Search Legislation

Commission Regulation (EU) No 1301/2014Show full title

Commission Regulation (EU) No 1301/2014 of 18 November 2014 on the technical specifications for interoperability relating to the ‘energy’ subsystem of the rail system in the Union (Text with EEA relevance) (revoked)

 Help about what version

What Version

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

Commission Regulation (EU) No 1301/2014 is up to date with all changes known to be in force on or before 06 August 2025. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the affected provisions when you open the content using the Table of Contents below.

View outstanding changes

Changes and effects yet to be applied to :

  1. Introductory Text

  2. Article 1.Subject matter

  3. Article 2.Scope

  4. Article 3.Open points

  5. Article 4.Specific cases

  6. Article 5.Notification of bilateral agreements

  7. Article 6.Projects at an advanced stage of development

  8. Article 7.‘EC’ certificate of verification

  9. Article 8.Conformity assessment

  10. Article 9.Implementation

  11. Article 10.Innovative solutions

  12. Article 11.Repeal

  13. Article 12.Entry into force

  14. Signature

    1. ANNEX

      1. 1. INTRODUCTION

        1. 1.1. Technical Scope

        2. 1.2. Geographical scope

        3. 1.3. Content of this TSI

      2. 2. DESCRIPTION OF THE ENERGY SUBSYSTEM

        1. 2.1. Definition

        2. 2.2. Interfaces with other subsystems

          1. 2.2.1. Introduction

          2. 2.2.2. Interfaces of this TSI with the Safety in railway tunnels...

      3. 3. ESSENTIAL REQUIREMENTS

      4. 4. CHARACTERISATION OF THE SUBSYSTEM

        1. 4.1. Introduction

        2. 4.2. Functional and technical specifications of the subsystem

          1. 4.2.1. General provisions

          2. 4.2.2. Basic parameters characterising the energy subsystem

          3. 4.2.3. Voltage and frequency

          4. 4.2.4. Parameters relating to supply system performance

            1. 4.2.4.1. Maximum train current

            2. 4.2.4.2. Mean useful voltage

          5. 4.2.5. Current at standstill (DC systems only)

          6. 4.2.6. Regenerative braking

          7. 4.2.7. Electrical protection coordination arrangements

          8. 4.2.8. Harmonics and dynamic effects for AC traction power supply systems...

          9. 4.2.9. Geometry of the overhead contact line

            1. 4.2.9.1. Contact wire height

            2. 4.2.9.2. Maximum lateral deviation

          10. 4.2.10. Pantograph gauge

          11. 4.2.11. Mean contact force

          12. 4.2.12. Dynamic behaviour and quality of current collection

          13. 4.2.13. Pantograph spacing for overhead contact line design

          14. 4.2.14. Contact wire material

          15. 4.2.15. Phase separation sections

            1. 4.2.15.1. General

            2. 4.2.15.2. Lines with speed v ≥ 250 km/h

            3. 4.2.15.3. Lines with speed v < 250 km/h

          16. 4.2.16. System separation sections

            1. 4.2.16.1. General

            2. 4.2.16.2. Pantographs raised

            3. 4.2.16.3. Pantographs lowered

          17. 4.2.17. On-ground energy data collecting system

            1. (1) Point 4.2.8.2.8 of LOC & PAS TSI contains the requirements...

            2. (2) The on-ground energy data collecting system (DCS) shall receive, store...

            3. (3) The on-ground energy DCS shall support all the data exchange...

          18. 4.2.18. Protective provisions against electric shock

        3. 4.3. Functional and technical specifications of the interfaces

          1. 4.3.1. General requirements

          2. 4.3.2. Interface with Rolling Stock subsystem.

          3. 4.3.3. Interface with Infrastructure subsystem

          4. 4.3.4. Interface with Control — Command and Signalling subsystems

          5. 4.3.5. Interface with Operation and traffic management subsystem

        4. 4.4. Operating rules

        5. 4.5. Maintenance rules

        6. 4.6. Professional qualifications

        7. 4.7. Health and safety conditions

      5. 5. INTEROPERABILITY CONSTITUENTS

        1. 5.1. List of constituents

        2. 5.2. Constituents' performances and specifications

          1. 5.2.1. Overhead contact line

            1. 5.2.1.1. Geometry of the OCL

            2. 5.2.1.2. Mean contact force

            3. 5.2.1.3. Dynamic behaviour

            4. 5.2.1.4. Space for steady arm uplift

            5. 5.2.1.5. Pantograph spacing for overhead contact line design

            6. 5.2.1.6. Current at standstill (DC systems only)

            7. 5.2.1.7. Contact wire material

      6. 6. ASSESSMENT OF CONFORMITY OF THE INTEROPERABILITY CONSTITUENTS AND EC VERIFICATION...

      7. 7. IMPLEMENTATION OF THE ENERGY TSI

      8. Appendix A

        Conformity assessment of interoperability constituents

        1. A.1 SCOPE

        2. A.2 CHARACTERISTICS

      9. Appendix B

        EC verification of the energy subsystem

        1. B.1 SCOPE

        2. B.2 CHARACTERISTICS

      10. Appendix C

        Mean useful voltage

        1. C.1 VALUES FOR U MEAN USEFUL AT THE PANTOGRAPH

        2. C.2 SIMULATION RULES

      11. Appendix D

        Specification of the pantograph gauge

        1. D.1 SPECIFICATION OF THE MECHANICAL KINEMATIC PANTOGRAPH GAUGE

          1. D.1.1 General

            1. D.1.1.1 Space to be cleared for electrified lines

            2. D.1.1.2 Particularities

            3. D.1.1.3 Symbols and abbreviations

            4. D.1.1.4 Basic principles

              1. Figure D.1 Pantograph mechanical gauges

                1. Caption:

          2. D.1.2 Specification of the mechanical kinematic pantograph gauge

            1. D.1.2.1 Specification of the width of the mechanical gauge

              1. D.1.2.1.1 Scope

              2. D.1.2.1.2 Calculation methodology

              3. D.1.2.1.3 Half-length bw of the pantograph bow

              4. D.1.2.1.4 Pantograph sway ep

              5. D.1.2.1.5 Additional overthrows

              6. D.1.2.1.6 Quasi-static effect

              7. D.1.2.1.7 Allowances

            2. D.1.2.2 Specification of the height of the mechanical gauge

          3. D.1.3 Reference parameters

          4. D.1.4 Calculation of maximum lateral deviation of contact wire

        2. D.2 SPECIFICATION OF THE STATIC PANTOGRAPH GAUGE (TRACK GAUGE SYSTEM 1...

      12. Appendix E

        List of referenced standards

      13. Appendix F

        List of open points

        1. Intentionally deleted

      14. Appendix G

        Glossary

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources