6. The finished ground level in respect of Work No. 1 is between 7.9 metres AOD and 9.9 metres AOD.
(1) Component | (2) Maximum length (m) | (3) Maximum width (m) | (4) Maximum height (m) | (5) Maximum diameter (m) |
---|---|---|---|---|
Gas turbine hall building | 76 | 76 | 30 | - |
Steam turbine hall building | 64 | 54 | 30 | - |
Heat recovery steam generator | 63 | 28 | 50 | - |
Electrical building near heat recovery steam generator | 30 | 27 | 10 | - |
Combine cycle gas turbine air intake filters (each) | 24 | 16 | 30 | - |
Electrical building near air intake filter | 24 | 16 | 10 | - |
Generator transformer | 21 | 20 | 15 | - |
Feed water pump building | 54 | 26 | 20 | - |
Demineralised water treatment plant, fire pumps and laboratory | 57 | 33 | 20 | - |
Demineralised water storage tank | - | - | 20 | 25 |
Gas reception facility | 65 | 52 | 5 | - |
Gas compressors | 50 | 20 | 10 | - |
Auxiliary boiler | 30 | 15 | 20 | - |
Auxiliary boiler stacks (each) | - | - | 25 | 1.5 |
Combined cycle gas turbine standby diesel generators | 19 | 9 | 8 | - |
Continuous emissions monitoring system container | 10 | 3 | 3 | - |
Cooling towers (each) | 240 | 27 | 30 | - |
Cooling water electrical module | 15 | 6 | 10 | - |
Cooling water pumps | 30 | 15 | 8 | - |
Cooling water sampling and dosing plant | 19 | 11 | 8 | - |
Peaking plant building | 103 | 65 | 30 | - |
Peaking plant stack(s) (each) (open cycle gas turbine) | - | - | 45 | 8 |
Peaking plant stack(s) (each) (gas engine) | - | - | 28 | 1.3 |
Black start facility | 55 | 43 | 30 | - |
Black start facility stack(s) (each) (open cycle gas turbine) | - | - | 45 | 2.5 |
Black start facility stack(s) (each) (gas engine) | - | - | 25 | 1.3 |
Diesel tank for black start diesel generator | - | - | 12 | 4 |
Electrical control room and administration building | 85 | 24 | 20 | - |
Electrical substation | 35 | 15 | 15 | - |
Workshop and stores | 51 | 20 | 12 | - |
Raw and fire water tank | - | - | 20 | 25 |
Gas bottle stores (each) | 17 | 5 | 3 | - |
Closed-circuit cooling water coolers | 15 | 10 | 10 | - |
Waste water treatment plant | 55 | 28 | 20 | - |
Firewater and stormwater retention basins | 110 | 50 | 0 | - |
Gatehouse | 12 | 12 | 5 | - |
(1) Component | (2) Grid reference of centre point of each stack (using reference system OSGB36 - Ordnance Survey Great Britain 1936) | (3) Maximum diameter of each stack (m) | (4) Top of each stack in mAOD |
---|---|---|---|
Combined cycle gas turbine stack | First stack— 457600 423933 Second Stack— 457593 423944 Third Stack— 457587 423933 | 9.6 | 99.9 |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: