Search Legislation

The REACH etc. (Amendment etc.) (EU Exit) Regulations 2019

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 2

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The REACH etc. (Amendment etc.) (EU Exit) Regulations 2019, SCHEDULE 2. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 4

SCHEDULE 2U.K.Transitional provision

This schedule has no associated Explanatory Memorandum

1.  After Article 127 of the REACH Regulation insert—U.K.

TITLE 14AU.K.EU withdrawal: transitional provision

Article 127AU.K.Existing EU registrations which have effect as [F1GB] registrations

1.  An existing EU registration under Articles 6, 7(1), 7(5) or 24(1) of EU REACH has effect on and after [F2IP completion day] as a [F1GB] registration (the “transferred [F1GB] registration”) if the registration—

(a)has a current connection with [F3Great Britain], or

(b)has a relevant past connection with [F3Great Britain] (but does not have a current connection with [F3Great Britain]).

2.  A registration has a current connection with [F3Great Britain] if—

(a)the registrant immediately before [F2IP completion day] is a person established in [F3Great Britain] (a “current [F1GB] registrant”), and

(b)a registration of the substance concerned by the current [F1GB] registrant is a registration of a kind that could be submitted on [F2IP completion day] under Article 6 or 7(1) or (5) of this Regulation.

3.  A registration has a relevant past connection with [F3Great Britain] if—

(a)the registrant at any time [F4in the period beginning with 29 March 2017 and ending immediately] before [F2IP completion day] was a person established in [F3Great Britain] (a “former [F1GB] registrant”), and

(b)a registration of the substance concerned by the former [F1GB] registrant is a registration of a kind that could be submitted on [F2IP completion day] under Article 6 or 7(1) or (5) of this Regulation.

4.  Where an existing EU registration has effect by virtue of this Article as a transferred [F1GB] registration, it has effect—

(a)if it is an existing EU registration under Article 6 of EU REACH, as a transferred [F1GB] registration under Article 6 of this Regulation;

(b)if it is an existing EU registration under Article 7(1) of EU REACH, as a transferred [F1GB] registration under Article 7(1) of this Regulation;

(c)if it is an existing EU registration under Article 7(5) of EU REACH, as a transferred [F1GB] registration under Article 7(5) of this Regulation;

(d)if it is an existing EU registration that existed by virtue of Article 24(1) of EU REACH, as a transferred [F1GB] registration that exists by virtue of Article 6 of this Regulation.

5.  Where a registration that has a current connection with [F3Great Britain] has effect as a transferred [F1GB] registration by virtue of this Article, the current [F1GB] registrant becomes the registrant in relation to the transferred [F1GB] registration on [F2IP completion day].

6.  Where a registration that has a relevant past connection with [F3Great Britain] has effect as a transferred [F1GB] registration by virtue of this Article, the former [F1GB] registrant becomes the registrant in relation to the transferred [F1GB] registration on [F2IP completion day].

If two or more persons have been former [F1GB] registrants at different times [F5in the period beginning with 29 March 2017 and ending immediately before [F2IP completion day]], only the person who was the former [F1GB] registrant most recently before [F2IP completion day] is to become registrant in relation to the transferred [F1GB] registration by virtue of this paragraph.

Article 127BU.K.Application of this Regulation to transferred [F1GB] registrations

1.  The other Titles of this Regulation apply to a transferred [F1GB] registration as they would apply to the registration—

(a)if it had been submitted on [F2IP completion day] to the Agency under Article 6 or 7(1) or (5) (as the case may be);

(b)in a case where the existing EU registration came into existence by virtue of Article 24(1) of EU REACH, if it had been submitted on [F2IP completion day] to the Agency under Article 6.

Accordingly, no registration under that Article needs to be submitted.

2.  But, in their application to the transferred [F1GB] registration, the other Titles of this Regulation have effect with the modifications set out in the following provisions of this Article.

3.  In the case of—

(a)a transferred [F1GB] registration under Article 6, no fee is payable under Article 6(4);

(b)a transferred [F1GB] registration under Article 7, no fee is payable under Article 7(1) or (5).

4.  The registrant must submit—

(a)the Article 10 information referred to in Article 10(a)(i), (ii), and (iii), and any relevant indication under Article 10(a)(viii), to the Agency within the 120 day [F6post-IP completion] period;

(b)the other Article 10 information to the Agency within the [F7relevant] [F6post-IP completion] period.

Where the existing EU registration existed by virtue of Article 24(1) of EU REACH, the duty under this paragraph does not apply in relation to a transferred [F1GB] registration unless Article 24(2) applied in relation to the notified substance concerned before [F2IP completion day].

5.  The technical dossier that is submitted in accordance with point (a) in Article 10 does not need to include the proposals for testing mentioned in paragraph (ix) if, before [F2IP completion day], ECHA has made a decision under Article 40(3) of EU REACH in relation to the testing proposals included in the technical dossier that was included in the existing EU registration.

For further provision about certain cases where there is an existing EU decision on a testing proposal, see Article 127I.

6.  The registrant must submit the registration number and registration date assigned to the existing EU registration by ECHA in accordance with Article 20(3) of EU REACH, and such other evidence as the Agency may require of the existing EU registration, to the Agency within the 120 day [F6post-IP completion] period.

7.  Article 20 has effect with the following provision substituted for paragraphs 1 to 3—

1.  The Agency must assign a submission date to each transferred [F1GB] registration, which must be the date on which the registrant complies with paragraph 4(a) or (b) of Article 127B.

2.  The Agency may undertake a completeness check of each registration in order to ascertain that all the elements required under Articles 10 and 12 have been provided. The completeness check must not include an assessment of the quality or the adequacy of any data or justifications submitted.

If a registration is incomplete, the Agency must inform the registrant as to what further information is required in order for the registration to be complete, while setting a reasonable deadline for this. The registrant must complete his registration and submit it to the Agency within the deadline set. The Agency must confirm the submission date of the further information to the registrant. The Agency must perform a further completeness check, considering the further information submitted.

3.  Once the registrant has complied with paragraph 4(a) of Article 127B, the Agency must assign a registration number to the substance concerned and a registration date, which must be the same as the registration date for the existing EU registration..

8.  Article 21 has effect with the following provision substituted for the first subparagraph of paragraph 1—

1.  A registrant of a transferred [F1GB] registration may continue the manufacture or import of a substance or production or import of an article from [F2IP completion day], subject to any indication to the contrary from the Agency in accordance with Article 20(2)..

9.  The Agency is not required by Article 41(5) to carry out compliance checking of dossiers relating to transferred [F1GB] registrations in the tonnage bands of over 100 to 1,000 tonnes or over 1,000 tonnes.

10.  The reference in Article 43(1) to the preparation of a draft decision within 180 days of receiving a registration has effect as a reference to the preparation of a draft decision within 180 days of receipt of the information required by Article 10(a)(ix) under paragraph 4.

Article 127CU.K.Decisions of ECHA relating to existing EU registrations

1.  This Article applies in relation to an existing EU registration which has effect as a transferred [F1GB] registration under Article 127A.

2.  Any existing ECHA decision which relates to the registration has effect on and after [F2IP completion day] as a decision of the Agency which relates to the transferred [F1GB] registration.

3.  The registrant must—

(a)notify the Agency, within the 120 day [F6post-IP completion] period, of any existing ECHA decision which relates to the registration, and

(b)if required to do so by the Agency, supply the Agency, within the period specified by the Agency, with copies of any existing ECHA decision which relates to the registration.

4.  The Agency may extend any period of time specified in an existing ECHA decision.

5.  The other Titles of this Regulation apply to the decision as they would apply to it if it had been made by the Agency on [F2IP completion day].

6.  In this Article “existing ECHA decision” means a decision which has been made by ECHA under any provision of EU REACH and which is valid immediately before [F2IP completion day].

Article 127DU.K.Interpretation of Articles 127A to 127C

1.  In Articles 127A to 127C—

Article 10 information” means the information which a registration is required to include by virtue of Article 10;

existing EU registration” means a registration of a substance with ECHA which is subsisting immediately before [F2IP completion day];

transferred [F1GB] registration” has the meaning given in Article 127A(1);

[F1GB] registration” means a registration of a substance with the Agency.

[F8Article 127EU.K. [F9Pre-IP completion] downstream users and distributors that are to continue to be regarded as downstream users

1.  This Article applies in a case where—

(a)a person is—

(i)an existing [F1GB] downstream user under EU REACH, or

(ii)an existing [F1GB] distributor under EU REACH,

in relation to a substance (the “[F1GB] user or distributor”), and

(b)there is a protected transitional import of the substance by the [F1GB] user or distributor.

2.  There is a protected transitional import of the substance by the [F1GB] user or distributor if—

(a)the substance is imported to [F3Great Britain] on its own, in a mixture or in an article,

(b)the [F1GB] user or distributor is the importer in relation to the import,

(c)the import occurs during the [F10relevant] [F6post-IP completion] period, and

(d)either—

(i)the person who supplies the substance, mixture or article to the [F1GB] user or distributor for the import is a registrant or a downstream user under EU REACH as respects the substance as it is imported (the “relevant supplier”), or

(ii)an only representative appointed under Article 8(1) of EU REACH by the manufacturer, formulator or producer of the substance, mixture or article is a registrant under EU REACH as respects the substance as it is imported.

3.  The [F1GB] user or distributor is to be treated for the purposes of this Regulation—

(a)as a downstream user as respects any protected transitional imports of the substance by them (if they are an existing [F1GB] downstream user under EU REACH), or

(b)as a distributor as respects any protected transitional imports of the substance by them (if they are an existing [F1GB] distributor under EU REACH).

4.  For the purposes of deciding whether the requirement in paragraph 2(d)(i) is met in relation to a particular import, it does not matter whether the relevant supplier is—

(a)the person from which the [F1GB] user or distributor obtained supplies of the substance, mixture or article before [F2IP completion day] (and therefore the person in relation to which the [F1GB] user was a downstream user or distributor under EU REACH), or

(b)a different person.

5.  For the purposes of deciding whether the requirement in paragraph 2(d)(ii) is met in relation to a particular import, it does not matter whether the manufacturer, formulator or producer who has appointed the only representative is—

(a)the person who was the manufacturer, formulator or producer of supplies of the substance, mixture or article which the [F1GB] user or distributor obtained before [F2IP completion day], or

(b)a different person.

6.  The provisions of this Regulation that apply to importers [F11, including in respect of protected NI imports,] do not apply to the [F1GB] user or distributor in relation to the protected transitional import of the substance by the [F1GB] user or distributor.

7.  If the [F1GB] user or distributor imports the substance into [F3Great Britain] in quantities of 1 to 10 tonnes per year, they must within the [F12300] day [F6post-IP completion] period—

(a)supply the Agency with the information referred to in point (a)(i) of Article 10;

(b)supply the Agency with the information referred to in points (a)(ii) and (iv) of Article 10 to the extent that information is available to the [F1GB] user or distributor;

(c)supply the Agency with the information referred to in points (a) to (d) of Article 32(1) and otherwise comply with Article 32;

(d)supply the Agency with the relevant registration number for the substance under EU REACH to the extent that information is available to the [F1GB] user or distributor;

(e)supply the Agency with such other evidence as the Agency may require demonstrating that the information supplied in accordance with subparagraph (c) complies with the requirements of Articles 10, 12 and 14 (as they apply to the tonnage of the substance which the [F1GB] user or distributor imports into [F3Great Britain] by protected transitional [F13imports);]

[F14(f)if any part of the import is a protected NI import, notify the Agency of the quantity of the import that is a protected NI import.]

8.  If the [F1GB] user or distributor imports the substance into [F3Great Britain] in quantities of 10 tonnes or more per year, they must within the [F15300] day [F6post-IP completion] period—

(a)supply the Agency with the information referred to in point (a)(i) of Article 10;

(b)supply the Agency with the information referred to in points (a)(ii) and (iv) of Article 10 to the extent that information is available to the [F1GB] user or distributor;

(c)supply the Agency with the information referred to in—

(i)Article 14(6) to the extent that information is available to the [F1GB] user or distributor,

(ii)Article 31, and

(iii)Article 32(1)(a) to (d);

(d)otherwise comply with Articles 14(6), 31 and 32;

(e)supply the Agency with the relevant registration number for the substance under EU REACH to the extent that information is available to the [F1GB] user or distributor;

(f)supply the Agency with such other evidence as the Agency may require demonstrating that the information supplied in accordance with subparagraph (c) complies with the requirements of Articles 10, 12 and 14 (as they apply to the tonnage of the substance which the [F1GB] user or distributor imports into [F3Great Britain] by protected transitional [F16imports);]

[F17(g)if any part of the import is a protected NI import, notify the Agency of the quantity of the import that is a protected NI import.]

9.  The [F1GB] user or distributor must provide the Agency with updated information of the kind required by paragraph 7 or 8, in particular where the [F1GB] user or distributor begins to import the substance—

(a)from a different relevant supplier, or

(b)from a different manufacturer, formulator or producer who (as described in paragraph 2(d)(ii)) has appointed an only representative that is a registrant under EU REACH.

10.  This Article ceases to apply to the [F1GB] user or distributor as respects a protected transitional import of the substance by them if they become a registrant or downstream user under this Regulation [F18, or a notification is made under Article 139A,] in relation to the substance as so imported by them.

For that purpose, a person is not to be treated as having become a downstream user because they are treated as one in accordance with paragraph 3(a).

11.  Paragraphs 7, 8 and 9 are subject to paragraph 3 of Article 127EA [F19and paragraph 6 of Article 127EB].

12.  In this Article—

existing [F1GB] distributor under EU REACH” means a person who was, at any time in the 2 year period before [F2IP completion day], a distributor under EU REACH established in [F3Great Britain] in relation to a substance on its own, in a mixture or in an article;

existing [F1GB] downstream user under EU REACH” means a person who was, at any time in the 2 year period before [F2IP completion day], a downstream user under EU REACH established in [F3Great Britain] in relation to a substance on its own, in a mixture or in an article;

relevant supplier” has the meaning given in paragraph 2(d)(i);

[F1GB] user or distributor” has the meaning given in paragraph 1(a).]

[F20Article 127EAU.K.Appointment of only representative where Article 127E applies

1.  This Article applies in relation to a protected transitional import of a substance by a [F1GB] user or distributor (within the meaning of Article 127E) [F21that is not a protected NI import].

2.  If, or to the extent that, the appointment of an only representative by the manufacturer, formulator or producer relates to the substance as imported, Article 8 has effect as if the following provision were substituted for paragraphs 1 to 3 of that Article—

1.  A person established outside [F3Great Britain] who manufactures a substance on its own, in mixtures or in articles, formulates a mixture or produces an article that is imported into [F3Great Britain] may by mutual agreement appoint a person established in [F3Great Britain] to fulfil, as his only representative, the obligations on the [F1GB] user or distributor under Article 127E.

[F221A.  Article 36 applies to the representative.]

2.  The representative must have a sufficient background in the practical handling of substances and the information related to them and, without prejudice to Article 36, must keep available and up-to-date information on quantities imported and customers sold to, as well as information on the supply of the latest update of the safety data sheet referred to in Article 31.

3.  If a representative is appointed in accordance with paragraphs 1 and 2, the [F23non-Great British] manufacturer shall inform the [F1GB] user or distributor of the appointment..

3.  If the [F1GB] user or distributor is informed of the appointment of the only representative in accordance with paragraph 3 of Article 8 (as set out above), paragraphs 7, 8 and 9 of Article 127E cease to apply to the [F1GB] user or distributor as respects any protected transitional import where the manufacturer, formulator or producer is the person who appointed the representative.]

[F24Article 127EBU.K.Import from Northern Ireland where Article 127E applies

1.  This Article applies in relation to a protected transitional import of a substance by a GB user or distributor (within the meaning of Article 127E) that is also a protected NI import.

2.  A person established in Northern Ireland who manufactures a substance on its own, in mixtures or in articles, formulates a mixture, or produces an article that is imported into Great Britain may fulfil the obligations on the GB user or distributor under Article 127E (the “NI notifier”).

3.  Article 36 applies to the NI notifier.

4.  The NI notifier must, without prejudice to Article 36, keep available and up-to-date information on quantities imported and customers sold to, as well as information on the supply of the latest update of the safety data sheet referred to in Article 31.

5.  A person who intends to act in accordance with paragraph 2 must inform the GB user or distributor that they intend to do so.

6.  If the GB user or distributor is informed of the intention in accordance with paragraph 5, paragraphs 7 to 9 of Article 127E apply to the NI notifier instead of the GB user or distributor as respects any protected transitional import from the NI notifier.]

Article 127FU.K.Existing EU authorisations

1.  The holder of an existing EU authorisation which has the relevant connection with [F3Great Britain] must, before the end of the 60 day [F6post-IP completion] period, supply the Agency with the required technical information relating to the authorisation.

2.  An existing EU authorisation which does not have the relevant connection with [F3Great Britain] ceases to have effect (as retained EU law) on [F2IP completion day].

3.  An existing EU authorisation has the relevant connection with [F3Great Britain] if the holder of the authorisation is established in [F3Great Britain].

4.  In this Article—

existing EU authorisation” means an authorisation granted in accordance with Articles 60 to 64 of EU REACH which is subsisting immediately before [F2IP completion day];

holder”, in relation to an existing EU authorisation, means the person to whom the authorisation has been granted;

required technical information”, in relation to an existing EU authorisation, means—

(a)the information included in the application for the authorisation in accordance with Article 62(4) and (5) of EU REACH,

(b)any other information provided to ECHA by the applicant for the authorisation which was material to the formation of ECHA's opinion in relation to the application for the authorisation, and

(c)any information required to be submitted or recorded before [F2IP completion day] under any condition under which the authorisation is granted.

Article 127GU.K.Existing applications for EU authorisations

1.  The Secretary of State must decide an existing application for an EU authorisation (as mentioned in Article 64(8)) if—

(a)the application—

(i)is at the final decision stage on [F2IP completion day],

(ii)has the relevant connection with [F3Great Britain]; and

(b)the person who made the application—

(i)notifies the Secretary of State of the existence of the application,

(ii)provides the Secretary of State with copies of the application, the information included in it under Article 62(4) and (5) of EU REACH, and any other information provided to ECHA by the applicant for the authorisation which was material to the formation of ECHA's opinion in relation to the application for the authorisation, and

(iii)provides the Secretary of State with copies of the final opinions of ECHA referred to in Article 64(5) of EU REACH.

2.  An application for an EU authorisation is at the final decision stage if—

(a)ECHA has adopted the final opinions referred to in Article 64(5) of EU REACH, but

(b)the Commission has not made a final decision granting or refusing the application.

3.  An application for an EU authorisation has the relevant connection with [F3Great Britain] if the person making the application is established in [F3Great Britain].

4.  The period of six months for the Secretary of State to make an authorisation decision in accordance with Article 64(8) of this Regulation begins with the day on which paragraph 1(b) is complied with.

5.  Where, immediately before [F2IP completion day], a person may place a substance on the market for a use or use it himself in reliance on Article 56(1)(d) of EU REACH, the person may continue to do so on and after [F2IP completion day] in reliance on Article 56(1)(d) of this Regulation.

But this paragraph ceases to apply at the end of the 180 day [F6post-IP completion] period if the person does not comply with paragraph 1(b) of this Article before the end of that period.

6.  In this Article “existing application for an EU authorisation” means an application made before [F2IP completion day] for the grant of an authorisation in accordance with Articles 60 to 64 of EU REACH.

[F25Article 127GAU.K.Substances of very high concern: sunset dates and latest application dates

1.  Paragraphs 2 and 3 apply where—

(a)immediately before [F2IP completion day], a substance is included in Annex 14 to EU REACH;

(b)the EU latest application date fell before or during the relevant [F9pre-IP completion] period;

(c)the EU sunset date fell during the relevant [F9pre-IP completion] period;

(d)before the EU latest application date, an application had been made for the grant of an authorisation in accordance with Articles 60 to 64 of EU REACH in relation to the substance (the “authorisation application”); and

(e)immediately before [F2IP completion day], the authorisation application was still under consideration (see paragraph 11).

2.  Where, immediately before [F2IP completion day], a person established in [F3Great Britain] may place the substance on the market or use it himself in reliance on Article 56(1)(d) of EU REACH by virtue of the authorisation application having been made, this Regulation has effect subject to the modifications set out in paragraph 3.

3.  As respects that person placing the substance on the market or using it himself on and after [F2IP completion day]

(a)the [F1GB] latest application date, and

(b)the [F1GB] sunset date,

both fall on the transitional cut-off date (rather than on the dates specified in Annex 14 for that substance).

4.  Paragraphs 5 and 6 apply where—

(a)immediately before [F2IP completion day], a substance is included in Annex 14 to EU REACH;

(b)the EU latest application date fell during the relevant [F9pre-IP completion] period;

(c)the EU sunset date falls after the end of that period;

(d)before the EU latest application date, an application had been made for the grant of an authorisation in accordance with Articles 60 to 64 of EU REACH in relation to the substance (the “authorisation application”); and

(e)immediately before [F2IP completion day], the authorisation application was still under consideration (see paragraph 11).

5.  Where, on and after the [F1GB] sunset date, a person established in [F3Great Britain] would be able to place the substance on the market or use it himself in reliance on Article 56(1)(d) of this Regulation had the authorisation application been made under this Regulation, this Regulation has effect subject to the modifications set out in paragraph 6.

6.  As respects that person placing the substance on the market or using it himself on and after [F2IP completion day]

(a)the [F1GB] latest application date, and

(b)the [F1GB] sunset date,

both fall on the transitional cut-off date (rather than on the dates specified in Annex 14 for that substance).

The effect of this paragraph is to be ignored in reading the reference to the [F1GB] sunset date in paragraph 5.

7.  Paragraph 8 applies where—

(a)immediately before [F2IP completion day], a substance is included in Annex 14 to EU REACH; and

(b)the [F1GB] latest application date falls during the 18 month [F6post-IP completion] period.

8.  As respects a person established in [F3Great Britain] placing the substance on the market or using it himself on and after [F2IP completion day], the [F1GB] latest application date falls on the transitional cut-off date (rather than on the date specified in Annex 14 for that substance).

9.  Where paragraph 3, 6 or 8 modifies this Regulation, Article 56(1) has effect with the following provision substituted for point (d)—

(d)the [F1GB] sunset date (within the meaning of Article 127GA) has been reached and he made an application before the [F1GB] latest application date (within the meaning of Article 127GA) but a decision on the application for authorisation has not yet been taken; or.

10.  Where paragraph 3 or 6 modifies the date that is the [F1GB] sunset date, any reference in this Regulation to the date of the kind referred to in Article 58(1)(c)(i) has effect subject to the modification made by paragraph 3 or 6.

11.  For the purposes of paragraph 1(e) or 4(e), the authorisation application is “still under consideration” unless—

(a)the Commission has made a final decision granting or refusing the authorisation application, or

(b)the authorisation application—

(i)has the relevant connection with [F3Great Britain] (within the meaning of Article 127G), and

(ii)is at the final decision stage (within the meaning of Article 127G).

12.  In this Article—

EU latest application date”, in relation to a substance, means the date of the kind referred to in Article 58(1)(c)(ii) of EU REACH that is specified in Annex 14 to EU REACH in relation to the substance;

EU sunset date”, in relation to a substance, means the date of the kind referred to in Article 58(1)(c)(i) of EU REACH that is specified in Annex 14 to EU REACH in relation to the substance;

relevant [F9pre-IP completion] period” means the period that—

(a)begins with 29 March 2017, and

(b)ends immediately before [F2IP completion day];

transitional cut-off date” means the last day of the 18 month [F6post-IP completion] period;

[F1GB] latest application date”, in relation to a substance, means the date of the kind referred to in Article 58(1)(c)(ii) of this Regulation that is specified in Annex 14 to this Regulation in relation to the substance;

[F1GB] sunset date”, in relation to a substance, means the date of the kind referred to in Article 58(1)(c)(i) of this Regulation that is specified in Annex 14 to this Regulation in relation to the substance;

18 month [F6post-IP completion] period” means the period of 18 months beginning with the day after that on which [F2IP completion day] falls.]

Article 127HU.K.Existing authorised downstream users under EU law

1.  On and after [F2IP completion day], a person who—

(a)is established in [F3Great Britain], and

(b)is an existing authorised downstream user under EU law in relation to a substance,

is authorised to use that substance in accordance with Article 56(2).

2.  Where Article 56(2) applies to the use of a substance by virtue of paragraph 1, a reference in Article 56(2) to an authorisation granted to a person up a supply chain is a reference to an existing EU authorisation relating to that use of the substance.

3.  Accordingly, paragraph 1 ceases to apply to a person if the existing EU authorisation relating to that use of the substance ceases to have effect.

4.  A person to whom paragraph 1 applies must, before the end of the 60 day [F6post-IP completion] period—

(a)confirm to the Agency that they are an existing authorised downstream user under EU law in relation to the substance, and

(b)notify the Agency of—

(i)the existing EU authorisation;

(ii)any conditions set out in the existing EU authorisation (as referred to in Article 56(2) of EU REACH);

(iii)the identity of the supplier of the substance to the person.

5.  Article 66(1) does not apply to the use of a substance in accordance with Article 56(2) by virtue of this Article.

6.  In this Article—

existing authorised downstream user under EU law” means a person who, immediately before [F2IP completion day], is authorised to use a substance in accordance with Article 56(2) of EU REACH;

existing EU authorisation” means an authorisation granted to a person up a supply chain (as referred to in Article 56(2) of EU REACH) which is subsisting immediately before [F2IP completion day], as it has effect in EU law;

Article 127IU.K.Existing examinations of testing proposals

1.  On and after [F2IP completion day], an existing EU decision on a testing proposal which has the relevant connection with [F3Great Britain] has effect as a decision by the Agency under Article 40(3) of this Regulation.

2.  An existing EU decision on a testing proposal has the relevant connection with [F3Great Britain] if the registrant, or downstream user, concerned is established in [F3Great Britain].

3.  The Agency may extend any deadline specified in an existing EU decision on a testing proposal.

4.  In this Article, “existing EU decision on a testing proposal” means a decision taken by ECHA—

(a)in accordance with Article 40(3)(a), (b), (c) or (e) of EU REACH, if the requirements of the decision have not been fulfilled, or

(b)in accordance with Article 40(3)(d) of EU REACH.

Article 127JU.K.Existing Article 7(2) notifications

1.  This Article applies if—

(a)before [F2IP completion day], a producer of articles established in [F3Great Britain], or an importer of articles established in [F3Great Britain], has given ECHA a notification under Article 7(2) of EU REACH in relation to a substance, and

(b)immediately before [F2IP completion day], that person is not a registrant in relation to the substance concerned.

2.  The person that gave the notification to ECHA must submit to the Agency, within the 60 day [F6post-IP completion] period, the information notified to ECHA in accordance with Article 7(2) and (4) of EU REACH.

Article 127KU.K.Existing Article 9 exemptions

1.  This Article applies if—

(a)a five year exemption under Article 9(1) of EU REACH, or

(b)an extended exemption under Article 9(7) of EU REACH,

applies in relation to a substance immediately before [F2IP completion day] where the research and development concerned takes place in [F3Great Britain].

2.  On and after [F2IP completion day]

(a)a five year exemption under Article 9(1) of this Regulation, or,

(b)an extended exemption under Article 9(7) of this Regulation,

(as the case may be) applies in relation to the substance, subject to the same conditions (if any) imposed by ECHA under Article 9(4) in relation to the corresponding exemption under EU REACH.

3.  That exemption under Article 9(1) or (7) of this Regulation is to end on the same date that the corresponding exemption under EU REACH would have ended.

4.  Where an exemption under Article 9(1) or (7) of this Regulation applies to a substance by virtue of this Article, the following duties must be complied with in relation to the exemption of the substance within the 120 day [F6post-IP completion] period—

(a)Article 9(2) must be complied with by the manufacturer or importer or producer, as the case may be (the “notifier”);

(b)the notifier must also notify the Agency of the number and notification date assigned by ECHA under Article 9(3) of EU REACH;

(c)the notifier must give the Agency copies of any additional necessary information given to ECHA under Article 9(4) of EU REACH.

Where the notifier complies with Article 9(2) in accordance with this paragraph, no fee is payable under Article 9(2).

Article 127LU.K.Existing Article 17 registrations

1.  This Article applies if a registration with ECHA under Article 17 of EU REACH which relates to an on-site isolated intermediate that is manufactured in [F3Great Britain] is—

(a)subsisting immediately before [F2IP completion day], and

(b)either—

(i)has a current connection with [F3Great Britain], or

(ii)has a relevant past connection with [F3Great Britain] (but does not have a current connection with [F3Great Britain]).

2.  On and after [F2IP completion day], the registration has effect as a registration with the Agency under Article 17 of this Regulation.

3.  Where paragraph 2 operates on a registration the manufacturer concerned must give the Agency—

(a)the information referred to in Article 17(2)(a), (b), (e) and (f) and the confirmation referred to in Article 17(3), within the 120 day [F6post-IP completion] period, and

(b)the information referred to in Article 17(2)(c) and (d) within the [F26relevant] [F6post-IP completion] period.

4.  Article 19(1) does not apply to the giving of information in accordance with paragraph 3 of this Article.

5.  The manufacturer concerned must submit the registration number and registration date assigned to the existing EU registration by ECHA in accordance with Article 20(3) of EU REACH, and such other evidence as the Agency may require of the existing EU registration, to the Agency within the 120 day [F6post-IP completion] period.

6.  Where paragraph 2 operates on a registration, the other Titles of this Regulation apply to that registration as they would apply to the registration if it had been submitted to the Agency under Article 17 on [F2IP completion day], but with the modifications set out in the following provisions of this Article.

7.  No fee is payable under Article 17(2).

8.  Article 20 has effect with the following provision substituted for paragraphs 1 to 3—

1.  The Agency must assign a submission date to each registration which has effect under Article 127L, which must be the date on which the registrant complies with paragraph 3(a) or (b) of Article 127L.

2.  The Agency may undertake a completeness check of each registration in order to ascertain that all the elements required under Article 17 have been provided. The completeness check must not include an assessment of the quality or the adequacy of any data or justifications submitted.

If a registration is incomplete, the Agency must inform the registrant as to what further information is required in order for the registration to be complete, while setting a reasonable deadline for this. The registrant must complete his registration and submit it to the Agency within the deadline set. The Agency must confirm the submission date of the further information to the registrant. The Agency must perform a further completeness check, considering the further information submitted.

3.  Once the registrant has complied with paragraph 3(a) of Article 127L, the Agency must assign a registration number to the substance concerned and a registration date, which must be the same as the registration date for the existing EU registration..

9.  Article 21 has effect with the following provision substituted for the first subparagraph of paragraph 1—

1.  A registrant may continue the manufacture of a substance from [F2IP completion day], subject to any indication to the contrary from the Agency in accordance with Article 20(2)..

Article 127MU.K.Existing Article 18 registrations

1.  This Article applies if a registration with ECHA under Article 18 of EU REACH which relates to a transported isolated intermediate that is manufactured in or imported into [F3Great Britain] is—

(a)subsisting immediately before [F2IP completion day], and

(b)either—

(i)has a current connection with [F3Great Britain], or

(ii)has a relevant past connection with [F3Great Britain] (but does not have a current connection with [F3Great Britain]).

2.  On and after [F2IP completion day], the registration has effect as a registration with the Agency under Article 18 of this Regulation.

3.  Where paragraph 2 operates on a registration, the manufacturer or importer concerned must give the Agency—

(a)the information referred to in Article 18(2)(a), (b), (e) and (f) and the confirmation referred to in Article 18(4), within the 120 day [F6post-IP completion] period, and

(b)the information referred to in Article 18(2)(c) and (d) and 18(3) within the [F27relevant] [F6post-IP completion] period.

4.  Article 19(1) does not apply to the giving of information in accordance with paragraph 3 of this Article.

5.  The manufacturer or importer concerned must submit the registration number and registration date assigned to the existing EU registration by ECHA in accordance with Article 20(3) of EU REACH, and such other evidence as the Agency may require of the existing EU registration, to the Agency within the 120 day [F6post-IP completion] period.

6.  Where paragraph 2 operates on a registration, the other Titles of this Regulation apply to that registration as they would apply to the registration if it had been submitted to the Agency under Article 18 on [F2IP completion day], but with the modifications set out in the following provisions of this Article.

7.  No fee is payable under Article 18(2).

8.  Article 20 has effect with the following provision substituted for paragraphs 1 to 3—

1.  The Agency must assign a submission date to each registration which has effect under Article 127M, which must be the date on which the registrant complies with paragraph 3(a) or (b) of Article 127M.

2.  The Agency may undertake a completeness check of each registration in order to ascertain that all the elements required under Article 18 have been provided. The completeness check must not include an assessment of the quality or the adequacy of any data or justifications submitted.

If a registration is incomplete, the Agency must inform the registrant as to what further information is required in order for the registration to be complete, while setting a reasonable deadline for this. The registrant must complete his registration and submit it to the Agency within the deadline set. The Agency must confirm the submission date of the further information to the registrant. The Agency must perform a further completeness check, considering the further information submitted.

3.  Once the registrant has complied with paragraph 3(a) of Article 127M, the Agency must assign a registration number to the substance concerned and a registration date, which must be the same as the registration date for the existing EU registration..

9.  Article 21 has effect with the following provision substituted for the first subparagraph of paragraph 1—

1.  A registrant may continue the manufacture or import of a substance from [F2IP completion day], subject to any indication to the contrary from the Agency in accordance with Article 20(2)..

Article 127NU.K.Registrations under Article 127L and Article 127M

1.  Articles 127L and 127M are to be read in accordance with paragraphs 2 to 5.

2.  A registration under Article 17 or 18 of EU REACH (as the case may be) has a current connection with [F3Great Britain] if—

(a)the registrant immediately before [F2IP completion day] is a person established in [F3Great Britain] (a “current [F1GB] registrant”), and

(b)a registration of the substance concerned by the current [F1GB] registrant is a registration of a kind that could be submitted on [F2IP completion day] under Article 17 or 18 (as the case may be) of this Regulation.

3.  A registration under Article 17 or 18 of EU REACH (as the case may be) has a relevant past connection with [F3Great Britain] if—

(a)the registrant at any time [F28in the period beginning with 29 March 2017 and ending immediately] before [F2IP completion day] was a person established in [F3Great Britain] (a “former [F1GB] registrant”), and

(b)a registration of the substance concerned by the former [F1GB] registrant is a registration of a kind that could be submitted on [F2IP completion day]

(i)under Article 17 of this Regulation if the former [F1GB] registrant was the manufacturer of the on-site intermediate concerned on [F2IP completion day], or

(ii)under Article 18 of this Regulation if the former [F1GB] registrant was the manufacturer or importer of the transported isolated intermediate concerned on [F2IP completion day].

4.  Where a registration that has a current connection with [F3Great Britain] has effect as a registration with the Agency by virtue of Article 127L or 127M, the current [F1GB] registrant becomes the registrant in relation to the registration with the Agency on [F2IP completion day].

5.  Where a registration that has a relevant past connection with [F3Great Britain] has effect as a registration with the Agency by virtue of Article 127L or 127M, the former [F1GB] registrant becomes the registrant in relation to the registration with the Agency on [F2IP completion day].

If two or more persons have been former [F1GB] registrants at different times [F29in the period beginning with 29 March 2017 and ending immediately] before [F2IP completion day], only the person who was the former [F1GB] registrant most recently before [F2IP completion day] is to become the registrant in relation to the registration with the Agency by virtue of this paragraph.

Article 127OU.K.Obligation to keep information

1.  This Article applies to a person established in [F3Great Britain] who, immediately before [F2IP completion day], is, as respects any information, bound by the obligation imposed by Article 36(1) of EU REACH.

2.  On and after [F2IP completion day], the person is, as respects the information concerned, bound by the obligation imposed by Article 36(1) of this Regulation.

3.  Where paragraph 2 applies to a person, the person is not bound by the obligation imposed by Article 36(1) of this Regulation after the end of a 10 year period under Article 36(1) of EU REACH that was running at [F2IP completion day] (and the reference to the 10 year period in Article 36(1) of this Regulation is accordingly to be read as a reference to the remainder of the 10 year period under EU REACH that falls after [F2IP completion day]).

Article 127PU.K. [F30Post-IP completion periods] used in this Title

In this Title—

(1) 60 day [F6post-IP completion] period” means the period of 60 days beginning with the day after that on which [F2IP completion day] falls;

(2) 90 day [F6post-IP completion] period” means the period of 90 days beginning with the day after that on which [F2IP completion day] falls;

(3) 120 day [F6post-IP completion] period” means the period of 120 days beginning with the day after that on which [F2IP completion day] falls;

(4) 180 day [F6post-IP completion] period” means the period of 180 days beginning with the day after that on which [F2IP completion day] falls;

[F31(4A) “300 day post-IP completion period” means the period of 300 days beginning with the day after that on which IP completion day falls;

(4B) “relevant post-IP completion period” means the period beginning with the day after that on which IP completion day falls and ending—

(a)two years after the end of the 300 day post-IP completion period in respect of—

(i)substances included on the candidate list by virtue of Article 59(1A),

(ii)substances classified as carcinogenic, mutagenic or toxic to reproduction, category 1A or 1B, in accordance with Regulation (EC) No 1272/2008 and manufactured in Great Britain or imported, in quantities reaching one tonne or more per year per manufacturer or importer, at least once after IP completion day,

(iii)substances classified as aquatic chronic category 1 (very toxic to aquatic life with long lasting effects) or aquatic acute category 1 (very toxic to aquatic life) in accordance with Regulation (EC) No 1272/2008 and manufactured in Great Britain or imported, in quantities reaching 100 tonnes or more per year per manufacturer or importer, at least once after IP completion day,

(iv)substances manufactured in Great Britain or imported, in quantities reaching 1,000 tonnes or more per year per manufacturer or importer, at least once after IP completion day,

(b)four years after the end of the 300 day post-IP completion period in respect of—

(i)substances added to the candidate list referred to in Article 59(1), other than by virtue of Article 59(1A), before the end of the period referred to in subparagraph (a),

(ii)substances manufactured in Great Britain or imported, in quantities reaching 100 tonnes or more per year per manufacturer or importer, at least once after IP completion day,

(c)six years after the end of the 300 day post-IP completion period in respect of substances manufactured in Great Britain or imported, in quantities reaching 1 tonne or more per year per manufacturer or importer, at least once after IP completion day.]

F32(5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F33(6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..

Textual Amendments

F1Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(3)

F2Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The Environment (Miscellaneous Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1313), regs. 1(3), 6(2)

F3Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(2)

F4Words in Sch. 2 substituted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 3) Regulations 2019 (S.I. 2019/1144), regs. 1, 4(2)(a) (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2))

F5Words in Sch. 2 substituted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 3) Regulations 2019 (S.I. 2019/1144), regs. 1, 4(2)(b) (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2))

F6Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The Environment (Miscellaneous Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1313), regs. 1(3), 6(3)(a)

F7Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(4)

F8Words in Sch. 2 substituted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 2) Regulations 2019 (S.I. 2019/858), regs. 1, 4(2) (as amended by S.I. 2020/1577, regs. 1(1)(a), 12(2))

F9Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The Environment (Miscellaneous Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1313), regs. 1(3), 6(3)(b)

F10Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(a)

F11Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(b)

F12Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(c)(i)

F13Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(c)(ii)

F14Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(c)(iii)

F15Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(d)(i)

F16Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(d)(ii)

F17Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(d)(iii)

F18Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(e)

F19Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(5)(f)

F20Words in Sch. 2 inserted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 2) Regulations 2019 (S.I. 2019/858), regs. 1, 4(3) (as amended by S.I. 2020/1577, regs. 1(1)(a), 12(2))

F21Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(6)(a)

F22Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(6)(b)(i)

F23Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(6)(b)(ii)

F24Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(7)

F25Words in Sch. 2 inserted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 3) Regulations 2019 (S.I. 2019/1144), regs. 1, 4(3) (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2))

F26Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(8)

F27Word in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(9)

F28Words in Sch. 2 substituted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 3) Regulations 2019 (S.I. 2019/1144), regs. 1, 4(4)(a) (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2))

F29Words in Sch. 2 substituted (31.12.2020 immediately before S.I. 2020/1577, Pt. 2 comes into force) by The REACH etc. (Amendment etc.) (EU Exit) (No. 3) Regulations 2019 (S.I. 2019/1144), regs. 1, 4(4)(b) (as amended by S.I. 2020/1577, regs. 1(1)(a), 13(2))

F30Words in Sch. 2 substituted (31.12.2020 immediately before IP completion day) by The Environment (Miscellaneous Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1313), regs. 1(3), 6(3)(c)(i)

F31Words in Sch. 2 inserted (31.12.2020 immediately before IP completion day) by The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(10)(a)

F32Words in Sch. 2 omitted (31.12.2020 immediately before IP completion day) by virtue of The Environment (Miscellaneous Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1313), regs. 1(3), 6(3)(c)(ii)

F33Words in Sch. 2 omitted (31.12.2020 immediately before IP completion day) by virtue of The REACH etc. (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1577), regs. 1(1)(b), 5(10)(b)

Commencement Information

I1Sch. 2 para. 1 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1(1)

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources