Search Legislation

The Cableway Installations Regulations 2004

Status:

This is the original version (as it was originally made).

SUBSYSTEMS : ASSESSMENT OF CONFORMITY

1.  EC examination is the procedure whereby, at the request of the manufacturer or his authorised representative established in the Community or, where such a person is not available, any natural or legal person who assumes responsibility for placing the subsystem on the market, a notified body checks and attests that a subsystem is:

  • in conformity with the provisions of the Directive and other relevant provisions in compliance with the Treaty,

  • in conformity with the technical documentation, and

  • completed.

2.  The examination of the subsystem is carried out at each of the following stages:

  • design,

  • construction and acceptance trials once the subsystem has been completed.

3.  The technical documentation accompanying the examination certificate must comprise the following:

  • construction plans and calculations, electrical and hydraulic diagrams, control circuit diagrams, description of computer and automatic systems, operating and servicing instructions, etc.,

  • a list of the safety components referred to in Article 4(2) of this Directive which are used in the subsystem,

  • copies of the EC declaration of conformity as provided for in Annex IV for these safety components together with the corresponding construction plans and a copy of the reports on any other tests and trials carried out.

4.  Documentation and correspondence in connection with EC examination procedures must be drawn up in the same language or languages as the instruction manual referred to in point 7.1.1 of Annex II.

5.  Surveillance

5.1.  It shall be ensured by means of surveillance that during construction of the subsystem the obligations arising from the technical documentation are fulfilled.

5.2.  The notified body responsible for EC examination must have permanent access to the production shops, storage areas and, where necessary, to prefabrication areas, testing plants and more generally to any locations it feels it needs to visit in order to perform its task. The manufacturer or his authorised representative or, where such a person is not available, the natural or legal person who places the subsystem on the market must provide it with, or arrange for it to be provided with, any documents required to that end, notably the plans and technical documentation relating to the subsystem.

5.3.  The notified body responsible for EC examination must periodically carry out audits to ensure compliance with the provisions of this Directive. On each visit it must provide the site supervisor responsible with an audit report. It may ask to be brought in to inspect various stages of the work.

5.4.  In addition, the notified body may pay unexpected visits to the production shops. During such visits it may carry out full or partial audits. The notified body must draw up a report on the visit and, where necessary, submit an audit report to the site supervisor responsible.

6.  Each notified body must publish periodically the relevant information concerning:

  • all applications for EC examination received,

  • all EC examination certificates issued,

  • all EC examination certificates refused.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources