Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Textual Amendments
F1Words in Sch. 2 Pt. 16 Class C heading substituted (28.12.2017) by The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017 (S.I. 2017/1011), reg. 1(1), Sch. 3 para. 9(2)(b)(ii); S.I. 2017/1286, reg. 2
C. The installation, alteration or replacement on any building or other structure of a height of less than 15 metres of a microwave antenna.
C.1 Development is not permitted by Class C if—
(a)the building is a dwellinghouse or other structure within the curtilage of a dwellinghouse;
(b)it would consist of development of a kind described in Class A of this Part;
(c)it would consist of the installation, alteration or replacement of system apparatus within the meaning of section 8(6) of the Road Traffic (Driver Licensing and Information Systems) Act 1989 (definitions of driver information systems etc);
(d)it would result in the presence on the building or structure of—
(i)more than 2 antennas;
(ii)a single antenna exceeding 1 metre in length;
(iii)2 antennas which do not meet the relevant size criteria;
(iv)an antenna installed on a chimney, where the length of the antenna would exceed 0.6 metres;
(v)an antenna installed on a chimney, where the antenna would protrude over the chimney;
(vi)an antenna with a cubic capacity in excess of 35 litres;
(e)in the case of an antenna to be installed on a roof without a chimney, the highest part of the antenna would be higher than the highest part of the roof;
(f)in the case of an antenna to be installed on a roof with a chimney, the highest part of the antenna would be higher than the highest part of the chimney stack, or 0.6 metres measured from the highest part of the ridge tiles of the roof, whichever is the lowest; or
(g)in the case of article 2(3) land, it would consist of the installation of an antenna—
(i)on a chimney, wall or roof slope which faces onto, and is visible from, a highway;
(ii)in the Broads, on a chimney, wall or roof slope which faces onto, and is visible from, a waterway.
C.2 Development is permitted by Class C subject to the following conditions—
(a)the antenna is, so far as practicable, sited so as to minimise its effect on the external appearance of the building or structure on which it is installed; and
(b)an antenna no longer needed for reception or transmission purposes is removed from the building or structure as soon as reasonably practicable.
C.3 The relevant size criteria for the purposes of paragraph C.1(d)(iii) are that:
(a)only 1 of the antennas may exceed 0.6 metres in length; and
(b)any antenna which exceeds 0.6 metres in length must not exceed 1 metre in length.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: