In Greater London—
In the London borough of Southwark—
Work No. 1 A railway (507 metres in length) being a deviation of the existing southbound railway of the Northern Line, commencing by a junction with that railway beneath the river Thames at a point 153 metres north-east of the junction of London Bridge and Montagu Close and terminating by a junction with that railway beneath a point 82 metres north-east of the junction of Union Street and Borough High Street.
Work No. 2 A new ticket hall and subway (135 metres in length), including an escalator subway, commencing beneath a point 24 metres south-west of the junction of Bedale Street and Borough High Street and terminating beneath a point 21 metres north of the junction of London Bridge Street and Borough High Street.
Work No. 3 A subway (89 metres in length) commencing by a junction with an existing subway beneath a point 27 metres east of the junction of London Bridge Street and Borough High Street and terminating by a junction with the Northern Line southbound station tunnel beneath a point 83 metres north-east of the junction of those streets.
Work No. 4 A subway (26 metres in length) commencing by a junction with Work No. 3 beneath a point 44 metres north-east of the junction of London Bridge Street and Borough High Street and terminating by a junction with the Northern line southbound station tunnel beneath a point 53 metres north-east of the junction of those streets.
Work No. 5 A subway (26 metres in length) commencing by a junction with Work No. 2 at a point 23 metres south-west of the junction of St. Thomas Street and Borough High Street and terminating in the footway of Borough High Street at a point 32 metres south-west of the junction of those streets.
Work No. 6 A subway (27 metres in length) commencing by a junction with Work No. 2 at a point 34 metres south-west of the junction of St. Thomas Street and Borough High Street and terminating in Southwark Street at a point 60 metres south-west of the junction of those streets.
Work No. 7 A sewer (154 metres in length) being a diversion of part of the Battlebridge sewer commencing by a junction with that sewer beneath a point 27 metres north of the junction of London Bridge Street and Borough High Street and terminating by a junction with that sewer beneath a point 55 metres south-west of the junction of St. Thomas Street and Borough High Street.
Work No. 8 A subway including a shaft (90 metres in length) commencing at a point 90 metres south-west of the junction of Southwark Street and Stoney Street and terminating by a junction with Work No. 1 beneath a point 25 metres south-east of the junction of those streets.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: