- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).
Document | Date | Document Title |
---|---|---|
6.1 | 15 April 2015 | Introduction |
6.2 | 15 April 2015 | Scheme Description |
6.3 | 15 April 2015 | Design Iterations and Alternatives Considered |
6.3.1 | 15 April 2015 | Appendix 3.1 Strategic Options Report |
6.3.2 | 15 April 2015 | Appendix 3.2 Alternatives - Route Corridor Investigation Study |
6.4 | 15 April 2015 | Appendix 3.3 Alternatives - Crossing Options Report A |
6.4.1 | 15 April 2015 | EIA Methodology and Construction Environmental Management |
6.4.2 | 15 April 2015 | Appendix 4.1 PINS Scoping Opinion Comments |
6.5 | 15 April 2015 | Air Quality |
6.5.1 | 15 April 2015 | Appendix 5.1 Dust risk Assessment |
6.6 | 15 April 2015 | Cultural Heritage |
6.6.1 | 15 April 2015 | Appendix 6.1 Desk-Based Assessment |
6.6.2 | 15 April 2015 | Appendix 6.2 Aerial Photograph Analysis at Paull |
6.6.3 | 15 April 2015 | Appendix 6.3 Geophysical Surveys Undertaken at Paull |
6.6.4 | 15 April 2015 | Appendix 6.4 Geophysical surveys Undertaken at Goxhill |
6.6.5 | 15 April 2015 | Appendix 6.5 Southend Bypass Geophysical Survey |
6.7 | 15 April 2015 | Ecology and Nature Conservation |
6.7.1 | 15 April 2015 | Appendix 7.1 Technical Appendix |
6.7.2 | 15 April 2015 | Appendix 7.2 Potentially Excepted Information |
6.8 | 15 April 2015 | Update Deadline 8? |
6.8.1 | 15 April 2015 | Geology and Soils |
6.8.2 | 15 April 2015 | Appendix 8.1 Environmental Agency and Local Authority Responses |
6.8.2 | 15 April 2015 | Appendix 8.2 Desk Study Report Plan 1 |
6.8.2 | 15 April 2015 | Appendix 8.2 Desk Study Report Plan 2 |
6.8.3.2 | 15 April 2015 | Appendix 8.2 Desk Study Report Plan 3 |
6.8.3 | 15 April 2015 | Appendix 8.3 Ground Investigation Report |
6.8.3.1 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 1 |
6.8.3.2 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 2 |
6.8.3.3 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 3 |
6.8.3.4 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 4 |
6.8.3.5 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 5 |
6.8.3.6 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 6 |
6.8.3.7 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 7 |
6.8.3.8 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 8 |
6.8.3.9 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 9 |
6.8.3.10 | 12 October 2015 | Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 10 |
6.8.3.11 | 02 November 2015 | Appendix 8.3 Addendum - Phase II Test Results and Factual Report |
6.8.4 | 15 April 2015 | Appendix 8.4 Paull Holme Strays Investigation Report |
6.8.5 | 15 April 2015 | Appendix 8.5 Chalk Report |
6.8.6 | 15 April 2015 | Appendix 8.6 Geophysical Survey Report 1 |
6.8.6 | 15 April 2015 | Appendix 8.6 Geophysical Survey Report 2 |
6.8.6 | 15 April 2015 | Appendix 8.6 Geophysical Survey Report 3 |
6.8.7 | 15 April 2015 | Appendix 8.7 Information Relating to Stoneledge Field Investigation |
6.8.8 | 15 April 2015 | Appendix 8.8 Responses from Lincolnshire Environmental Records Centre East Yorkshire RIGS Group |
6.8.9 | 15 April 2015 | Appendix 8.9 Unexploded Ordnance Report |
6.9 | 15 April 2015 | Landscape and Visual Amenity |
6.10 | 15 April 2015 | Noise and Vibration |
6.10.1 | 15 April 2015 | Appendix 10.1 Noise Monitoring Installation Sheets and Time History |
6.10.2 | 15 April 2015 | Appendix 10.2 Noise Model Inputs |
6.10.3 | 15 April 2015 | Appendix 10.3 Noise Model Outputs |
6.11 | 15 April 2015 | Socio-Economics and Land Use |
6.11.1 | 15 April 2015 | Appendix 11.1 Agricultural Land Survey |
6.12 | 15 April 2015 | Traffic and Transport |
6.13 | 15 April 2015 | Water Resources |
6.13.1 | 15 April 2015 | Appendix 13.1 Water Framework Directive Assessment |
6.13.2A | 13 January 2016 | Appendix 13.2 Initial Site Water Management Plan |
6.13.2.1 | 13 January 2016 | Comparison between Initial Site Water Management Plan versions 6.13.2 and 6.13.2A |
16.13.3 | 15 April 2015 | Appendix 13.3 Hydrogeological Impact Assessment |
6.13.3.1 | 12 October 2015 | Appendix 13.3 Addendum - Mini-Pumping Test Results and Factual Report |
6.13.3.2 | 12 October 2015 | Appendix 13.3 Addendum Report to Hydrogeological Impact Assessment |
6.14 | 15 April 2015 | Cumulative Effects |
6.15 | 15 April 2015 | Cumulative Effects |
6.16 | 15 April 2015 | Screening Opinions |
6.17 | 15 April 2015 | Scoping Opinion |
6.18 | 15 April 2015 | EIA Regulations Publicity Requirements |
6.19 | 15 April 2015 | Non-Technical Summary |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys