notice relates;
(b)where regulation 17 of the Building (Approved Inspectors etc.) Regulations 2010 applies, not later than the date on which the initial notice ceases to be in force or, if earlier, the end of the period referred to in sub-paragraph (a);
(c)where regulation 20 applies by virtue of regulation 20 of the Building (Approved Inspectors etc.) Regulations 2010, not later than the date on which the notice or certificate required by that regulation must be given.””
21.—(1) The amendments made by Parts 2 and 3 of these Regulations do not apply in a case where—
(a)building work on a particular building has been commenced prior to the day these Regulations come into force in accordance with any relevant notification provision, or
(b)a relevant notification provision has been complied with in relation to proposed building work on an individual building and the building work has commenced within 12 months beginning with the day these Regulations come into force.
(2) In this regulation, “relevant notification provision” means regulation 12(2) of the Building Regulations and sections 47(1), 50, 51A(2) and 54 of the Building Act 1984.
Lee Waters
Deputy Minister for Climate Change under authority of the Minister for Climate Change, one of the Welsh Ministers
20 May 2022
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area. The revised version is currently only available in English.
Original (As Enacted or Made) - English: The original English language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Original (As Enacted or Made) - Welsh:The original Welsh language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: