Search Legislation

Planning (Fees) (Amendment) Regulations (Northern Ireland) 2003

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Regulation 2(6)(b)

SCHEDULESUBSTITUTION OF PART II OF SCHEDULE 1 TO THE PLANNING (FEES) REGULATIONS (NORTHERN IRELAND) 1995

PART IIscales of fees

Category of developmentFee payable

1.  The erection of dwellinghouses.

(A)  Where the application is for one dwellinghouse only–

(i)£180 for outline planning permission;

(ii)£445 in any other case.

(B)  Where the application is for two or more dwellinghouses–

(i)for outline planning permission, £160 for each 0.1 hectare of the site area subject to a maximum of £4,000;

(ii)in other cases £160 for each dwellinghouse subject to a maximum of £8,000.

2.  The extension, improvement or alteration of an existing dwellinghouse, including the erection of a building or the carrying out of other operations within the curtilage of a dwellinghouse for purposes ancillary to the enjoyment of the dwellinghouse as such, or the erection or construction of gates, fences, walls or other means of enclosure along a boundary of a curtilage of an existing dwellinghouse.

(A)  Where the application relates to one dwellinghouse only, £155.

(B)  Where the application relates to two or more dwellinghouses, £295.

3.(a) The erection of industrial, commercial, community and other buildings, other than dwellinghouses or buildings covered by category 2.

(b)The erection, alteration or replacement of plant and machinery.

(c)The construction or extension of a non-nuclear electricity generating station.

(A)  Where the application is for outline planning permission, £180 for each 0.1 hectare of the site area subject to a maximum of £4,500;

(B)  in other cases–

(i)where no floor space is to be created by the development , £80;

(ii)where the area of gross floorspace to be created by the development does not exceed 40 square metres, £90;

(iii)where the area of gross floorspace to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £160; and

(iv)where the area of gross floorspace to be created by the development exceeds 75 square metres, £160 for each 75 square metres subject to a maximum of £8,000.

4.  The erection, on land used for the purposes of agriculture, of buildings to be used for agricultural purposes and for agricultural and commercial glasshouses.

Where the application is for–

(A)  outline planning permission, £390;

(B)  in other cases–

(i)where the area of gross floor space to be created by the development does not exceed 500 square metres, £775;

(ii)where the area of gross floorspace to be created by the development exceeds 500 square metres, £1,145.

5.  The winning and working of peat.

£875 for each 5 hectares of the site area or part thereof subject to a maximum of £21,875.

6.(a) The winning and working of minerals (other than peat).

(b)The carrying out of any operations connected with exploratory drilling for oil or natural gas.

(c)The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land or for the use of land for the storage of minerals in the open.

(d)The carrying out of any other operation not coming within any of the above categories.

£875 for each 0.5 hectare of the site area or part thereof subject to a maximum of £26,250.

7.(a) The construction of single level car parks, service roads and other means of access on land used for the purpose of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.

(b)The installation of a single overhead electricity line.

(c)The continuance of a use of land or the retention of buildings or works on land, without compliance with a condition subject to which a previous planning permission has been granted (including a condition requiring the discontinuance of the use or the removal of the building or works at the end of the specified period).

(d)An application to develop land without compliance with a condition subject to which a previous planning permission has been granted.

£160.

8.(a) An application for a material change of use to one or more separate dwelling houses.

£320.

(b)Any other application not falling within categories 1–7.

£535.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources