- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
PART II CONSTRUCTION—ALL SHIPS
7.Peak and machinery space bulkheads and stern tubes Requirements for ships constructed on or after 1st September 1984
8.Construction and testing of watertight bulkheads, decks and inner bottoms Requirements for ships constructed on or after 1st September 1984
9.Construction and testing of watertight decks, trunks, tunnels, duct keels and ventilators Requirements for ships constructed on or after 1st September 1984
11.Tests of watertight doors Requirements for ships constructed on or after 1st September 1984
23.Cargo tank ventilation Requirements for tankers constructed on or after 1st September 1984
24.Ventilation of pump rooms and other enclosed spaces Requirements for tankers constructed on or after 25th May 1980
25.Inerting, ventilation and gas measurement Requirements for tankers constructed on or after 1st October 1994
26.Access to spaces in the cargo tank area of oil tankers Requirements for oil tankers constructed on or after 1st October 1994
PART VII MACHINERY INSTALLATION
37.Remote control of propulsion machinery from the navigation bridge
39.Ventilating systems in machinery spaces Requirements for ships constructed on or after 1st September 1984
40.Protection against noise Requirements for ships constructed on or after 1st September 1984
41.Communication between navigating bridge and machinery space
42.Engineers’ alarm Requirements for ships constructed on or after 1st September 1984
44.Periodically unattended machinery spaces Requirements for ships constructed on or after 1st May 1981
45.Closing of openings Requirements for tankers constructed on or after 25th May 1980 and to other ships constructed on or after 1st September 1984.
PART VII ELECTRICAL INSTALLATIONS
48.Lighting systems Requirements for ships constructed on or after 1st September 1984
49.Emergency and transitional sources of electrical power and emergency switchboards
50.Location and construction of cables Requirements for ships constructed on or after 1st September 1984
51.General precautions against shock, fire and other hazards Requirements for ships constructed on or after 26th May 1965
52.Electrical equipment in hazardous areas and spaces Requirements for ships constructed on or after 1st September 1984
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: