The Medworth Energy from Waste Combined Heat and Power Facility Order 2024

Status:

This is the original version (as it was originally made).

Article 3

SCHEDULE 14MAXIMUM AND MINIMUM DESIGN PARAMETERS

Table 11

(1)

Element of authorised development

(2)

Work No.

(3)

Maximum length (metres)

(4)

Maximum width (metres)

(5)

Maximum height (metres) (above finished floor level of 3.0m AOD)

(6)

Minimum height (metres) (above finished floor level of 3.0m AOD)

Gatehouse / weighbridge2A9.52.43
Tipping hall158.53818.5
Fire water tank2A1610
Fire water pump building2A12.59.55.5
Waste bunker building11023738.5
Tipping bunker1-14
Main waste bunker1-14
Boiler house building15547.652
Loading area (a)112.212.212
APCr silos133.312.237
Loading area (b)112.212.212
Air pollution control building133.228.637
Induced draft fans building1101012
Chimneys1A3.29084
CEMS platform1A18
Switchgear building north135.21035
Switchgear building south112.41018
IBA enclosure east1141112
IBA enclosure west111612
Diesel tanks and urea tanks building125.99.135
Compressed air station113810
Main transformer2A11612
Emergency diesel generator113.55.512
Air cooled condenser1373730
Turbine hall1473427
Water treatment plant1302218
Workshop and stores2A341518
Administration building1B341215
132kV switching compound2A23136.5
Private wire transformer2A11512
Private wire switchgear compound2A7612
Water re–cooling system118.57.527
Steam and condensate pipelines323

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources