SCHEDULE 14DESIGN PARAMETERS

PART 1DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 1

(1)

Component / Building / Area

(2)

Work No.

(3)

Maximum number

(4)

Maximum length (m)

(5)

Maximum width (m)

(6)

Maximum height (m AGL)

(7)

Maximum height (m AOD)

(1)

Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL.

(2)

Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be doubled stacked.

(3)

The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack.

Gas / Gas Heat Exchanger(1)1D(v)(aa)225254551.1
Quench Column1D(i)(aa)150304046.1
Absorber Column1D(i)(bb)1503095101.1
Regenerator1D(iii)(aa)215157076.1
Carbon Dioxide Gas Compressor Building1E(i)445403036.1
Carbon Dioxide Main Vent Stacks1E(iii)110103036.1
Main Process & Service Rack(2)(3)1D(iii)1150202531.1

PART 2DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2

(1)

Component / Building / Area

(2)

Work No.

(3)

Maximum number

(4)

Maximum length (m)

(5)

Maximum width (m)

(6)

Maximum height (m AGL)

(7)

Maximum height (m AOD)

(1)

Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL.

(2)

Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.

(3)

The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack.

Gas / Gas Heat Exchanger(1)1D(vi)(aa)225254551.1
Quench Column1D(ii)(aa)150304046.1
Absorber Column1D(ii)(bb)1503095101.1
Regenerator1D(iv)(aa)215157076.1
Carbon Dioxide Gas Compressor Building1E(ii)445403036.1
Carbon Dioxide Main Vent Stacks1E(iv)110103036.1
Main Process & Service Rack(2)(3)1D(iv)1150202531.1

PART 3DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2

(1)

Component / Building / Area

(2)

Work No.

(3)

Maximum number

(4)

Maximum length (m)

(5)

Maximum width (m)

(6)

Maximum height (m AGL)

(7)

Maximum height (m AOD)

(1)

Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.

Carbon Capture Wastewater Treatment Plant Area1D(viii)(a)180704046.1
Solvent Storage and Make-up System Compound1D(vii)455452531.1
Combined Power Turbine Building(1)1C(iii)(bb)250453541.1
Pressure Reducing De-Superheating Station Building (1)1C(iii)(dd)215451521.1
Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure)1C(iii)(ee)130106571.1
Steam Pipe Bridge1C(iii)(ee)1300202531.1
Fire Water Tanks1D(viii)(dd)415151521.1
Switchroom Building(1)1F3030162026.1
Carbon Dioxide Pipe Bridge21500202026.1
Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator)211001001218.1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources