- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made).
17. After regulation 21 (as inserted by regulation 16 above) insert the following Schedules(1)—
Regulation 3A
1. The Tables in Part 2 of this Schedule apply as follows.
2. Table 1 applies to any intermittent speed CI engine other than one to which Table 3, 4 or 5 applies and to any engine falling within paragraph 5(2).
3. Table 2 applies to any constant speed CI engine other than one to which Table 3, 4 or 5 applies.
4. Table 3 applies to—
(a)any CI engine which is designed for the propulsion of an inland waterway vessel; and
(b)any inland waterway vessel auxilliary engine with a net power output higher than 560kW.
5.—(1) Table 4 applies to any CI engine which is designed for the propulsion of locomotives.
(2) Paragraph (1) does not include any auxiliary engine or engine intended to power equipment designed to perform maintenance or construction work on the tracks.
6. Table 5 applies to any CI engine which is designed for the propulsion of railcars.
7. In the Tables in this Part of this Schedule—
(a)in column 2 of each entry, the range of power output specified is measured in kilowatts;
(b)in column 2 of Table 3 the range of swept volume is measured in litres per cylinder;
(c)in columns 3 and 5 of each entry, each sequence of numbers represents a date (for example, “01.01.1999” refers to 1st January 1999);
(d)in column 4 of each entry, the references are to the provision of Annex 1 that applies to determine the limit values on emissions of gaseous and particulate pollutants;
(e)in column 5 of each entry, the letters “N/A” indicate periods that had expired before the coming into force of the Non-Road Mobile Machinery (Emission of Gaseous and Particulate Pollutants) (Amendment) Regulations 2006(2).
Column 1 Category | Column 2 Power output (P) | Column 3 Period for placing on market | Column 4 Applicable limit values on emissions | Column 5 Period for type approval application | Column 6 Stage |
---|---|---|---|---|---|
A | 130 kW ≤ P ≤ 560 kW | 01.01.1999 to 31.12.2001 | 4.1.2.1 | N/A | I |
B | 75 kW ≤ P < 130 kW | 01.01.1999 to 31.12.2002 | 4.1.2.1 | N/A | I |
C | 37 kW ≤ P < 75 kW | 01.04.1999 to 31.12.2003 | 4.1.2.1 | N/A | I |
D1 | 19 kW ≤ P < 37 kW | 01.01.2001 to 31.12.2006 | 4.1.2.3, table | N/A | II |
D2 | 18 kW ≤ P < 19 kW | 01.01.2001 onwards | 4.1.2.3, table | 01.01.2000 onwards | II |
E | 130 kW ≤ P ≤ 560 kW | 01.01.2002 to 31.12.2005 | 4.1.2.3, table | N/A | II |
F | 75 kW ≤ P< 130 kW | 01.01.2003 to 31.12.2006 | 4.1.2.3, table | N/A | II |
G | 37 kW ≤ P< 75 kW | 01.01.2004 to 31.12.2007 | 4.1.2.3, table | 01.01.2003 to 31.12.2006 | II |
H | 130 kW ≤ P ≤ 560 kW | 01.01.2006 to 31.12.2010 | 4.1.2.4, first table | 01.07.2005 to 31.12.2009 | IIIA |
I | 75 kW ≤ P < 130 kW | 01.01.2007 to 31.12.2011 | 4.1.2.4, first table | 01.01.2006 to 31.12.2010 | IIIA |
J1 | 37 kW ≤ P < 56 kW | 01.01.2008 to 31.12.2012 | 4.1.2.4, first table | 01.01.2007 to 31.12.2011 | IIIA |
J2 | 56 kW ≤ P < 75 kW | 01.01.2008 to 31.12.2011 | 4.1.2.4, first table | 01.01.2007 to 31.12.2010 | IIIA |
K | 19kW ≤ P < 37 kW | 01.01.2007 onwards | 4.1.2.4, first table | 01.01.2006 onwards | IIIA |
L | 130 kW ≤ P ≤ 560 kW | 01.01.2011 to 31.12.2013 | 4.1.2.5, first table | 01.01.2010 to 31.12.2012 | IIIB |
M | 75 kW ≤ P < 130 kW | 01.01.2012 to 30.09.2014 | 4.1.2.5, first table | 01.01.2011 to 30.09.2013 | IIIB |
N | 56 kW ≤ P < 75 kW | 01.01.2012 to 30.09.2014 | 4.1.2.5, first table | 01.01.2011 to 30.09.2013 | IIIB |
P | 37 kW ≤ P < 56 kW | 01.01.2013 onwards | 4.1.2.5, first table | 01.01.2012 onwards | IIIB |
Q | 130 kW ≤ P ≤ 560 kW | 01.01.2014 onwards | 4.1.2.6, table | 01.01.2013 onwards | IV |
R | 56 kW ≤ P < 130 kW | 01.10.2014 onwards | 4.1.2.6, table | 01.10.2013 onwards | IV |
Column 1 Category | Column 2 Power output (P) | Column 3 Period for placing on market | Column 4 Applicable limit values on emissions | Column 5 Period for type approval application | Column 6 Stage |
---|---|---|---|---|---|
D1 | 19 kW ≤ P < 37 kW | 01.01.2007 to 31.12.2010 | 4.1.2.3, table | 01.01.2007 to 31.12.2009 | II |
D2 | 18 kW ≤ P < 19 kW | 01.01.2007 onwards | 4.1.2.3, table | 01.01.2007 onwards | II |
E | 130 kW ≤ P ≤ 560 kW | 01.01.2007 to 31.12.2010 | 4.1.2.3, table | 01.01.2007 to 31.12.2009 | II |
F | 75 kW ≤ P < 130 kW | 01.01.2007 to 31.12.2010 | 4.1.2.3, table | 01.01.2007 to 31.12.2009 | II |
G | 37 kW ≤ P < 75 kW | 01.01.2007 to 31.12.2011 | 4.1.2.3, table | 01.01.2007 to 31.12.2010 | II |
H | 130 kW ≤ P < 560 kW | 01.01.2011 onwards | 4.1.2.4, first table | 01.01.2010 onwards | IIIA |
I | 75 kW ≤ P < 130 kW | 01.01.2011 onwards | 4.1.2.4, first table | 01.01.2010 onwards | IIIA |
J | 37 kW ≤ P < 75 kW | 01.01.2012 onwards | 4.1.2.4, first table | 01.01.2011 onwards | IIIA |
K | 19kW ≤ P < 37 kW | 01.01.2011 onwards | 4.1.2.4, first table | 01.01.2010 onwards | IIIA |
Column 1 Category | Column 2 Swept volume (SV)/ Power output (P) | Column 3 Period for placing on market | Column 4 Applicable limit values on emissions | Column 5 Period for type approval application | Column 6 Stage |
---|---|---|---|---|---|
VI:1 | SV < 0.9, and P ≥ 37 kW | 01.01.2007 onwards | 4.1.2.4, second table | 01.01.2006 onwards | IIIA |
VI:2 | 0.9 ≤ SV < 1.2 | 01.01.2007 onwards | 4.1.2.4, second table | 01.07.2005 onwards | IIIA |
VI:3 | 1.2 ≤ SV < 2.5 | 01.01.2007 onwards | 4.1.2.4, second table | 01.07.2005 onwards | IIIA |
VI:4 | 2.5 ≤ SV < 5 | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2007 onwards | IIIA |
V2:1 | 5 ≤ SV < 15 | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2008 onwards | IIIA |
V2:2 | 15 ≤ SV < 20, and P ≤ 3300 kW | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2008 onwards | IIIA |
V2:3 | 15 ≤ SV < 20, and P >3300 kW | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2008 onwards | IIIA |
V2:4 | 20 ≤ SV < 25 | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2008 onwards | IIIA |
V2:5 | 25 ≤ SV < 30 | 01.01.2009 onwards | 4.1.2.4, second table | 01.01.2008 onwards | IIIA |
Column 1 Category | Column 2 Power output (P) | Column 3 Period for placing on market | Column 4 Applicable limit values on emissions | Column 5 Period for type approval application | Column 6 Stage |
---|---|---|---|---|---|
RLA | 130 ≤ P ≤ 560 | 01.01.2007 to 31.12.2011 | 4.1.2.4, third table | 01.01.2006 to 31.12.2010 | IIIA |
RHA | P > 560 | 01.01.2009 to 31.12.2011 | 4.1.2.4, third table | 01.01.2008 to 31.12.2010 | IIIA |
RB | P > 130 | 01.01.2012 onwards | 4.1.2.5, third table | 01.01.2011 onwards | IIIB |
Column 1 Category | Column 2 Power output (P) | Column 3 Period for placing on market | Column 4 Applicable limit values on emissions | Column 5 Period for type approval application | Column 6 Stage |
---|---|---|---|---|---|
RCA | P > 130 | 01.01.2006 to 31.12.2011 | 4.1.2.4, fourth table | 01.07.2005 to 31.12.2010 | IIIA |
RCB | P > 130 | 01.01.2012 onwards | 4.1.2.5, second table | 01.01.2011 onwards | IIIB |
Regulation 3B
1. This Part of this Schedule applies to a CI engine falling within a category specified in any Table in Schedule 8 to these Regulations.
2. The requirements of regulation 3B shall not apply to CI engines which are produced directly or indirectly on behalf of and for use only by the armed services.
3. The requirements of regulation 3B shall not apply to—
(a)CI engines for use in machines intended primarily for the launch and recovery of lifeboats; or
(b)CI engines for use in machines intended primarily for the launch and recovery of beach launched vessels.
4. The requirements of regulation 3B(2)(a), (b) and (c) shall not apply to CI engines which—
(a)are approved by the competent approval authorities in another EEA State in accordance with Directive 97/68/EC;
(b)conform to the requirements of the approval; and
(c)have affixed to them the markings as defined in section 3 of Annex 1, including the type approval number.
5.—(1) A manufacturer may place on the market a qualifying CI engine notwithstanding that it does not comply with the limit values on the emissions of gaseous and particulate pollutants that apply to the engine by virtue of regulation 3A.
(2) “Qualifying CI engine” means an engine which—
(a)falls within a category specified in a Table in Schedule 8 to these Regulations for which the Stage indicated in column 6 of the Table is IIIA, IIIB or IV;
(b)has a production date before the beginning of the period specified for that category in column 3 of the Table;
(c)is placed on the market no later than two years after the beginning of that period; and
(d)is of an engine type or family which complies with the limit values (if any) on the emissions of gaseous and particulate pollutants which, by virtue of regulation 3A, applied to the category of engines specified in the same Table with the same power output but under the immediately preceding Stage.
6. This Part of this Schedule applies to a CI engine falling within a category specified in Table 1 or 2 in Schedule 8 to these Regulations.
7. The requirements of regulation 3B shall not apply to replacement CI engines which comply with regulation 7A.
8.—(1) In relation to CI engines which fall within categories A, B or C, the type approvals specified in sections 1.1, 1.2 and 1.3 of Annex 12 shall be regarded as being equivalent to a type approval issued in accordance with these Regulations so long as the engine has affixed to it any markings that are specified by the relevant type approval.
(2) In relation to CI engines which fall within categories D1, D2, E, F or G, the type approvals specified in sections 2.1, 2.2, 2.3 and 2.4 of Annex 12 shall be regarded as being equivalent to a type approval issued in accordance with these Regulations so long as the engine has affixed to it any markings that are specified by the relevant type approval.
9.—(1) If the requirements of paragraphs 11 to 13 are complied with in relation to a flexibility scheme approved under paragraph 10, an eligible CI engine may be placed on the market under the scheme, notwithstanding that the engine does not comply with the limit values on the emissions of gaseous and particulate pollutants that apply to the engine by virtue of regulation 3A.
(2) A flexibility scheme is a scheme for the placing on the market of eligible CI engines with a view to their use in a particular type of non-road mobile machinery.
(3) In paragraphs 10 to 13, a person who manufactures a type of non-road mobile machine is referred to as an original equipment manufacturer or “OEM”.
(4) In this paragraph and paragraph 11 “eligible CI engine” means—
(a)an intermittent speed or constant speed CI engine falling within any of categories H to K (Stage IIIA categories);
(b)an intermittent speed CI engine falling within any of categories L to P (Stage IIIB categories); or
(c)an intermittent speed CI engine falling within category Q or R (Stage IV categories).
10.—(1) An application for approval under this paragraph of a flexibility scheme—
(a)must be made to the approval authority; and
(b)may be made only by the original equipment manufacturer of the non-road mobile machinery into which an engine subject to the scheme is, or is to be, installed.
(2) An application must specify whether the engines subject to the scheme fall within a Stage IIIA, IIIB or IV category and must include—
(a)a sample of the labels referred to in paragraph 11(c);
(b)a sample of the labels referred to in paragraph 13(1)(a); and
(c)such information as the approval authority may request in order to enable it to determine whether or not to approve the scheme.
(3) An application may request approval for the limit on the number of engines that may be placed on the market under the scheme to be determined in accordance with paragraph 12(4) (instead of in accordance with paragraph 12(2)).
(4) The approval authority must notify the OEM of its decision whether or not to approve the scheme.
11. In relation to an eligible CI engine falling within a particular category, the requirements of this paragraph are that—
(a)the engine is placed on the market before the end of the period specified for that category in column 3 of the Table;
(b)the engine complies with the limit values on the emissions of gaseous and particulate pollutants which, by virtue of regulation 3A, applied to the category of engines specified in the same Table with the same power output but under the immediately preceding Stage; and
(c)the text “ENGINE PLACED ON MARKET UNDER THE FLEXIBILITY SCHEME” is attached to a label on the engine.
12.—(1) The number of engines falling within each category that are placed on the market under a flexibility scheme must not exceed the maximum determined in accordance with this paragraph.
(2) Unless sub-paragraph (4) applies, the maximum number is 20 per cent of the relevant average of annual sales of the non-road mobile machinery in which engines falling within the category are installed.
(3) The relevant average is to be calculated—
(a)as the arithmetic mean of the OEM’s annual sales on the European Economic Area market over the preceding 5 years; or
(b)if equipment of the OEM has been marketed in the European Economic Area for a period of less than 5 years, on the basis of the period for which the OEM has marketed equipment in the European Community.
(4) Where a request has been approved under paragraph 10(3) in relation to a category of engine with power output (measured in kW) within the range specified in column 1 of the following Table, the maximum number of engines falling within that category which may be placed on the market under the scheme is the number specified in column 2.
Column 1 Power output of engine category (P) | Column 2 Maximum number of engines |
---|---|
19 kW ≤ P < 37 kW | 200 |
37 kW ≤ P < 75 kW | 150 |
75 kW ≤ P < 130 kW | 100 |
130 kW ≤ P < 560 kW | 50 |
13.—(1) The OEM must—
(a)in relation to each non-road mobile machinery in which an engine placed on the market under a flexibility scheme is installed, affix a label bearing the following text (inserting the information indicated, as appropriate)—
“MACHINE No ... ... ... ...(sequence of machines) OF ... ... ... ... (total number of machines in respective power band) WITH ENGINE No ... ... ... ... WITH TYPE APPROVAL (Dir 97/68/EC) No ... ... ... ...”;
(b)within one month of the approval authority giving a notification under paragraph 10(4), send particulars of the scheme to the competent approval authorities of every other EEA State; and
(c)provide those authorities and the approval authority with a report on the implementation of the scheme.
(2) A report under sub-paragraph (1)(c) must be sent at least once every 6 months after the approval is given, until such time as the final report is sent indicating that the maximum number of engines permitted under paragraph 12 have been placed on the market and that the scheme is terminated accordingly.
(3) A report under sub-paragraph (1)(c) must include cumulative data relating to the scheme, including—
(a)the number of engines placed on the market and their serial numbers;
(b)the number of non-road mobile machinery placed on the market and their serial numbers; and
(c)the EEA States in which non-road mobile machinery covered by the scheme have been placed on the market.
14. This Part of this Schedule applies to a CI engine falling within a category specified in Table 3 in Schedule 8 to these Regulations.
15.—(1) The requirements of regulation 3B shall not apply to CI engines which—
(a)meet the requirements established by CCNR Stage I , the emission limit values for which are set out in Annex 14; and
(b)are placed on the market on or before 30th June 2007.
(2) The requirements of regulation 3B shall not apply to CI engines which meet the requirements established by CCNR Stage II, the emission limit values for which are set out in Annex 15.
(3) References to the requirements established by CCNR Stage I or II are to requirements applying to inland waterway vessels which—
(a)are established in the framework of the Mannheim Convention for the Navigation of the Rhine (as amended at the date on which these Regulations come into force(3)); and
(b)have been formally recognised by the Central Commission of Navigation on the Rhine as being equivalent to such requirements of Directive 97/68/EC as apply to inland waterway vessels.
16. This Part of this Schedule applies to a CI engine falling within a category specified in Table 4 in Schedule 8 to these Regulations.
17. The requirements of regulation 3B shall not apply to CI engines which are—
(a)manufactured pursuant to a contract to purchase the engine which was entered into before 20th May 2004; and
(b)placed on the market no later than—
(i)in the case of an engine with a power output within the range specified for category RLA, 31st December 2008;
(ii)in the case of an engine with a power output within the range specified for category RHA, 31st December 2010.
18.—(1) A manufacturer may place on the market a qualifying CI engine notwithstanding that it does not comply with the limit values that apply to it by virtue of regulation 3A.
(2) ”Qualifying CI engine” means an engine which—
(a)falls within category RB;
(b)is manufactured pursuant to a contract to purchase the engine which was entered into before 20th May 2004;
(c)is placed on the market no later than 31st December 2013; and
(d)complies with the limit values on the emissions of gaseous and particulate pollutants which, by virtue of regulation 3A, applied to the category of engines specified in Table 4 in Schedule 8 with the same power output but under the immediately preceding Stage.
19.—(1) If sub-paragraph (2) applies, the approval authority may issue a type approval certificate pursuant to regulation 9 notwithstanding that the requirements of regulation 3C(2)(b) are not met in relation to the engine provided in connection with the application for type approval.
(2) This sub-paragraph applies if—
(a)a contract to purchase engines of the engine type or family to which the application for type approval relates was entered into before 20th May 2004;
(b)the application for type approval is made in the period beginning with 1st January 2011 and ending with 31st December 2012; and
(c)the engine complies with the limit values on emissions of gaseous and particulate pollutants which, by virtue of regulation 3A, applied to the category of engines specified in Table 4 in Schedule 8 with the same power output but under the immediately preceding Stage.”.
Schedules 1 to 7 to the 1999 Regulations were revoked by S.I. 2002/1649.
The Mannheim Convention was signed on 17th October 1868 and establishes principles for navigation on the Rhine which are still in force today. On 17th October 1963 the Convention was amended without modification of the basic principles and integrated into the Revised Convention for Rhine Navigation. A number of protocols have been added up to and including Protocol Number 5 on 28th April 1999.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: