- Latest available (Revised)
- Original (As adopted by EU)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
This is the original version (as it was originally adopted).
1.In addition to the provisions of Article 24.02, the following provisions may be applied to craft which were laid down on or before 1 April 1976.
The following definitions apply in the table below:
‘RC’: The provision does not apply to craft which are already operating, unless the parts concerned are replaced or converted, i.e. the provision applies only to the Replacement or Conversion of the parts or areas concerned. If existing parts are replaced by replacement parts using the same technology and of the same type, this does not constitute replacement (‘R’) within the meaning of the transitional provisions.
‘Issue or renewal of the Community certificate’: The provision must be complied with by the time of the next issue or renewal of the Community certificate after the date indicated.
Article and paragraph | Content | Deadline and comments |
---|---|---|
CHAPTER 3 | ||
3.03(1)(a) | Situation of collision bulkhead | RC, at the latest on issue or renewal of the Community certificate after 1.1.2035 |
3.04(2) | Common surfaces of bunkers and accommodation and passenger areas | RC, at the latest on issue or renewal of the Community certificate after 1.1.2035 |
paragraph 7 | Maximum permissible sound pressure level | Issue or renewal of the Community certificate after 1.1.2015 |
CHAPTER 4 | ||
4.01(2), 4.02 and 4.03 | Safety clearance, freeboard, minimum freeboard | Issue or renewal of the Community certificate after 1.1.2015 |
CHAPTER 7 | ||
7.01(2) | Sound pressure generated by the vessel | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
7.05(2) | Monitoring of navigation lights | Issue or renewal of the Community certificate |
CHAPTER 8 | ||
8.08 (3) and (4) | Minimum pumping capacity and internal diameter of drainage pipes | Issue or renewal of the Community certificate after 1.1.2015 |
8.10(2) | Noise generated by a vessel under way | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
CHAPTER 9 | ||
9.01 | Requirements for electrical equipment | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.03 | Protection against physical contact, intrusion of solid objects and the ingress of water | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.06 | Maximum permissible voltages | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.10 | Generators and motors | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.11(2) | Installation of accumulators | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.12 | Switch-gear installations | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.14 | Installation fittings | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.15 | Cables | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
9.17 | Navigation lights | RC, at the latest on issue or renewal of the Community certificate after 1.1.2015 |
CHAPTER 12 | ||
12.02(5) | Noise and vibration in accommodations | Issue or renewal of the Community certificate after 1.1.2015 |
CHAPTER 15 | ||
15.02(5), (6), first sentence, (7) to (11) and (13) | Margin line if no bulkhead deck | RC, at the latest on issue or renewal of the Community certificate after 1.1.2045 |
15.02(16) | Watertight windows | RC, at the latest on issue or renewal of the Community certificate after 1.1.2045 |
15.04 | Safety clearance, freeboard, immersion measures | RC, at the latest on issue or renewal of the Community certificate after 1.1.2045 |
15.05 | Number of passengers | Issue or renewal of the Community certificate after 1.1.2015 |
15.10 (4), ( 6), (7), (8) and (11) | Emergency power plant | RC, at the latest on issue or renewal of the Community certificate after 1.1.2045 |
2.Article 15.11(3)(a), applies to day-trip vessels laid down on or before 1 April 1976 until the first issue or renewal of the Community certificate after 1.1.2045, with the proviso that only paints, varnishes, coatings and other materials used on surfaces facing escape routes and other materials for the surface treatment of panels must be fire-resistant and that smoke or toxic vapours may not develop to any dangerous extent.
3.Article 15.11(12), applies to day-trip vessels laid down on or before 1 April 1976 until the first issue or renewal of the Community certificate after 1.1.2045, with the proviso that it is sufficient if, instead of stairs in the form of a load-bearing steel assembly, the stairs serving as an escape route are designed in such a way that they remain useable, in the event of a fire, for about the same time as stairs in the form of a load-bearing steel assembly.
The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Directive you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Annex you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Annex you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: