Search Legislation

The Pressure Equipment (Safety) Regulations 2016

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Paragraph 31

 Help about opening options

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Pressure Equipment (Safety) Regulations 2016. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 2 Paragraph 31:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

This section has no associated Explanatory Memorandum

31.—(1) Materials used for the manufacture of pressure equipment must be suitable for such application during the scheduled lifetime unless replacement is foreseen.E+W+S

(2) Welding consumables and other joining materials need only comply with the relevant requirements of subparagraphs (3), (4)(a) and (5), in an appropriate way, both individually and in a joined structure.

(3) Materials for pressurised parts must—

(a)have appropriate properties for all operating conditions which are reasonably foreseeable and for all test conditions, and in particular—

(i)they must be sufficiently ductile and tough;

(ii)where appropriate, the characteristics of the materials must comply with the requirements of paragraph 41;

(iii)due care must be exercised in particular in selecting materials in order to prevent brittle-type fracture where necessary;

(iv)where for specific reasons brittle material has to be used, appropriate measures must be taken;

(b)be sufficiently chemically resistant to the fluid contained in the pressure equipment, and in particular the chemical and physical properties necessary for operational safety must not be significantly affected within the scheduled lifetime of the equipment;

(c)not be significantly affected by ageing;

(d)be suitable for the intended processing procedures;

(e)be selected in order to avoid significant undesirable effects when the various materials are put together.

(4) The pressure equipment manufacturer must—

(a)define in an appropriate manner the values necessary for the design calculations referred to in paragraph 5 and the essential characteristics of the materials and their treatment referred to in subparagraph (3);

(b)provide in the technical documentation elements relating to compliance with the materials specifications relating to materials contained in these Regulations in one of the following forms—

(i)by using materials which comply with [F1designated] standards;

F2(ii). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(iii)by a particular material appraisal.

(5) For pressure equipment in categories III and IV, a specific assessment of the particular material appraisal must be performed by the [F3approved] body in charge of conformity assessment procedures for the pressure equipment.

(6) The equipment manufacturer must take appropriate measures to ensure that the material used conforms with the required specification, and in particular, documentation prepared by the material manufacturer affirming compliance with a specification must be obtained for all materials.

(7) For the main pressure-bearing parts of equipment in categories II, III and IV, the documentation referred to in sub-paragraph (6) must take the form of a certificate of specific product control.

(8) Where a material manufacturer has an appropriate quality-assurance system, certified by a competent body established [F4in the United Kingdom] and having undergone a specific assessment for materials, certificates issued by the manufacturer are presumed to certify conformity with the relevant requirements of this paragraph.

Extent Information

E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

31.—(1) Materials used for the manufacture of pressure equipment must be suitable for such application during the scheduled lifetime unless replacement is foreseen.N.I.

(2) Welding consumables and other joining materials need only comply with the relevant requirements of subparagraphs (3), (4)(a) and (5), in an appropriate way, both individually and in a joined structure.

(3) Materials for pressurised parts must—

(a)have appropriate properties for all operating conditions which are reasonably foreseeable and for all test conditions, and in particular—

(i)they must be sufficiently ductile and tough;

(ii)where appropriate, the characteristics of the materials must comply with the requirements of paragraph 41;

(iii)due care must be exercised in particular in selecting materials in order to prevent brittle-type fracture where necessary;

(iv)where for specific reasons brittle material has to be used, appropriate measures must be taken;

(b)be sufficiently chemically resistant to the fluid contained in the pressure equipment, and in particular the chemical and physical properties necessary for operational safety must not be significantly affected within the scheduled lifetime of the equipment;

(c)not be significantly affected by ageing;

(d)be suitable for the intended processing procedures;

(e)be selected in order to avoid significant undesirable effects when the various materials are put together.

(4) The pressure equipment manufacturer must—

(a)define in an appropriate manner the values necessary for the design calculations referred to in paragraph 5 and the essential characteristics of the materials and their treatment referred to in subparagraph (3);

(b)provide in the technical documentation elements relating to compliance with the materials specifications relating to materials contained in these Regulations in one of the following forms—

(i)by using materials which comply with harmonised standards;

(ii)by using materials covered by a European approval for materials in accordance with regulation 50;

(iii)by a particular material appraisal.

(5) For pressure equipment in categories III and IV, a specific assessment of the particular material appraisal must be performed by the notified body in charge of conformity assessment procedures for the pressure equipment.

(6) The equipment manufacturer must take appropriate measures to ensure that the material used conforms with the required specification, and in particular, documentation prepared by the material manufacturer affirming compliance with a specification must be obtained for all materials.

(7) For the main pressure-bearing parts of equipment in categories II, III and IV, the documentation referred to in sub-paragraph (6) must take the form of a certificate of specific product control.

(8) Where a material manufacturer has an appropriate quality-assurance system, certified by a competent body established [F5in a relevant state] and having undergone a specific assessment for materials, certificates issued by the manufacturer are presumed to certify conformity with the relevant requirements of this paragraph.

Extent Information

E2This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Textual Amendments

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources