Class A – agricultural development on units of 5 hectares or more

Permitted development

A.  The carrying out on agricultural land comprised in an agricultural unit of 5 hectares or more in area of—

(a)works for the erection, extension or alteration of a building; or

(b)any excavation or engineering operations,

which are reasonably necessary for the purposes of agriculture within that unit.

Development not permitted

A.1  Development is not permitted by Class A if—

(a)the development would be carried out on a separate parcel of land forming part of the unit which is less than 1 hectare in area;

(b)it would consist of the erection or extension of any agricultural building on an established agricultural unit (as defined in paragraph X of Part 3 of this Schedule) where development under Class Q or S of Part 3 (changes of use) of this Schedule has been carried out within a period of 10 years ending with the date on which development under Class A(a) begins;

(c)it would consist of, or include, the erection, extension or alteration of a dwelling;

(d)it would involve the provision of a building, structure or works not designed for agricultural purposes;

(e)the ground area which would be covered by—

(i)any works or structure (other than a fence) for accommodating livestock or any plant or machinery arising from engineering operations; or

(ii)any building erected or extended or altered by virtue of Class A,

would exceed 465 square metres, calculated as described in paragraph D.1(2)(a) of this Part;

(f)the height of any part of any building, structure or works within 3 kilometres of the perimeter of an aerodrome would exceed 3 metres;

(g)the height of any part of any building, structure or works not within 3 kilometres of the perimeter of an aerodrome would exceed 12 metres;

(h)any part of the development would be within 25 metres of a metalled part of a trunk road or classified road;

(i)it would consist of, or include, the erection or construction of, or the carrying out of any works to, a building, structure or an excavation used or to be used for the accommodation of livestock or for the storage of slurry or sewage sludge where the building, structure or excavation is, or would be, within 400 metres of the curtilage of a protected building;

(j)it would involve excavations or engineering operations on or over article 2(4) land which are connected with fish farming; or

(k)any building for storing fuel for or waste from a biomass boiler or an anaerobic digestion system—

(i)would be used for storing waste not produced by that boiler or system or for storing fuel not produced on land within the unit; or

(ii)is or would be within 400 metres of the curtilage of a protected building.

Conditions

A.2—(1) Development is permitted by Class A subject to the following conditions—

(a)where development is carried out within 400 metres of the curtilage of a protected building, any building, structure, excavation or works resulting from the development are not used for the accommodation of livestock except in the circumstances described in paragraph D.1(3) of this Part or for the storage of slurry or sewage sludge, for housing a biomass boiler or an anaerobic digestion system, for storage of fuel or waste from that boiler or system, or for housing a hydro-turbine;

(b)where the development involves—

(i)the extraction of any mineral from the land (including removal from any disused railway embankment); or

(ii)the removal of any mineral from a mineral-working deposit,

the mineral is not moved off the unit;

(c)waste materials are not brought on to the land from elsewhere for deposit except for use in works described in Class A(a) or in the provision of a hard surface and any materials so brought are incorporated forthwith into the building or works in question.

(2) Subject to sub-paragraph (3), development consisting of—

(a)the erection, extension or alteration of a building;

(b)the formation or alteration of a private way;

(c)the carrying out of excavations or the deposit of waste material (where the relevant area, as defined in paragraph D.1(4) of this Part, exceeds 0.5 hectares); or

(d)the placing or assembly of a tank in any waters,

is permitted by Class A subject to the following conditions—

(i)the developer must, before beginning the development, apply to the local planning authority for a determination as to whether the prior approval of the authority will be required as to the siting, design and external appearance of the building, the siting and means of construction of the private way, the siting of the excavation or deposit or the siting and appearance of the tank, as the case may be;

(ii)the application must be accompanied by a written description of the proposed development and of the materials to be used and a plan indicating the site together with any fee required to be paid;

(iii)the development must not begin before the occurrence of one of the following—

(aa)the receipt by the applicant from the local planning authority of a written notice of their determination that such prior approval is not required;

(bb)where the local planning authority give the applicant notice within 28 days following the date of receiving the applicant’s application of their determination that such prior approval is required, the giving of such approval; or

(cc)the expiry of 28 days following the date on which the application under sub-paragraph (2)(ii) was received by the local planning authority without the local planning authority making any determination as to whether such approval is required or notifying the applicant of their determination;

(iv)where the local planning authority give the applicant notice that such prior approval is required, the applicant must—

(aa)display a site notice by site display on or near the land on which the proposed development is to be carried out, leaving the notice in position for not less than 21 days in the period of 28 days from the date on which the local planning authority gave the notice to the applicant; and

(bb)where the site notice is, without any fault or intention of the applicant, removed, obscured or defaced before the period of 21 days referred to in sub-paragraph (iv)(aa) has elapsed, the applicant is treated as having complied with the requirements of that sub-paragraph if the applicant has taken reasonable steps for protection of the notice and, if need be, its replacement;

(v)the development must, except to the extent that the local planning authority otherwise agree in writing, be carried out—

(aa)where prior approval is required, in accordance with the details approved;

(bb)where prior approval is not required, in accordance with the details submitted with the application; and

(vi)the development must be carried out—

(aa)where approval has been given by the local planning authority, within a period of 5 years from the date on which approval was given;

(bb)in any other case, within a period of 5 years from the date on which the local planning authority were given the information referred to in paragraph (d)(ii).

(3) The conditions in sub-paragraph (2) do not apply to the extension or alteration of a building if the building is not on article 2(4) land except in the case of a significant extension or a significant alteration.

(4) Development consisting of the significant extension or the significant alteration of a building may only be carried out once by virtue of Class A(a).

(5) Where development consists of works for the erection, significant extension or significant alteration of a building and—

(a)the use of the building or extension for the purposes of agriculture within the unit permanently ceases within 10 years from the date on which the development was substantially completed; and

(b)planning permission has not been granted on an application, or has not been deemed to be granted under Part 3 of the Act, for development for purposes other than agriculture, within 3 years from the date on which the use of the building or extension for the purposes of agriculture within the unit permanently ceased,

then, unless the local planning authority have otherwise agreed in writing, the building or, in the case of development consisting of an extension, the extension, must be removed from the land and the land must, so far as is practicable, be restored to its condition before the development took place, or to such condition as may have been agreed in writing between the local planning authority and the developer.

(6) Where an appeal has been made, under the Act, in relation to an application for development described in sub-paragraph (5)(b), within the period described in that paragraph, that period is extended until the appeal is finally determined or withdrawn.

(7) Where development is permitted by Class A(a), within 7 days of the date on which the development is substantially completed, the developer must notify the local planning authority in writing of that fact.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources