The Cableway Installations Regulations 2004

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

SUBSYSTEMS : ASSESSMENT OF CONFORMITY

1.  EC examination is the procedure whereby, at the request of the manufacturer or his authorised representative established in the Community or, where such a person is not available, any natural or legal person who assumes responsibility for placing the subsystem on the market, a notified body checks and attests that a subsystem is:

  • in conformity with the provisions of the Directive and other relevant provisions in compliance with the Treaty,

  • in conformity with the technical documentation, and

  • completed.

2.  The examination of the subsystem is carried out at each of the following stages:

  • design,

  • construction and acceptance trials once the subsystem has been completed.

3.  The technical documentation accompanying the examination certificate must comprise the following:

  • construction plans and calculations, electrical and hydraulic diagrams, control circuit diagrams, description of computer and automatic systems, operating and servicing instructions, etc.,

  • a list of the safety components referred to in Article 4(2) of this Directive which are used in the subsystem,

  • copies of the EC declaration of conformity as provided for in Annex IV for these safety components together with the corresponding construction plans and a copy of the reports on any other tests and trials carried out.

4.  Documentation and correspondence in connection with EC examination procedures must be drawn up in the same language or languages as the instruction manual referred to in point 7.1.1 of Annex II.

5.  Surveillance

5.1.  It shall be ensured by means of surveillance that during construction of the subsystem the obligations arising from the technical documentation are fulfilled.

5.2.  The notified body responsible for EC examination must have permanent access to the production shops, storage areas and, where necessary, to prefabrication areas, testing plants and more generally to any locations it feels it needs to visit in order to perform its task. The manufacturer or his authorised representative or, where such a person is not available, the natural or legal person who places the subsystem on the market must provide it with, or arrange for it to be provided with, any documents required to that end, notably the plans and technical documentation relating to the subsystem.

5.3.  The notified body responsible for EC examination must periodically carry out audits to ensure compliance with the provisions of this Directive. On each visit it must provide the site supervisor responsible with an audit report. It may ask to be brought in to inspect various stages of the work.

5.4.  In addition, the notified body may pay unexpected visits to the production shops. During such visits it may carry out full or partial audits. The notified body must draw up a report on the visit and, where necessary, submit an audit report to the site supervisor responsible.

6.  Each notified body must publish periodically the relevant information concerning:

  • all applications for EC examination received,

  • all EC examination certificates issued,

  • all EC examination certificates refused.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill