Article 3
(1) Element of authorised development | (2) Work No. | (3) Maximum length (metres) | (4) Maximum width (metres) | (5) Maximum height (metres) (above finished floor level of 3.0m AOD) | (6) Minimum height (metres) (above finished floor level of 3.0m AOD) |
---|---|---|---|---|---|
Gatehouse / weighbridge | 2A | 9.5 | 2.4 | 3 | |
Tipping hall | 1 | 58.5 | 38 | 18.5 | |
Fire water tank | 2A | 16 | 10 | ||
Fire water pump building | 2A | 12.5 | 9.5 | 5.5 | |
Waste bunker building | 1 | 102 | 37 | 38.5 | |
Tipping bunker | 1 | – | – | -14 | |
Main waste bunker | 1 | – | – | -14 | |
Boiler house building | 1 | 55 | 47.6 | 52 | |
Loading area (a) | 1 | 12.2 | 12.2 | 12 | |
APCr silos | 1 | 33.3 | 12.2 | 37 | |
Loading area (b) | 1 | 12.2 | 12.2 | 12 | |
Air pollution control building | 1 | 33.2 | 28.6 | 37 | |
Induced draft fans building | 1 | 10 | 10 | 12 | |
Chimneys | 1A | – | 3.2 | 90 | 84 |
CEMS platform | 1A | – | – | 18 | |
Switchgear building north | 1 | 35.2 | 10 | 35 | |
Switchgear building south | 1 | 12.4 | 10 | 18 | |
IBA enclosure east | 1 | 14 | 11 | 12 | |
IBA enclosure west | 1 | 11 | 6 | 12 | |
Diesel tanks and urea tanks building | 1 | 25.9 | 9.1 | 35 | |
Compressed air station | 1 | 13 | 8 | 10 | |
Main transformer | 2A | 11 | 6 | 12 | |
Emergency diesel generator | 1 | 13.5 | 5.5 | 12 | |
Air cooled condenser | 1 | 37 | 37 | 30 | |
Turbine hall | 1 | 47 | 34 | 27 | |
Water treatment plant | 1 | 30 | 22 | 18 | |
Workshop and stores | 2A | 34 | 15 | 18 | |
Administration building | 1B | 34 | 12 | 15 | |
132kV switching compound | 2A | 23 | 13 | 6.5 | |
Private wire transformer | 2A | 11 | 5 | 12 | |
Private wire switchgear compound | 2A | 7 | 6 | 12 | |
Water re–cooling system | 1 | 18.5 | 7.5 | 27 | |
Steam and condensate pipelines | 3 | – | – | 23 |
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: