The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (Schedules only)

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 150

F1SCHEDULE 1U.K.The Electricity Regulation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Regulation 151

SCHEDULE 2U.K.The Gas Regulation

1.  For Article 1 of the Gas Regulation (subject-matter and scope) substitute—U.K.

Article 1U.K.Subject matter and scope

1.  This Regulation aims at—

(a)setting non-discriminatory rules for access conditions to natural gas transmission systems with a view to ensuring the proper functioning of the market in gas;

(b)setting non-discriminatory rules for access conditions to LNG facilities and storage facilities;

(c)facilitating the emergence of a well-functioning and transparent wholesale market with a high level of security of supply in gas.

2.  The objectives referred to in paragraph 1 include the setting of principles for tariffs, or the methodologies underlying their calculation, for access to the network, but not to storage facilities, the establishment of third-party access services and principles for capacity allocation and congestion-management, the determination of transparency requirements, balancing rules and imbalance charges, and the facilitation of capacity trading.

3.  In so far as this Regulation applies to storage facilities, it applies only to—

(a)storage facilities within the jurisdiction of Great Britain to which section 19B of the Gas Act 1986 M1 applies; and

(b)storage facilities in Northern Ireland, other than those to which an exemption has been granted in accordance with Article 39A of the Gas (Northern Ireland) Order 1996 M2,

except for Article 19(4) which applies to all storage facilities..

Commencement Information

I1Sch. 2 para. 1 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Marginal Citations

M11986 c. 44. Section 19B was inserted by S.I. 2000/1937 and amended by S.I. 2004/2043 and 2011/2704.

M2S.I. 1996/275 (N.I. 2). Article 39A was inserted by S.R. 2013 No. 92.

2.  For Article 2 (definitions) substitute—U.K.

Article 2U.K.Definitions

In this Regulation—

ancillary services” means all services necessary for access to and the operation of transmission networks, distribution networks, LNG facilities or storage facilities, including load balancing, blending and injection of inert gases, but not including facilities reserved exclusively for transmission system operators carrying out their functions;

available capacity” means the part of the technical capacity of a transmission system that is not allocated and is still available to the system;

balancing period” means the period within which the off-take of an amount of natural gas, expressed in units of energy, must be offset by every network user by means of the injection of the same amount of natural gas into the transmission network in accordance with a transport contract or network code;

capacity” means transmission system capacity, LNG facility capacity or storage facility capacity;

congestion management” means management of the capacity portfolio of a transmission system operator with a view to optimal and maximum use of the technical capacity and the timely detection of future congestion and saturation points;

connected country or territory” means the other part of the United Kingdom, a connected member State or a connected third country;

“connected member State”—

(a)

in relation to Great Britain, means a member State, the transmission system of which is connected to the Great Britain transmission system by an interconnector;

(b)

in relation to Northern Ireland, means a member State, the transmission system of which is connected to the Northern Ireland transmission system by an interconnector;

“connected third country”—

(a)

in relation to Great Britain, means a country or territory other than Northern Ireland or a member State, the transmission system of which is directly connected to the Great Britain transmission system;

(b)

in relation to Northern Ireland, means a country or territory other than Great Britain or a member State, the transmission system of which is directly connected to the Northern Ireland transmission system;

contracted capacity” means capacity that a system operator has allocated to a network user by means of a contract;

contractual congestion” means a situation where the level of firm capacity demand exceeds the technical capacity of a system;

customer” means a wholesale or final customer of natural gas or a natural gas undertaking which purchases natural gas;

deliverability” means the rate at which a storage facility user is entitled to withdraw gas from the storage facility;

distribution” means the transport of natural gas through local or regional pipeline networks with a view to its delivery to customers, but not including supply;

distribution system operator” means a person who carries out the function of distribution and is responsible for operating, ensuring the maintenance of, and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of gas;

final customer” means a customer purchasing natural gas for the customer's own use;

firm capacity” means capacity contractually guaranteed as uninterruptible by a system operator;

firm services” means services offered by a system operator in relation to firm capacity;

injectability” means the rate at which a storage facility user is entitled to inject gas into the storage facility;

interconnection point” has the meaning given in Article 3 of Commission Regulation (EU) 2017/459 establishing a network code on capacity allocation mechanisms in gas transmission systems;

“interconnector”—

(a)

in relation to Great Britain, means a transmission line which crosses or spans a border between Great Britain and a member State, or between Great Britain and Northern Ireland, for the sole or main purpose of connecting the transmission systems of those countries or territories;

(b)

in relation to Northern Ireland, means a transmission line which crosses or spans a border between Northern Ireland and a member State, or between Northern Ireland and Great Britain, for the sole or main purpose of connecting the transmission systems of those countries or territories;

interruptible capacity” means capacity that may be interrupted by a system operator in accordance with the conditions stipulated in a contract;

interruptible services” means services offered by a system operator in relation to interruptible capacity;

the jurisdiction of Great Britain” has the meaning given in section 5(9) of the Gas Act 1986;

linepack” means the storage of gas by compression in gas transmission and distribution systems, but not including facilities reserved for transmission system operators carrying out their functions;

LNG facility” means a terminal which is used for the liquefaction of natural gas or the importation, offloading and re-gasification of LNG, and includes ancillary services and temporary storage necessary for the re-gasification process and subsequent delivery to the transmission system, but does not include any part of LNG terminals used for storage;

LNG facility capacity” means capacity at an LNG facility for the liquefaction of natural gas or the importation, offloading, ancillary services, temporary storage and re- gasification of LNG;

LNG system operator” means a person who carries out the function of liquefaction of natural gas, or the importation, offloading and re-gasification of LNG and who is responsible for operating an LNG facility;

long-term services” means services offered by a system operator with a duration of one year or more;

“the national regulatory authority”—

(a)

in relation to Great Britain, means the Gas and Electricity Markets Authority;

(b)

in relation to Northern Ireland, means the Northern Ireland Authority for Utility Regulation;

natural gas undertaking” means a person carrying out one or more of the functions of production, transmission, distribution, supply, purchase or storage of natural gas, including LNG, which is responsible for the commercial, technical or maintenance tasks (or any combination of those tasks) related to those functions, but does not include final customers;

network user” means a customer or a potential customer of a transmission system operator, and transmission system operators themselves in so far as it is necessary for them to carry out their functions in relation to transmission;

new infrastructure” means infrastructure not completed by 4th August 2003;

nomination” means the prior reporting by a network user to a transmission system operator of the actual flow that the network user wishes to inject into or withdraw from the system;

non-UK TSO” means a person, other than a person that falls within the definition of “transmission system operator”, who carries out the function of transmission and is responsible for operating, ensuring the maintenance of, and, if necessary developing the transmission system in a given area other than the United Kingdom, and, where applicable, its interconnections with other systems, and ensuring the long-term ability of the system to meet reasonable demands for the transport of gas;

Northern Ireland” has the meaning given in section 98 of the Northern Ireland Act 1998 M3;

“other part of the United Kingdom”—

(a)

in relation to Great Britain, means Northern Ireland;

(b)

in relation to Northern Ireland, means Great Britain;

physical congestion” means a situation where the level of demand for actual deliveries of gas exceeds the technical capacity of a system;

primary market” means the market of the capacity traded directly by a system operator;

re-nomination” means the subsequent reporting of a corrected nomination;

secondary market” means the market of the capacity traded otherwise than on the primary market;

short-term services” means services offered by a system operator with a duration of less than one year;

space” means the volume of gas which a user of a storage facility is entitled to use for the storage of gas;

storage capacity” means any combination of space, injectability and deliverability;

storage facility” means a facility used for the stocking of natural gas and owned or operated by a natural gas undertaking, including the part of LNG facilities used for storage but excluding the portion used for production operations, and excluding facilities reserved exclusively for transmission system operators in carrying out their functions;

storage system operator” means a person who carries out the function of storage and is responsible for operating a storage facility;

supply” means the sale, including resale, of natural gas, including LNG, to customers;

system” means any transmission networks, distribution networks, LNG facilities or storage facilities, or combination of such networks or facilities, owned or operated by a natural gas undertaking, including linepack and its facilities supplying ancillary services and those of related undertakings necessary for providing access to transmission, distribution and LNG;

system integrity” means any situation in respect of a transmission network including necessary transmission facilities in which the pressure and the quality of the natural gas remain within the minimum and maximum limits laid down by the transmission system operator, so that the transmission of natural gas is guaranteed from a technical standpoint;

system operator” means a transmission system operator, LNG system operator or storage system operator;

system user” means a person supplying to, or being supplied by, the system;

technical capacity” means the maximum firm capacity that a transmission system operator can offer to network users, taking account of system integrity and the operational requirements of the transmission network;

transmission” means the transport of natural gas through a network, which mainly contains high-pressure pipelines, other than an upstream pipeline network and other than the part of high-pressure pipelines primarily used in the context of local distribution of natural gas, with a view to its delivery to customers, but not including supply;

transmission system capacity” means the maximum flow, expressed in normal cubic metres per time unit or in energy unit per time unit, to which a network user is entitled in accordance with the provisions of a transport contract;

“transmission system operator”—

(a)

in relation to Great Britain, means a person who is designated as a gas transmission system operator under section 8J of the Gas Act 1986 M4;

(b)

in relation to Northern Ireland, means a person who is designated as a gas transmission system operator under Article 8H of the Gas (Northern Ireland) Order 1996 M5;

transport contract” means a contract which a transmission system operator has concluded with a network user with a view to carrying out transmission;

unused capacity” means firm capacity which a network user has acquired under a transport contract but which that user has not nominated by the deadline specified in the contract;

upstream pipeline network” means any pipeline or network of pipelines operated or constructed as part of an oil or gas production project, or used to convey natural gas from one or more such projects to a processing plant or terminal or final coastal landing terminal;

wholesale customer” means a person other than a transmission system operator or distribution system operator who purchases natural gas for the purpose of resale inside or outside the system where the person is established..

Commencement Information

I2Sch. 2 para. 2 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Marginal Citations

M41986 c. 44. Section 8J was inserted by S.I. 2011/2704.

M5S.I. 1996/275 (N.I. 2). Article 8H was inserted by S.R. 2011 No. 155.

3.  Omit Articles 3 to 5.U.K.

Commencement Information

I3Sch. 2 para. 3 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

4.  Omit Articles 8 to 12.U.K.

Commencement Information

I4Sch. 2 para. 4 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

5.—(1) Article 13 (tariffs for access to networks) is amended as follows.U.K.

(2) In paragraph 1—

(a)in the first subparagraph—

(i)for “the regulatory authorities”, in both places that it occurs, substitute “ the national regulatory authority ”;

(ii)omit the words from “pursuant to” (where they first appear) to “that Directive”;

(b)in the second subparagraph—

(i)for “Member States may decide that tariffs” substitute “ Tariffs ”;

(ii)before “regulatory” insert “ national ”;

(c)in the fourth subparagraph—

(i)in the second sentence, for “authorities” substitute “ authority ”;

(ii)in the third sentence, for the words from the beginning to “shall not be”, substitute “ The national regulatory authority must ensure that network charges are not ”.

(3) In paragraph 2, omit the second sentence.

Commencement Information

I5Sch. 2 para. 5 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

6.  In Article 14 (third-party access services concerning transmission system operators), in paragraph 1, in the second subparagraph—U.K.

(a)for “competent” substitute “ national regulatory ”; and

(b)omit the words from “in accordance with” to the end.

Commencement Information

I6Sch. 2 para. 6 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

7.—(1) Article 16 (principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators) is amended as follows.U.K.

(2) In paragraph 2, for point (c) substitute—

(c)be compatible with the network access systems of—

(i)the other part of the United Kingdom and connected member States; and

(ii)if the national regulatory authority so directs, connected third countries;.

(3) In paragraph 3, omit the second subparagraph.

(4) In paragraph 4, for “regulatory authorities” substitute “ national regulatory authority ”.

Commencement Information

I7Sch. 2 para. 7 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

8.—(1) Article 18 (transparency requirements concerning transmission system operators) is amended as follows.U.K.

(2) In paragraph 2, omit “or relevant national authorities”.

(3) In paragraph 4, for “competent authorities” substitute “ national regulatory authority ”.

Commencement Information

I8Sch. 2 para. 8 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

9.  In Article 19 (transparency requirements concerning storage facilities and LNG facilities), in paragraph 5, omit “or relevant regulatory authorities”.U.K.

Commencement Information

I9Sch. 2 para. 9 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

10.  In Article 20 (record keeping by system operators), for the words from “the national authorities” to “the Commission” substitute “ the national regulatory authority and the Competition and Markets Authority ”.U.K.

Commencement Information

I10Sch. 2 para. 10 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

11.  In Article 21 (balancing rules and imbalance charges), for paragraph 4 substitute—U.K.

4.  Transmission system operators must, in order to facilitate gas trade, endeavour to harmonise balancing regimes and streamline structures and levels of balancing charges with those of transmission systems—

(a)in the other part of the United Kingdom and connected member States; and

(b)if the national regulatory authority so directs, in connected third countries..

Commencement Information

I11Sch. 2 para. 11 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

12.  In Article 22 (trading of capacity rights), in the second paragraph, for “regulatory authorities” substitute “ national regulatory authority ”.U.K.

Commencement Information

I12Sch. 2 para. 12 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

13.—(1) Article 24 (regulatory authorities) is amended as follows.U.K.

(2) For the heading, substitute “ The national regulatory authority ”.

(3) In the first paragraph—

(a)for “their” substitute “ its ”;

(b)for “regulatory authorities” substitute “ national regulatory authority ”;

(c)omit “and the Guidelines adopted pursuant to Article 23”.

(4) Omit the second paragraph.

Commencement Information

I13Sch. 2 para. 13 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

14.  Omit Articles 25 to 27.U.K.

Commencement Information

I14Sch. 2 para. 14 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

15.  Omit Article 29.U.K.

Commencement Information

I15Sch. 2 para. 15 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

16.  For Article 30 (derogations and exemptions) substitute—U.K.

Article 30AU.K.Derogations and exemptions: Great Britain

This Regulation, except for Article 19(4), does not apply to any of the infrastructure referred to in paragraph (a), (b) or (c), for so long as the certification or exemption referred to in that paragraph is in force—

(a)an interconnector, the operator of which is certified by the national regulatory authority under section 8F of the Gas Act 1986 on one of the certification grounds in section 8G (7) or (8) of that Act M6;

(b)a storage facility which is exempt under section 19A of the Gas Act 1986 M7; or

(c)an LNG facility which is exempt under section 19C of the Gas Act 1986 M8.

Article 30BU.K.Derogations and exemptions: Northern Ireland

This Regulation, except for Article 19(4), does not apply to any of the infrastructure referred to in paragraph (a), (b), (c) or (d), for so long as the certification or exemption referred to in that paragraph is in force—

(a)an interconnector, the operator of which is certified by the national regulatory authority under Article 8E of the Gas (Northern Ireland) Order 1996 on the certification ground in Article 8F(6) of that Order M9;

(b)a transmission system in relation to which an exemption has been granted under Article 10B(1) of the Gas (Northern Ireland) Order 1996 M10;

(c)a storage facility in relation to which an exemption has been granted under Article 39A of the Gas (Northern Ireland) Order 1996 M11; or

(d)an LNG facility in relation to which an exemption has been granted under Article 39A of the Gas (Northern Ireland) Order 1996..

Commencement Information

I16Sch. 2 para. 16 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Marginal Citations

M6Sections 8F and 8G were inserted by S.I. 2011/2704.

M7Section 19A was inserted by S.I. 2000/1937 and amended by S.I. 2004/2043 and 2011/2704.

M8Section 19C was inserted by S.I. 2000/1937 and amended by S.I. 2004/2043 and 2011/2704.

M9Articles 8E and 8F were inserted by S.R. 2011 No. 155.

M10Article 10B was inserted by S.R. 2013 No. 92.

M11Article 39A was inserted by S.R. 2013 No. 92.

17.  For the text of Article 31 (repeal) substitute—U.K.

References made to Regulation (EC) No. 1775/2005 in retained direct EU legislation are to be construed as references to this Regulation and read in accordance with the correlation table in Annex II..

Commencement Information

I17Sch. 2 para. 17 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

18.  In the text after Article 32 omit “This Regulation shall be binding in its entirety and directly applicable in all Member States.”.U.K.

Commencement Information

I18Sch. 2 para. 18 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

19.—(1) Annex I (guidelines) is amended as follows.U.K.

(2) In point 1.5, omit the words from “no later than” to the end.

(3) In point 1.8, after the words “transmission system operators” (in the second place where it appears) insert “ , and endeavour to cooperate with non-UK TSOs in connected member States and connected third countries, ”.

(4) In point 2.1.6, in the second paragraph, before “regulatory” insert “ national ”.

(5) In point 2.2.1—

(a)in paragraph 1, in the first subparagraph—

(i)in the first sentence, for the words from “two or more” to the end, substitute—

Great Britain or Northern Ireland and—

(a)the other part of the United Kingdom or a connected member State; or

(b)if the national regulatory authority so directs, a connected third country,

in so far as the points are subject to booking procedures by users.;

(ii)omit the second sentence;

(b)omit paragraph 2;

(c)omit paragraph 4.

(6) In point 2.2.2—

(a)in paragraph 1, in the second sentence—

(i)for “adjacent Member States” substitute “ connected countries or territories ”;

(ii)for “the adjacent national regulatory” substitute “ those ”;

(b)in paragraph 3, in the third sentence, for “National regulatory authorities” substitute “ The national regulatory authority ”.

(7) In point 2.2.3—

(a)in paragraph 1—

(i)for “National regulatory authorities” substitute “ The national regulatory authority ”;

(ii)omit from “, on the basis” to “shown that”;

(iii)for “the year covered by the monitoring report” substitute “ the most recent year for which the national regulatory authority has the relevant information ”;

(b)in paragraph 2—

(i)for “If, on the basis of the yearly monitoring report, it is shown” substitute “ If the national regulatory authority considers ”;

(ii)for “relevant national regulatory authorities” substitute “ national regulatory authority ”;

(c)in paragraph 5—

(i)omit “— persons or undertakings and the undertakings they control pursuant to Article 3 of Regulation (EC) No 139/2004 —”;

(ii)at the end insert “ For this purpose, any capacity which is held by a person controlled by a network user is to be treated as capacity held by that network user. ”;

(d)in paragraph 6, omit the second sentence;

(e)in paragraph 7—

(i)in the first sentence, at the beginning, for “A” substitute “ The ”;

(ii)in the second sentence, for “adjacent Member States” substitute “ connected countries or territories ”;

(iii)in the third sentence, for “the adjacent national regulatory” substitute “ those ”.

(8) In point 2.2.5—

(a)in paragraph 1, for “National regulatory authorities” substitute “ The national regulatory authority ”;

(b)in paragraph 4, for “national regulatory authorities” substitute “ the national regulatory authority ”.

(9) In point 3.1.1(1)—

(a)in subparagraph (e)—

(i)for “authorities” substitute “ authority ”;

(ii)omit “— on the basis of an opinion on a harmonised format that shall be provided by the Agency —”;

(b)omit subparagraphs (g) and (h).

(10) In point 3.2(1)—

(a)in subparagraph (a), for “the EU” substitute “ Great Britain or Northern Ireland ”;

(b)in subparagraph (d), omit “as defined by Article 2(14) of Directive 2009/73/EC”.

(11) In point 3.3(1)—

(a)in the words before subparagraph (a), for “(a) to (g)”, in both places that it occurs, substitute “ (a) to (k) ”;

(b)omit subparagraph (l).

(12) In point 3.4(7), in the second sentence, before “regulatory” insert “ national ”.

Commencement Information

I19Sch. 2 para. 19 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

20.  In Annex II, in the correlation table, omit the rows which refer in the second column to Articles 3, 4, 5, 8, 9, 10, 11, 12, 23, 25, 26, 28 and 29.U.K.

Commencement Information

I20Sch. 2 para. 20 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Regulation 152(1)

SCHEDULE 3U.K.EU Regulations and Decisions: Revocations

1.  Council Regulation (EEC) No 625/83 of 15 March 1983 establishing specific measures of Community interest relating to energy strategy.U.K.

Commencement Information

I21Sch. 3 para. 1 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

2.  Council Regulation (EEC) No 1890/84 of 26 June 1984 introducing special measures of Community interest relating to energy strategy.U.K.

Commencement Information

I22Sch. 3 para. 2 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

3.  Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy.U.K.

Commencement Information

I23Sch. 3 para. 3 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

F24.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .U.K.

Textual Amendments

5.  Regulation (EU) No 1233/2010 of the European Parliament and of the Council of 15 December 2010 amending Regulation (EC) 663/2009 establishing a programme to aid economic financial recovery by granting Community financial assistance to projects in the field of energy.U.K.

Commencement Information

I24Sch. 3 para. 5 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

6.  Commission Decision of 11 August 2011 establishing the composition and the operational provisions of the Gas Coordination Group and repealing Commission Decision 2006/791/EC.U.K.

Commencement Information

I25Sch. 3 para. 6 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

7.  Commission Decision of 15 November 2012 setting up the Electricity Coordination Group.U.K.

Commencement Information

I26Sch. 3 para. 7 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

8.  The TEN-E Regulation.U.K.

Commencement Information

I27Sch. 3 para. 8 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

9.  Commission Delegated Regulation (EU) No 1391/2013 of 14 October 2013 amending Regulation (EU) 347/2013 of the European Parliament and of the Council on guidelines for trans-European energy infrastructure as regards the Union list of projects of common interest.U.K.

Commencement Information

I28Sch. 3 para. 9 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

10.  Commission Delegated Regulation (EU) 2016/89 of 18 November 2015 amending Regulation (EU) No 347/2013 of the European Parliament and of the Council as regards the Union list of projects of common interest.U.K.

Commencement Information

I29Sch. 3 para. 10 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

11.  Commission Decision of 9 March 2016 setting up a Commission expert group on electricity interconnection targets.U.K.

Commencement Information

I30Sch. 3 para. 11 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

12.  Commission Delegated Regulation (EU) 2018/540 of 23 November 2017 amending Regulation (EU) No 347/2013 of the European Parliament and of the Council as regards the Union list of projects of common interest.U.K.

Commencement Information

I31Sch. 3 para. 12 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Regulation 152(2)

SCHEDULE 4U.K.The TEN-E Regulation: Savings

1.  Chapter III (permit granting and public participation) of, and Annex VI (guidelines for transparency and public participation) to, the TEN-E Regulation continue to apply on and after [F3IP completion day] as if that Regulation had not been revoked, in relation to an existing permit application.U.K.

Textual Amendments

Commencement Information

I32Sch. 4 para. 1 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

2.  In paragraph 1, “an existing permit application” means an application for a permit to carry out works in the United Kingdom or in the UK marine area in relation to a relevant project, for which the statutory permit granting procedure started before [F4IP completion day].U.K.

Textual Amendments

Commencement Information

I33Sch. 4 para. 2 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

3.  In paragraph 2—U.K.

a relevant project” means—

(a)

a project which, immediately before [F5IP completion day], was on the Union list of projects of common interest referred to in Article 3 of the TEN-E Regulation; or

(b)

a project which had previously been on that list and, immediately before [F5IP completion day], maintained the rights and obligations arising from Chapter III of the TEN-E Regulation by virtue of the second subparagraph of Article 5(9) of that Regulation;

the statutory permit granting procedure” has the meaning given in Article 10(1)(b) of the TEN-E Regulation;

the UK marine area” has the meaning given in section 42 of the Marine and Coastal Access Act 2009 M12.

Textual Amendments

Commencement Information

I34Sch. 4 para. 3 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Marginal Citations

4.  Where Chapter III of and Annex VI to the TEN-E Regulation apply by virtue of paragraph 1, they apply with the following modifications.U.K.

Commencement Information

I35Sch. 4 para. 4 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

5.  Article 7 applies as if paragraphs 4 to 7, and the second subparagraph of paragraph 8, were omitted.U.K.

Commencement Information

I36Sch. 4 para. 5 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

6.  Article 8 applies as if—U.K.

(a)in paragraph 1, for “By 16 November 2013, each Member State shall designate one national competent authority which shall be”, there were substituted “ The Secretary of State is the competent authority ”;

(b)in paragraph 2, in the first subparagraph, in point (a), for “the competent authority notifies the Commission of that delegation and the information therein” there were substituted “ notice of that delegation ”;

(c)in paragraph 3—

(i)in the first subparagraph, for “Union law” in each place that it occurs, there were substituted “ retained EU law ”;

(ii)the third subparagraph were omitted.

(d)in paragraph 4, for “Member States may apply different schemes as set out in paragraph 3” there were substituted “ Different schemes as set out in paragraph 3 may be applied ”;

(e)in paragraph 5—

(i)for the words from “two” to “themselves” there were substituted “ the United Kingdom and in one or more member States, the competent authority must endeavour to cooperate efficiently and effectively and coordinate with the competent authorities of those member States ”;

(ii)for “Member States shall endeavour to provide for joint procedures”, there were substituted “ The Secretary of State must endeavour to provide for joint procedures with those member States ”.

Commencement Information

I37Sch. 4 para. 6 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

7.  Article 9 applies as if—U.K.

(a)in paragraph 1—

(i)the first sentence were omitted;

(ii)for the second sentence there were substituted “ The Secretary of State must update as necessary the manual of procedures for the permit granting process applicable to projects of common interest published under this Article as it applied before [F6IP completion day], and make it available to the public. ”;

(b)in paragraph 2, for “Union law” there were substituted “ retained EU law ”;

(c)in paragraph 4, in the first subparagraph, in the second sentence, after “according to” there were inserted “ retained EU law which, immediately before [F6IP completion day], implemented ”;

(d)in paragraph 5—

(i)for “two or more Member States” there were substituted “ the United Kingdom and one or more member States ”;

(ii)for “each of the Member States concerned” there were substituted “ the United Kingdom ”;

(e)in paragraph 6—

(i)in the first sentence, after “where”, there were inserted “ retained EU law which, immediately before [F6IP completion day], implemented ”;

(ii)the second sentence were omitted;

(f)in paragraph 7, in the first subparagraph, there were omitted “which shall be linked to the Commission website and”.

Textual Amendments

Commencement Information

I38Sch. 4 para. 7 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

8.  Article 10 applies as if—U.K.

(a)in paragraph 1—

(i)in point (a), for the third paragraph, there were substituted—

The start of the permit granting process is the date of signature by the competent authority of an acknowledgement of the project promoter's notification of the project, or, if the United Kingdom and one or more member States are concerned, the date of signature of an acknowledgement by the last of the competent authorities concerned.;

(ii)in point (b)—

(aa)at the end of the first sentence, there were inserted “or any shorter period specified by legislation”; and

(bb)the second sentence were omitted;

(b)in paragraph 2—

(i)in the first subparagraph, for the second sentence there were substituted—

However, where the competent authority considers that the statutory permit granting procedure will not be completed before the time limit in paragraph 1(b), it may decide, before its expiry and on a case by case basis, to extend that time limit by a maximum of nine months.;

(ii)the second subparagraph were omitted;

(c)in paragraph 3, for “In Member States where” there were substituted “ Where ”;

(d)paragraphs 4 and 5 were omitted; and

(e)in paragraph 6, for “Union law” there were substituted “ retained EU law ”.

Commencement Information

I39Sch. 4 para. 8 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

9.  Annex VI applies as if—U.K.

(a)points (2) and (5) were omitted; and

(b)in point (6)(a), for “referred to in point (5)” there were substituted “ published under point (5) as it applied before [F7IP completion day].

Textual Amendments

Commencement Information

I40Sch. 4 para. 9 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources