- Latest available (Revised)
- Original (As made)
There are currently no known outstanding effects for the The Silvertown Tunnel Order 2018, PART 3 .
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Borough (1) | Road name, number and length (2) | Measures (3) |
---|---|---|
The traffic regulation measures (clearways and prohibitions) plans, sheet 1 | ||
Royal Borough of Greenwich | Pavilion Way (Realigned) A length of new highway from a point on the existing A102 Blackwall Tunnel southern approach Southbound 130 metres south of the existing Blackwall Tunnel Southbound South Portal, in a generally southerly direction then turning eastwards to its junction with the northbound carriageway of the existing Millennium Way, for a distance of 150 metres, and a length of new highway from a point on the northbound carriageway of the existing Millennium Way 75 metres to the north west of its junction with the existing Edmund Halley Way, in a generally southerly direction to its junction with the Silvertown Tunnel southern approach Northbound, for a distance of 215 metres. | New prescribed route Prohibition of entry (no entry at any time except by buses) |
Silvertown Tunnel southern approach Southbound The nearside lane of a length of new highway from the south portal of the Silvertown Tunnel Southbound, in a generally south easterly direction, for a distance of 20 metres. | New prescribed route Prohibition of entry in the nearside lane (no entry at any time with the exception of buses, taxis and goods vehicles in excess of 7.5 tonnes) | |
Silvertown Tunnel southern approach Northbound The nearside lane of a length of new highway from a point 50 metres south of the south portal of the Silvertown Tunnel northbound, in a generally northerly direction to the south portal of the Silvertown Tunnel northbound. | New prescribed route Prohibition of entry in the nearside lane (no entry at any time with the exception of buses, taxis and goods vehicles in excess of 7.5 tonnes) | |
A102 Blackwall Tunnel southern approach Northbound On-Slip A length of new highway from its junction with A102 Blackwall Tunnel southern approach northbound carriageway 70 metres south of Blackwall Tunnel Gatehouse, to its junction with Tunnel Avenue. | New prescribed route Prohibition of entry (no entry at any time except by buses) | |
The traffic regulation measures (clearways and prohibitions) plans, sheets 1 and 2 | ||
Royal Borough of Greenwich | Silvertown Tunnel A length of new highway (tunnel) from the Borough boundary between Royal Borough of Greenwich and London Borough of Newham at the centre of the river Thames to the south portal of the Silvertown Tunnel southern approach along the nearside lane of the northbound and southbound carriageways. | New prescribed route Prohibition of entry in the nearside lane (no entry at any time with the exception of buses, taxis and goods vehicles in excess of 7.5 tonnes) |
The traffic regulation measures (clearways and prohibitions) plans, sheets 2 and 3 | ||
London Borough of Newham | Silvertown Tunnel A length of new highway (tunnel) from the Borough boundary between Royal Borough of Greenwich and London Borough of Newham at the centre of the river Thames to the north portal of the Silvertown Tunnel northern approach along the nearside lane of the northbound and southbound carriageways. | New prescribed route Prohibition of entry in the nearside lane (no entry at any time with the exception of buses, taxis and goods vehicles in excess of 7.5 tonnes) |
The traffic regulation measures (clearways and prohibitions) plans, sheet 3 | ||
London Borough of Newham | Silvertown Tunnel northern approach Northbound and Southbound A length of new highway from the north portal of the Silvertown Tunnel, in a generally northerly direction, for a distance of 10 metres along the nearside lane of the northbound and southbound carriageways. | New prescribed route Prohibition of entry in the nearside lane (no entry at any time) with the exception of buses, taxis and goods vehicles in excess of 7.5 tonnes |
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: