The Emissions Performance Standard (Enforcement) (Wales) Regulations 2015

 Help about what version

Pa Fersiwn

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Title, application and commencement

1.—(1) The title of these Regulations is the Emissions Performance Standard (Enforcement) (Wales) Regulations 2015.

(2) These Regulations apply in relation to Wales and come into force on 8 July 2015.

Interpretation

2.  In these Regulations—

“the Act” (“y Ddeddf”) means the Energy Act 2013;

“associated gasification plant” (“gwaith nwyeiddio cysylltiedig”) means any gassification plant that—

(a)

produces fuel from fossil fuels; and

(b)

the fuel produced by that plant is used by a relevant fossil fuel plant to generate electricity;

“CCS notification” (“hysbysiad dal a storio carbon”) means a notification under regulation 4;

“civil penalty notice” (“hysbysiad cosb sifil”) means a notice issued under regulation 9;

“emissions limit notification” (“hysbysiad terfyn allyriadau”) means a notification under regulation 3;

“enforcement notice” (“hysbysiad gorfodi”) means a notice issued under regulation 8;

“EPS annual emissions” (“allyriadau blynyddol y Safon Perfformiad Allyriadau”) is to be construed in accordance with regulations 7 and 8 of the Emissions Performance Standard Regulations 2015(1);

“EPS annual emissions notification” (“hysbysiad allyriadau blynyddol y Safon Perfformiad Allyriadau”) means a notification under regulation 5;

“generating station” (“gorsaf gynhyrchu”) means a station which generates electricity;

“generating unit” (“uned gynhyrchu”) means any combination of generators, boilers, turbines, or other prime movers that are physically connected as one unit and operated together to produce electricity independently of any other unit;

“the GGETS Regulations” (“y Rheoliadau CMANTG”) means the Greenhouse Gas Emissions Trading Scheme Regulations 2012(2);

“Greenhouse Gas Emissions Permit” (“Trwydded Allyriadau Nwyon Tŷ Gwydr”) means a permit granted under regulation 10 of the GGETS Regulations;

“Greenhouse Gas Emissions Report” (“Adroddiad Allyriadau Nwyon Tŷ Gwydr”) means a report required to be submitted by an operator by Article 67(1) of the Monitoring and Reporting Regulation(3);

“information notice” (“hysbysiad gwybodaeth”) is a notice issued under regulation 7;

“installed generating capacity” (“capasiti cynhyrchu gosodedig”), in relation to a generating station or generating unit, means the maximum capacity of electricity generation (in MW) at which that generating station or generating unit could be operated for a sustained period without damage being caused to it (assuming the source of energy used to generate electricity is available without interruption);

“the Monitoring and Reporting Regulation” (“y Rheoliad Monitro ac Adrodd”) means Commission Regulation (EU) No 601/2012 on the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC of the European Parliament and of the Council(4);

“MW” (“MW”) means megawatts;

“MWth” (“MWth”) means megawatt of thermal output;

“NRBW” (“CANC”) means Natural Resources Body for Wales;

“operator” (“gweithredwr”), in relation to a relevant fossil fuel plant, means the person required to hold a Greenhouse Gas Emissions Permit for the relevant fossil fuel plant;

“relevant fossil fuel plant” (“gwaith tanwydd ffosil perthnasol”) means a fossil fuel plant to which the emissions limit duty applies under the Act or a generating unit to which the emissions limit duty applies by virtue of regulation 3 of the Emissions Performance Standard Regulations 2015;

“source stream” (“ffrwd ffynhonnell”) has the same meaning as in Article 3(4) of the Monitoring and Reporting Regulation.

“year” has the same meaning as in section 61(1) of the Act.

Emissions limit notification duty

3.—(1) If any of the conditions in paragraph (3) are met in relation to a relevant fossil fuel plant, the operator of the plant must submit a notification (“an emissions limit notification”) to the NRBW within 31 days of the date on which the condition is met (or if more than one condition is met, within 31 days of the date on which the earliest condition is met).

(2) An emissions limit notification must state—

(a)the emissions limit (in tonnes of carbon dioxide) for the relevant fossil fuel plant, calculated in accordance with section 57(1) of the Act and as modified, if applicable, by regulation 4 of the Emissions Performance Standard Regulations 2015;

(b)the installed generating capacity of the relevant fossil fuel plant; and

(c)the date on which the relevant fossil fuel plant commenced or is expected to commence generation.

(3) The conditions referred to in paragraph (1) are—

(a)that a Greenhouse Gas Emissions Permit in relation to the relevant fossil fuel plant—

(i)is held by the operator on the date these Regulations come into force;

(ii)is granted to the operator after the date these Regulations come into force; or

(iii)is varied in relation to the amount of installed generating capacity covered by that permit after the date these Regulations come into force; or

(b)the emissions limit for the relevant fossil fuel plant is modified by regulation 4 of the Emissions Performance Standard Regulations 2015.

(4) An emissions limit notification must be submitted in such form and manner as the NRBW may reasonably require.

CCS notification

4.—(1) For the purposes of section 58 of the Act, the NRBW must not consider a complete CCS system to be ready for use unless it has first received from the operator a notification (“a CCS notification”) in respect of the system.

(2) A CCS notification must state—

(a)each generating unit within the relevant fossil fuel plant to which the complete CCS system relates;

(b)the installed generating capacity of all the generating units stated under sub-paragraph (a); and

(c)the date on which the operator wishes the complete CCS system to be considered ready for use.

(3) A CCS notification must be submitted in such form and manner as the NRBW may reasonably require.

EPS annual emissions notification

5.—(1) If the condition in paragraph (2) is satisfied in relation to a relevant fossil fuel plant, the operator of the plant must submit a notification (“an EPS annual emissions notification”) to the NRBW in accordance with paragraphs (4) and (5).

(2) The condition referred to in paragraph (1) is that the total of—

(a)the total emissions of carbon dioxide for the relevant fossil fuel plant reported in a verified Greenhouse Gas Emissions Report; and

(b)if applicable and where not otherwise included in the total under sub-paragraph (a), the total emissions of carbon dioxide directly attributable to the production of fuel produced from fossil fuel in any associated gasification plant used by the relevant fossil fuel plant for the same period as the report,

is greater than the emissions limit for that plant for the year covered by the report.

(3) For the purposes of paragraph (2)—

(a)only emissions of carbon dioxide which relate to generating units reported in a verified Greenhouse Gas Emissions Report are to be included; and

(b)“emissions limit” (“terfyn allyriadau”) means the emissions limit for the relevant fossil fuel plant calculated in accordance with section 57(1) of the Act and as modified, if applicable, by regulation 4 of the Emissions Performance Standard Regulations 2015.

(4) An EPS annual emissions notification must—

(a)state the EPS annual emissions for the relevant fossil fuel plant for the same period as the verified Greenhouse Gas Emissions Report referred to in paragraph (2), and for this purpose, the EPS annual emissions are to be calculated or measured in accordance with the methodology of the Monitoring and Reporting Regulation;

(b)identify source streams for each generating unit at the relevant fossil fuel plant to which the emissions limit duty applies;

(c)be submitted to the NRBW within 10 days of the submission of the verified Greenhouse Gas Emissions Report referred to in paragraph (2); and

(d)be submitted in such form and manner as the NRBW may reasonably require.

Charges

6.—(1) The Welsh Ministers may make, and from time to time revise, a scheme for the charging by the NRBW of fees or other charges for the carrying out of functions conferred on it by these Regulations (“an EPS charging scheme”).

(2) An EPS charging scheme may, in particular—

(a)make different provision for different cases, including different provision in relation to different persons in different circumstances or localities,

(b)provide for the times at which and the manner in which the payments required by the scheme are to be made, and

(c)make such incidental, supplementary and transitional provisions as appear to the Welsh Ministers to be appropriate.

(3) The NRBW may charge for the carrying out of functions conferred on it by these Regulations only as provided by an EPS charging scheme.

(4) An operator must pay a charge imposed under an EPS charging scheme on the operator and where there is a failure to do so—

(a)the notification to which the charge relates is to be treated as not having been made; and

(b)the amount of the charge an operator fails to pay may be recovered from the operator by the NRBW as a civil debt.

(5) An EPS charging scheme must be made publically available by the Welsh Ministers before it has effect.

Information notices

7.—(1) For any of the purposes mentioned in paragraph (2), the NRBW may, by notice served on an operator or the operator of an associated gasification plant (“an information notice”), require that person to furnish to the NRBW such information as is stated in the notice, in such form and within such period following service of the notice or at such time as is so stated.

(2) The purposes referred to in paragraph (1) are—

(a)investigating whether or not the operator has breached the emissions limit duty;

(b)investigating whether or not an operator has failed to comply with either or both of the duties in regulations 3 and 5;

(c)investigating whether a complete CCS system is ready for use; and

(d)investigating any of the following in relation to an associated gasification plant, for the purposes of calculating the emissions of a relevant fossil fuel plant—

(i)the carbon dioxide emissions of the associated gasification plant; and

(ii)the amount of fuel produced by the associated gasification plant and used by the relevant fossil fuel plant.

Enforcement notices

8.—(1) Where the NRBW is of the view that an operator has breached the emissions limit duty, the NRBW may serve a notice (“an enforcement notice”) on that operator.

(2) An enforcement notice may only be served in respect of a breach of the emissions limit duty in relation to—

(a)the year in which the notice is served; or

(b)the preceding year.

(3) An enforcement notice must state—

(a)the NRBW’s view under paragraph (1);

(b)the remedial action which the operator must take in respect of the breach; and

(c)the time by which the remedial action stated under sub-paragraph (b) must be taken.

(4) The time stated under paragraph (3)(c) must not be earlier than 21 days after the date of service of the enforcement notice.

(5) Subject to paragraph (6) and regulation 11, where an enforcement notice has been served on an operator, the operator must comply with the requirements of the enforcement notice.

(6) The NRBW may vary an enforcement notice at any time by further enforcement notice served on the operator.

(7) The NRBW may withdraw an enforcement notice at any time.

Civil penalty notices

9.—(1) Subject to paragraph (7), where the NRBW is of the view that an operator has breached the emissions limit duty, the NRBW may serve a notice (“a civil penalty notice”) on that operator which states the financial penalty which is payable in respect of that breach.

(2) A civil penalty notice must state—

(a)how the amount of the financial penalty imposed was calculated; and

(b)the date by which the amount payable under the civil penalty notice is to be paid in full.

(3) The financial penalty is to be set at a level that the NRBW considers will, if possible—

(a)remove any benefit derived by the operator from the breach of the emissions limit duty;

(b)be fair; and

(c)be proportionate.

(4) The financial penalty may include an amount in respect of the costs reasonably incurred by NRBW in investigating and assessing the breach of the emissions limit duty.

(5) An operator must pay the amount payable under a civil penalty notice and if it is not paid in full by the date stated in the civil penalty notice, the amount payable may be recovered from the operator by the NRBW as a civil debt.

(6) The NRBW may vary or withdraw a civil penalty notice before it has been paid by further notice served on the operator.

(7) The NRBW may not impose a financial penalty in respect of a breach of the emissions limit duty in any year which began more than 5 years before the year in which the notice imposing the penalty is served.

(8) The Welsh Ministers may issue guidance (“EPS penalty guidance”) on the calculation of financial penalties.

(9) Where EPS penalty guidance is issued, the NRBW must have regard to that guidance when calculating the amount of a financial penalty to be imposed.

(10) Before issuing guidance under paragraph (7), the Welsh Ministers must consult—

(a)the Scottish Ministers;

(b)the Secretary of State;

(c)the Department of Environment; and

(d)such other persons or bodies as the Welsh Ministers consider appropriate.

(11) Where EPS penalty guidance is issued, it must be made publically available by the Welsh Ministers before it has effect.

(12) The NRBW may state the manner and form in which any amount required to be paid by a civil penalty notice must be paid.

(13) Any sum received by the NRBW under this regulation must be paid into the Welsh Consolidated Fund.

Directions under section 59(2) of the Act

10.  Where the Secretary of State makes a direction under section 59(2) of the Act, the NRBW must—

(a)treat the emissions limit duty as suspended or modified as required by the direction; and

(b)comply with any requirement imposed on it by the direction.

Appeals

11.—(1) An operator may appeal to the First-tier Tribunal against—

(a)an enforcement notice; or

(b)a civil penalty notice.

(2) An appeal must be made within 28 days beginning with the day on which the notice subject to the appeal is served.

(3) Where an operator appeals under paragraph (1), any enforcement notice or civil penalty notice subject to that appeal is suspended until the appeal is determined by the First-tier Tribunal in accordance with paragraph (4).

(4) The First-tier Tribunal may—

(a)affirm the enforcement notice or civil penalty notice;

(b)direct the NRBW to vary or withdraw the enforcement notice or civil penalty notice; or

(c)impose such other enforcement notice or civil penalty notice as the First-tier Tribunal thinks fit.

Publication of information

12.—(1) Subject to paragraph (3), the NRBW may publish any of the information stated in paragraph (2) in relation to an enforcement notice or civil penalty notice on or after the later of—

(a)the day following expiry of the period for making an appeal against the imposition of the notice, if no appeal is made; or

(b)the determination or withdrawal of the appeal, if an appeal is made.

(2) The information referred to in paragraph (1) is—

(a)the identity of the operator subject to the enforcement notice or civil penalty notice;

(b)in the case of an enforcement notice, remedial action required to be taken to remedy the breach of the emissions limit duty;

(c)in the case of a civil penalty notice, the amount payable under the civil penalty notice; and

(d)if the notice has been the subject of an appeal under regulation 11, the result of that appeal.

(3) The NRBW must not publish the information stated in paragraph (2) in relation to an enforcement notice or civil penalty notice if—

(a)the operator is found on appeal not to have breached the emissions limit duty; or

(b)the enforcement notice or civil penalty notice has been withdrawn.

Enforcement by the High Court

13.—(1) If an operator fails to comply with a relevant obligation the High Court may, on an application by NRBW make an order requiring “the operator” to comply with the relevant obligation.

(2) The NRBW may not apply to the High Court for an order under paragraph (1) if—

(a)the time for an appeal relating to the relevant obligation has not elapsed; or

(b)any appeal relating to the relevant obligation has not been determined.

(3) In paragraph (1), “a relevant obligation” (“rhwymedigaeth berthnasol”) means any obligation included in—

(a)an information notice;

(b)an enforcement notice; or

(c)a civil penalty notice.

Amendment of the GGETS Regulations

14.—(1) At the end of regulation 46(1)(a)(ii) of the GGETS Regulations, after “;” omit “or”.

(2) After regulation 46(1)(a)(iv) of the GGETS Regulations insert—

(iv)necessary for the performance of the NRBW’s functions in Wales under the Emissions Performance Standard (Enforcement) (Wales) Regulations 2015.

Documents

15.  The Schedule (documents) has effect.

Carl Sargeant

Minister for Natural Resources, one of the Welsh Ministers

15 June 2015

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’. Dim ond yn Saesneg y mae’r fersiwn ddiwygiedig ar gael ar hyn o bryd.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed) - Saesneg: Mae'r wreiddiol Saesneg fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed)-Cymraeg:Y fersiwn Gymraeg wreiddiol o’r ddeddfwriaeth fel yr oedd yn sefyll pan gafodd ei deddfu neu ei gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill