The Town and Country Planning (General Permitted Development) Order 1995

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

Changes over time for: PART 30

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 2 Part 30:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

PART 30 E+WTOLL ROAD FACILITIES

Class AE+W

Permitted developmentE+W

A.  Development consisting of—

(a)the setting up and the maintenance, improvement or other alteration of facilities for the collection of tolls;

(b)the provision of a hard surface to be used for the parking of vehicles in connection with the use of such facilities.

Development not permittedE+W

A.1  Development is not permitted by Class A if—

(a)it is not located within 100 metres (measured along the ground) of the boundary of a toll road;

(b)the height of any building or structure would exceed—

(i)7.5 metres excluding any rooftop structure; or

(ii)10 metres including any rooftop structure;

(c)the aggregate area of the floor space at or above ground level of any building or group of buildings within a toll collection area, excluding the floor space of any toll collection booth, would exceed 1,500 square metres.

ConditionsE+W

A.2  In the case of any article 1(5) land, development is permitted by Class A subject to the following conditions—

(a)the developer shall, before beginning the development, apply to the local planning authority for a determination as to whether the prior approval of the authority will be required to the siting, design and external appearance of the facilities for the collection of tolls;

(b)the application shall be accompanied by a written description, together with plans and elevations, of the proposed development and any fee required to be paid;

(c)the development shall not be begun before the occurrence of one of the following—

(i)the receipt by the applicant from the local planning authority of a written notice of their determination that such prior approval is not required;

(ii)where the local planning authority give the applicant notice within 28 days following the date of receiving his application of their determination that such prior approval is required, the giving of such approval; or

(iii)the expiry of 28 days following the date on which the application was received by the local planning authority without the local planning authority making any determination as to whether such approval is required or notifying the applicant of their determination;

(d)the development shall, except to the extent that the local planning authority otherwise agree in writing, be carried out—

(i)where prior approval is required, in accordance with the details approved;

(ii)where prior approval is not required, in accordance with the details submitted with the application;

and

(e)the development shall be carried out—

(i)where approval has been given by the local planning authority, within a period of five years from the date on which the approval was given;

(ii)in any other case, within a period of five years from the date on which the local planning authority were given the information referred to in sub-paragraph (b).

Interpretation of Class AE+W

A.3  For the purposes of Class A—

  • “facilities for the collection of tolls" means such buildings, structures, or other facilities as are reasonably required for the purpose of or in connection with the collection of tolls in pursuance of a toll order;

  • “ground level" means the level of the surface of the ground immediately adjacent to the building or group of buildings in question or, where the level of the surface of the ground on which it is situated or is to be situated is not uniform, the level of the highest part of the surface of the ground adjacent to it;

  • “rooftop structure" means any apparatus or structure which is reasonably required to be located on and attached to the roof, being an apparatus or structure which is–

    (a)

    so located for the provision of heating, ventilation, air conditioning, water, gas or electricity;

    (b)

    lift machinery; or

    (c)

    reasonably required for safety purposes;

  • “toll" means a toll which may be charged pursuant to a toll order;

  • “toll collection area" means an area of land where tolls are collected in pursuance of a toll order, and includes any facilities for the collection of tolls;

  • “toll collection booth" means any building or structure designed or adapted for the purpose of collecting tolls in pursuance of a toll order;

  • “toll order" has the same meaning as in Part I of the New Roads and Street Works Act 1991 M1 (new roads in England and Wales); and

  • “toll road" means a road which is the subject of a toll order.

Marginal Citations

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.