Search Legislation

Directive 2008/57/EC of the European Parliament and of the Council (repealed)Show full title

Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community (Recast) (Text with EEA relevance) (repealed)

 Help about what version

What Version

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Status:

This is the original version (as it was originally adopted).

Article 9Derogations

1.In the absence of relevant specific cases, a Member State need not apply one or more TSIs in accordance with this Article in the following cases:

(a)for a proposed new subsystem, for the renewal or upgrading of an existing subsystem, or for any element referred to in Article 1(1) at an advanced stage of development or the subject of a contract in the course of performance when these TSIs are published;

(b)for any project concerning the renewal or upgrading of an existing subsystem where the loading gauge, track gauge, space between the tracks or electrification voltage in these TSIs is not compatible with those of the existing subsystem;

(c)for a proposed new subsystem or for the proposed renewal or upgrading of an existing subsystem in the territory of that Member State when its rail network is separated or isolated by the sea or separated as a result of special geographical conditions from the rail network of the rest of the Community;

(d)for any proposed renewal, extension or upgrading of an existing subsystem, when the application of these TSIs would compromise the economic viability of the project and/or the compatibility of the rail system in that Member State;

(e)where, following an accident or a natural disaster, the conditions for the rapid restoration of the network do not economically or technically allow for partial or total application of the relevant TSIs;

(f)for vehicles coming from or going to third countries the track gauge of which is different from that of the main rail network within the Community.

2.In the cases referred to in paragraph 1, the Member State concerned shall communicate to the Commission a file containing the information set out in Annex IX. The Commission shall analyse the measures proposed by the Member State and shall inform the committee referred to in Article 29.

3.In the case referred to in paragraph 1(a), within one year of entry into force of each TSI each Member State shall communicate to the Commission a list of projects that are taking place within its territory and are at an advanced stage of development.

4.In the cases referred to in paragraph 1(a), (c) and (e), the Commission shall check that the file is in conformity and shall inform the Member State of the results of its analysis. Where necessary, a recommendation shall be drawn up concerning the specifications to be applied. The Member State may apply the alternative provisions referred to in Annex IX without delay.

5.In the cases referred to in paragraph 1(b), (d) and (f), the Commission shall decide, in accordance with the regulatory procedure referred to in Article 29(3), whether to accept a request for a derogation. In the case referred to in paragraph 1(b), the Commission's decision shall not cover the loading gauge and the track gauge. The Commission shall give its decision within six months of the submission of the request supported by the complete file. In the absence of such a decision, the request shall be deemed to have been accepted. Pending the Commission's decision, in the case referred to in paragraph 1(f), a Member State may apply the alternative provisions referred to in Annex IX.

6.All Member States shall be informed of the results of the analyses and of the outcome of the procedure set out in paragraphs 4 and 5.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources