Commission Directive 2007/32/EC of 1 June 2007 amending Annex VI to Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Annex VI to Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
This is the original version (as it was originally adopted).
“EC” verification is the procedure whereby a notified body checks and certifies that a subsystem:
complies with the Directive
complies with the other regulations deriving from the Treaty, and may be put into operation.
The subsystem is checked at each of the following stages:
overall design,
production: construction of subsystem, including, for example civil-engineering activities, manufacturing, constituent assembly, overall adjustment,
final testing of the subsystem.
For the design phase (including the type tests) and for the production phase the main contractor (or the manufacturer) or its authorised representative established within the Community may apply for an assessment as a first step.
In this case, this (these) assessment(s) lead to intermediate statement verification(s) (ISV) issued by the Notified Body chosen by the main contractor (or the manufacturer). This one in turn draws up an “EC declaration of intermediate subsystem conformity” for the relevant phase(s).
The Notified Body responsible for the “EC” verification draws up the certificate of verification intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the “EC” declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.
The Notified Body responsible for “EC” verification assesses the design and production of the subsystem.
If available, the Notified Body takes into account the “Intermediate Statements of Verification” (ISV(s)), and, in order to issue the “EC” certificate of verification, it:
Checks that the subsystem:
is covered by relevant design and production ISVs delivered to the main contractor (or the manufacturer) if it has asked the Notified Body for these two phases,
or corresponds as produced to all aspects covered by the design ISV delivered to the main contractor (or the manufacturer) if it has asked the Notified Body only for the design phase,
Verifies that they cover correctly the requirement of the TSI and assesses the design and production elements that are not covered by the design and/or production ISV(s) delivered to the main contractor (or the manufacturer).
The technical file accompanying the declaration of verification must be made up as follows:
for the infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete, etc.,
for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.,
list of interoperability constituents, as referred to in Article 3, incorporated into the subsystem,
copies of the “EC” declarations of conformity or suitability for use with which the above mentioned constituents must be provided in accordance with Article 13 of the Directive accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications,
if available, the intermediate statement(s) of verification (ISV) and, in such a case, the “EC” declaration(s) of intermediate subsystem conformity, that accompany the “EC” certificate of verification, including the result of verification by the Notified Body of their validity,
certificate from the Notified Body responsible for “EC” verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with this Directive and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.
The complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of verification issued by the Notified Body responsible for verification of the subsystem in working order. The file must be attached to the “EC” declaration of verification which the contracting entity sends to the supervisory authority in the Member State concerned.
A copy of the file must be kept by the contracting entity throughout the service life of the subsystem. It must be sent to any other Member States which so request.
Each Notified Body must periodically publish relevant information concerning:
requests for “EC” verification received;
intermediate statements of verification (ISVs) issued or refused;
certificates of verification issued or refused.
The files and correspondence relating to the “EC” verification procedures must be written in an official language of the Member State in which the contracting entity or its authorised representative within the Community is established or in a language accepted by the entity.”
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: