(This note is not part of the Order)
This Order authorises the construction, operation and maintenance of an offshore wind farm in navigable waters consisting of 30 wind turbines off the coast of Skegness, Lincolnshire including the provision of cabling under the sea between the turbines and the shore. The Order also provides for an exclusion zone for navigation, during construction.
A copy of the deposited plans and the deposited sections prescribed by rules 12(1), 12(3) and 12(5) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000 (S.I. 2000/2190) may be inspected free of charge during working hours at the offices of AMEC Offshore Wind Power Limited, Bridge End, Hexham, Northumberland NE46 4NU.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys