Search Legislation

London Underground Act 1992

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As enacted)

Status:

This is the original version (as it was originally enacted). This item of legislation is currently only available in its original format.

Section 4.

SCHEDULE 1Descriptions of works referred to in section 4 of this Act

Part IThe railway

In the city of Westminster—

  • Work No. 1A A railway (655 metres in length in tunnel) commencing by a junction with the eastbound line of the Jubilee Line of the Company beneath a point 45 metres east of the junction of Park Place with St. James’s Street and terminating by a junction with Work No. 2 at its commencement beneath a point in St. James’s Park 293 metres west of the junction of Horse Guards with Bird Cage Walk and Great George Street;

  • Work No. 1B A railway (520 metres in length in tunnel) commencing by a junction with the westbound line of the Jubilee Line of the Company beneath a point 100 metres east of the said junction of Park Place with St. James’s Street and terminating by a junction with Work No. 1A at its termination and Work No. 2 at its commencement;

In the city of Westminster and in the London boroughs of Lambeth and Southwark—

  • Work No. 2 A railway (7,770 metres in length in tunnel) commencing by a junction with Works Nos. 1A and 1B at their termination and terminating beneath the river Thames at a point on the boundary between the London boroughs of Southwark and Tower Hamlets 300 metres east of the junction of Silver Walk with Rotherhithe Street, Southwark;

In the London boroughs of Tower Hamlets, Greenwich and Newham—

  • Work No. 3A A railway (4,834 metres in length mainly in tunnel) commencing by a junction with Work No. 2 at its termination and terminating at a point 65 metres north of the junction of Ives Road with Stephenson Street, Newham;

In the London borough of Newham—

  • Work No. 4 A railway (2,960 metres in length) commencing by a junction with Work No. 3A at its termination and terminating at a point 355 metres north of the junction of Kennard Road with Gibbins Road;

  • Work No. 5 A railway (735 metres in length) commencing by a junction with Work No. 4 at a point 175 metres south-east of the junction of Canning Road with Abbey Road and terminating at a point 72 metres south of the junction of Channelsea Road with Burford Road together with a depot for the stabling and maintenance of rolling stock.

Part IIOther works

In the city of Westminster—

  • Work No. 6B A pedestrian subway commencing at the western corner of Parliament Street and Great George Street and terminating at the northern corner of Parliament Street and Bridge Street;

  • Work No. 7 A pedestrian subway commencing on the southern side of Bridge Street and terminating at the western corner of Victoria Embankment and Bridge Street;

  • Work No. 8 A pedestrian subway commencing at the western corner of Victoria Embankment and Bridge Street and terminating on the eastern side of Victoria Embankment;

In the London borough of Southwark—

  • Work No. 9 A road forming an improvement and realignment of Duke Street Hill commencing at a point in that road at its junction with Borough High Street and terminating at a point in Duke Street Hill at its junction with Joiner Street;

  • Work No. 9A (shown on the (No. 2) plans as Work No. 1A) A subway, including escalator subways, commencing by a junction with Work No. 2 beneath a point 48 metres north-west of the junction of Isabella Street with Joan Street and terminating in the British Railways Board’s Waterloo Station (East) at platform level at a point 17 metres north of the junction of Wootton Street with Greet Street;

  • Work No. 9B (shown on the (No. 2) plans as Work No. 1B) A footbridge at the said Board’s station between platforms lettered A and D and passing over the railway between Charing Cross and London Bridge stations;

In the London borough of Newham—

  • Work No. 10 A road forming an improvement and raising of Canning Road commencing at a point in that road 78 metres south of its existing intersection with Abbey Road and terminating by a junction with Abbey Road (Work No. 11) at that existing intersection;

  • Work No. 11 A road forming an improvement and raising of Abbey Road commencing at a point in that road 97 metres west of its existing intersection with Canning Road and terminating at a point in Abbey Road 123 metres east of its said existing intersection;

  • Work No. 12 A cut forming a diversion of the Channelsea River commencing at a point in that river 140 metres east of the junction of Kennard Road with Gibbins Road and terminating at a point in that river 340 metres north of the said road junction;

In the London borough of Lambeth—

  • Work No. 13 A jetty commencing at a point on the east bank of the river Thames at Jubilee Gardens 151 metres north-west of the junction of Chicheley Street with Belvedere Road, extending in a westerly direction into the said river for a distance of 69 metres and there terminating;

In the London borough of Southwark—

  • Work No. 14 A jetty commencing at a point on the west bank of the river Thames at Durands Wharf 208 metres south-east of the junction of Silver Walk with Rotherhithe Street, extending in an easterly direction into the said river for a distance of 120 metres and there terminating.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources