PART 1NATIONAL GRID

Sedgemoor District Council – Section A

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94Dismantling of redundant infrastructureWork No. 4B
2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B
95, 96, 99, 100, 102, 103, 104, 107, 109, 112, 122, 124, 127, 129, 130, 153, 156 & 160Construction of authorised developmentWork No. 1B
111, 118, 119, 137, 138, 146, 147, 148, 150, 151, 152 & 155Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1B
165, 167, 168, 171, 173 & 176Construction of authorised developmentWorks Nos. 1A and 2A
163, 164 & 166Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1A and 2A
177, 178, 179 & 180Construction of authorised developmentWork No. 1A

Sedgemoor District Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

2, 3, 7, 25, 26, 27, 28, 30, 31, 48, 49, 50, 57 & 72Construction of authorised developmentWork No. 1B
4, 14, 36, 38, 39, 120, 125, 127, 131, 142, 159, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 273, 274, 278, 279, 281, 286, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 462, 463, 465, 470, 471, 472, 481, 485, 491, 495, 499, 500, 513, 531, 532, 533, 538, 543, 546, 547, 603.2, 603.3, 619, 625, 631, 660, 677 & 678Dismantling of redundant infrastructureWork No. 4B
5, 12, 15, 37, 76, 119, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 537, 591, 603.1, 620, 627, 641, 654 & 676Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
11, 16, 17, 40, 121, 122, 138, 139, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 267, 268, 270, 275, 276, 282, 283, 284, 287, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 459, 460, 464, 466, 478, 483, 484, 486, 496, 508, 509, 512, 621, 642, 653, 675 & 679Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B
13, 18, 22, 23, 24, 45 & 46Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1B and 4B
44 & 47Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1B
58, 59, 60, 69, 70 & 71Construction of authorised developmentWorks Nos. 1B and 1C
65, 66, 67, 68, 74, 75, 77, 87, 90, 93, 98, 103 & 104Construction of authorised developmentWork No. 1C
73, 82 & 83Construction of authorised developmentWorks Nos. 1B, 1C and 4B
78, 79, 80, & 84Construction of authorised developmentWorks Nos. 1C and 4B
81 & 86Construction of authorised developmentWorks Nos. 1C and 4BRemoval of pylon foundations only to a depth of 1 metre
85, 88, 89, 91, 92, 94, 95, 99 & 100Construction of authorised developmentWorks Nos. 1C and 1D
102, 108, 109, 111, 112, 113, 117, 199, 201, 202, 203, 206, 207, 210, 213, 214, 297, 298, 299, 302, 303, 306, 308, 309, 313, 316, 317, 318, 319, 321, 326, 330, 337, 339, 340, 342, 343, 344, 348, 350, 351, 354, 355, 356, 357, 374, 376, 436, 438, 440, 441, 442, 443, 446, 448, 451, 452, 517, 519, 521, 522, 523, 575, 577, 583, 590, 592, 594.1, 594.2, 601,1, 601.2, 605.1, 605.2, 605.3, 606.1, 606.2, 608.1, 608.2, 610, 613, 635 & 639Construction of authorised developmentWork No. 1D
118, 154, 156, 488, 489, 518 & 520Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1D and 4B
148, 149, 152, 197, 198, 200, 204, 205, 222, 223, 231, 245, 292, 294, 295, 311, 312, 314, 322, 324, 362, 363, 364 & 447Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1D
153Dismantling of redundant infrastructureWorks Nos. 1D and 4B
155, 157, 158, 163, 164, 502, 503, 507, 516, 582, 618 & 640Construction of authorised developmentWorks Nos. 1D and 4B
593, 595 & 596Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1D, 2B, 2C and 4B
597Construction of authorised developmentWorks Nos. 1D, 2B, 2C and 4B
599Construction of authorised developmentWorks Nos. 1D, 2B, 2D and 4B
611 & 612Construction of authorised developmentWorks Nos. 2B, 2D and 4BRemoval of pylon foundations only to a depth of 1 metre
614, 615 & 616Construction of authorised developmentWorks Nos. 1D, 2B and 4B
643, 652, 665, 681 & 682Construction of authorised developmentWorks Nos. 2B and 4B
636, 646, 651, 655, 661, 669.1, 669.2, 671, 673, 674, 680, 683, 685, 688 & 689Construction of authorised developmentWork No. 2B

Sedgemoor District Council and North Somerset Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

664Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B

Sedgemoor District Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1 & 2Dismantling of redundant infrastructureWork No. 4B
3, 4, 5, 7, 10, 11, 12, 16 & 17Construction of authorised developmentWork No. 2B
18Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre

Sedgemoor District Council and North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

19 & 27Construction of authorised developmentWork No. 2B
29 & 30Dismantling of redundant infrastructureWork No. 4B

North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

28, 31, 32, 36, 38, 39, 40, 42, 45, 46, 48, 49, 52, 57, 60, 63, 67, 69, 70, 79, 80, 81, 82, 87, 90, 92, 95, 97, 100, 104, 105, 107, 109, 110, 113, 114, 117, 118, 120, 121, 124, 126, 127, 130, 131, 133, 135, 138, 144, 146, 148, 149, 150, 155, 163, 164, 168, 170, 173, 175, 177, 178, 192, 194, 195, 197, 198, 200, 201, 203, 204, 218, 219, 220, 221, 223, 224, 226, 229, 230, 232, 237, 239, 241, 243, 246, 250, 254, 255, 266, 269, 270, 273, 275 & 278Construction of authorised developmentWork No. 2B
41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 282, 283, 284 & 285Dismantling of redundant infrastructureWork No. 4B
43, 233 & 256Construction of authorised developmentWorks Nos. 2B and 4B
50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 247, 251 & 272Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
181, 184, 185, 186, 208, 210 & 211Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B

North Somerset Council – Section D

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 2, 5, 6, 14, 16, 18, 58, 59.1, 59.2, 60 & 64Construction of authorised developmentWork No. 2B
7, 8, 9, 11, 12, 13, 112.1, 112.2, 112.3, 115, 117, 188, 189, 197, 203, 205, 210, 211, 213, 229, 248, 249, 253, 254, 278, 279, 283, 284, 285, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 349, 351, 367, 372, 492, 529, 544.1, 544.2, 548, 557, 558, 559, 561, 566, 567, 571, 572, 575, 591, 594, 595, 602, 604, 605, 611, 612, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970Dismantling of redundant infrastructureWork No. 4B
10, 76, 106, 187, 194, 198, 212, 232, 252, 288, 297, 308, 339, 345, 361, 371, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
19Construction of authorised developmentWorks Nos. 4B and 4CRemoval of pylon foundations only to a depth of 1 metre
20Construction of authorised developmentWorks Nos. 4B and 4C
21, 23, 24, 27, 28, 31, 33, 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48Construction of authorised developmentWork No. 4C
22, 38 & 39Dismantling of redundant infrastructureWork No. 4C
25 & 47Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4C
26 & 32Construction of authorised developmentWork No. 4CRemoval of pylon foundations only to a depth of 1 metre
50 & 51Construction of authorised developmentWorks Nos. 2B, 3A and 3B
52, 63, 70 & 73Construction of authorised developmentWorks Nos. 2B and 3A
53 & 61Construction of authorised developmentWorks Nos. 2B, 3A and 4B
62Construction of authorised developmentWorks Nos. 2B, 3A and 4BRemoval of pylon foundations only to a depth of 1 metre
77, 78, 79, 80, 102, 120 & 121Construction of authorised developmentWork No. 3A
84, 85, 90, 92, 95, 214, 307, 309, 310, 334.1, 334.2, 335, 368, 377, 378, 380, 381, 382, 406, 540, 541, 580, 581, 680, 681, 682, 684, 687, 698, 758, 759 & 761Construction of authorised developmentWork No. 1E
86, 208, 218, 226, 303, 317, 320, 322, 323, 324, 325, 344, 358, 362, 365, 366, 546, 547, 562, 564, 576, 597, 598, 599, 600, 601, 603, 618, 619, 676 & 826Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B
91, 256, 259, 266, 273, 275, 276, 316, 330, 374, 375, 403, 404, 405, 412, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551 & 552Construction of authorised developmentWorks Nos. 1E and 4B
94, 96.1 & 96.2Construction of authorised developmentWorks Nos. 1E and 4A
104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175 & 176Construction of authorised developmentWork No. 4A
131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4A
173, 178, 179, 180, 185, 186 & 193Dismantling of redundant infrastructureWork No. 4A
177Construction of authorised developmentWork No. 4ARemoval of pylon foundations only to a depth of 1 metre
183Dismantling of redundant infrastructureWork No. 4ARemoval of pylon foundations only to a depth of 1 metre
233, 235, 538, 588, 589, 607, 608, 685, 696, 700, 706, 710, 712, 713, 821, 823, 824, 974, 975 & 977Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1E
246, 263, 264, 268, 269, 270.1, 270.2, 271, 272, 299.1, 299.2, 301.1, 301.2, 302, 332.1, 332.2, 333, 337, 338, 369, 370, 373, 384, 386, 398, 399, 402, 407, 408.1, 408.2, 411, 436, 441, 447, 459, 460, 461, 462, 469, 472, 474, 477, 478, 531, 550, 555 & 556Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1E and 4B
326, 327, 328, 331, 563 & 565Construction of authorised developmentWork No. 4B
624, 783, 784, 785 & 833Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 4B and 4D
625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959Dismantling of redundant infrastructureWork No. 4D
626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980Construction of authorised developmentWork No. 4D
631, 633, 670, 769, 835, 873 & 907Dismantling of redundant infrastructureWork No. 4DRemoval of pylon foundations only to a depth of 1 metre
632, 639, 640, 641, 642, 650, 651, 671, 905 & 960Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4D
703, 704, 816, 976.1 & 976.2Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1E, 4B and 4D
770, 777, 780 & 781.2Dismantling of redundant infrastructureWorks Nos. 4B and 4D
781.1 & 815Dismantling of redundant infrastructureWorks Nos. 4B and 4DRemoval of pylon foundations only to a depth of 1 metre
818Construction of authorised developmentWorks Nos. 1E and 4D
981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020Construction of authorised developmentWork No. 4F
995 & 996Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4F
999 & 1000Dismantling of redundant infrastructureWork No. 4F
1001Construction of authorised developmentWork No. 4FRemoval of pylon foundations only to a depth of 1 metre

North Somerset Council – Section E

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 4, 6, 7, 163, 222, 232, 238 & 239Construction of authorised developmentWork No. 4D
10, 34 & 46Construction of authorised developmentWorks Nos. 4B and 4D
11Dismantling of redundant infrastructureWorks Nos. 4B and 4D
13, 68, 70, 79, 135, 168, 169, 170, 174 & 175Dismantling of redundant infrastructureWork No. 4B
22, 109 & 111Construction of authorised developmentWork No. 1E
23, 30, 45, 54 & 66Dismantling of redundant infrastructureWorks Nos. 4B and 4DRemoval of pylon foundations only to a depth of 1 metre
37, 40, 49, 60, 63, 132, 133, 138, 149, 162, 191 & 194Construction of authorised developmentWorks Nos. 1E and 4D
53, 112, 113, 154, 167 & 176Construction of authorised developmentWorks Nos. 1E, 4B and 4D
96, 116 & 120Dismantling of redundant infrastructureWork No. 4DRemoval of pylon foundations only to a depth of 1 metre
97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207 & 208Dismantling of redundant infrastructureWork No. 4D
117, 118, 121, 122, 123, 134 & 144Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4D
142, 143, 155 & 171Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
172 & 173Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B

North Somerset Council – Section F

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4B
5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 140, 141, 142, 143, 144, 145, 146, 149, 156, 158, 219.1, 222, 224, 225, 228 & 229Dismantling of redundant infrastructureWork No. 4B
9, 20, 28, 37, 157, 201 & 219.2Dismantling of redundant infrastructureWork No. 4BRemoval of pylon foundations only to a depth of 1 metre
43, 95, 98, 192, 194 & 213Construction of authorised developmentWork No. 4D
45, 94.3, 137, 147, 164, 165, & 262Construction of authorised developmentWork No. 1F
46, 48, 57, 72, 76, 88, 89, 90, 150, 151, 152, 153, 154, 155, 166, 214.1, 214.2 & 223Dismantling of redundant infrastructureWork No. 4D
64, 79, 200, 218 & 249Dismantling of redundant infrastructureWork No. 4DRemoval of pylon foundations only to a depth of 1 metre
87Construction of authorised developmentWorks Nos. 1E and 1F
148, 163 & 203Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 4B and 4D
160 & 161Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1F and 4D
176, 177, 178, 179, 186, 188, 196 & 217Construction of authorised developmentWorks Nos. 1F and 4D
226, 230, 231, 233, 247 & 248Construction of authorised developmentWork No. 4E
227Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 4B, 4D, 4E, 4G and 4P
232, 278 & 298Dismantling of redundant infrastructureWork No. 4GRemoval of pylon foundations only to a depth of 1 metre
234, 235, 240, 243, 276, 282 & 293Dismantling of redundant infrastructureWork No. 4G
253 & 255Dismantling of redundant infrastructureWork No. 4P
258Dismantling of redundant infrastructureWork No. 4PRemoval of pylon foundations only to a depth of 1 metre
260Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4P
266Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1F
269, 279, 280, 281, 294, 296, 300, 307, 312, 314, 316, 317 & 322Construction of authorised developmentWork No. 4P
284Construction of authorised developmentWork No. 4PRemoval of pylon foundations only to a depth of 1 metre
325Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1F, 4G and 4P
326, 327, 328, 329 & 330Construction of authorised developmentWorks Nos. 1F and 4P

North Somerset Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

23.1, 23.2, 24.1, 24.2, 25, 112 & 113Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4G
35, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 & 86Construction of authorised developmentWork No. 1F
39.1, 39.2, 42 & 43Dismantling of redundant infrastructureWork No. 4G
82Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1F and 4G
111 & 138Dismantling of redundant infrastructureWork No. 4GRemoval of pylon foundations only to a depth of 1 metre
120, 122, 124, 125, 127 & 130Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 1G and 4G

North Somerset Council and Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

139Dismantling of redundant infrastructureWork No. 4G

Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

143, 144, 145, 146, 148, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334Dismantling of redundant infrastructureWork No. 4G
147.1, 147.2, 260, 269, 302, 314 & 328Dismantling of redundant infrastructureWork No. 4GRemoval of pylon foundations only to a depth of 1 metre
171, 172, 173, 176, 177, 229, 369, 370, 494, 495, 510, 533, 535, 538, 540, 544, 546, 548 & 549Construction of authorised developmentWork No. 1G
236, 241, 242, 243, 244, 245, 361, 365, 366, 507, 508 & 509Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 1G
261, 319, 320 & 321Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4G
335Dismantling of redundant infrastructureWorks Nos. 4G and 4HRemoval of pylon foundations only to a depth of 1 metre
336Construction of authorised developmentWork No. 4K
337Construction of authorised developmentWorks Nos. 4I and 4K
338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482, 498, 504, 517, 518 & 519Dismantling of redundant infrastructureWork No. 4H
351, 352.1, 352.2, 353.1, 353.2, 355, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441Construction of authorised developmentWorks Nos. 1G and 4I
380Construction of authorised developmentWork No. 4I
397 & 409Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 4H
398, 405, 440 & 502Dismantling of redundant infrastructureWork No. 4HRemoval of pylon foundations only to a depth of 1 metre
562 & 564Construction of authorised developmentWorks Nos. 4M and 4N
565Dismantling of redundant infrastructureWork No. 4N
572 & 575Construction of authorised developmentWorks Nos. 1G, 4L, 4M and 4N
593.1, 593.2, 594, 596 & 597Construction of authorised developmentWork No. 5
604, 605, 606, 607, 609 & 610Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 4L, 4M, 4N, 4O and 5
608 & 611Construction of authorised developmentWorks Nos. 4L, 4M, 4N, 4O and 5

South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

558 & 559Construction of authorised developmentWorks Nos. 4M and 4N
560Construction of authorised developmentWorks Nos. 1G, 4L, 4M and 4N
573Construction of authorised developmentWork No. 4L

Bristol City Council and South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

561Construction of authorised developmentWorks Nos. 4M and 4N
574Construction of authorised developmentWork No. 4L

West Somerset District Council – Section H

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

6, 9, 11, 24, 25, 81.1 & 81.2Construction of authorised developmentWork No. 6E
29 & 30Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 6B, 6D and 6E
32Construction of authorised developmentWorks Nos. 6B, 6D and 6E
33, 34, 60 & 64Construction of authorised developmentWorks Nos. 6A, 6C and 6E
35, 37 & 65Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 6A, 6C and 6E
36 & 94Construction of authorised developmentWorks Nos. 6A and 6C
43, 44 & 45Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 6A and 6C
53Construction of authorised developmentWorks Nos. 6C and 6E
61 & 63Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 6A, 6B, 6C, 6D and 6E
82, 86 & 87Dismantling of redundant infrastructureWorks Nos. 6B and 6DRemoval of pylon foundations only to a depth of 1 metre
83, 84 & 85Dismantling of redundant infrastructureWorks Nos. 6B and 6D
88Dismantling of redundant infrastructureWork No. 6B
89, 90, 91 & 92Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWorks Nos. 6B and 6D
111Construction of authorised developmentWork No. 6A
114 & 117Construction of authorised developmentWorks Nos. 6C and 6D
115Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that accessWork No. 6C

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources