The Water and Sewerage Services (Northern Ireland) Order 2006

Changes to legislation:

The Water and Sewerage Services (Northern Ireland) Order 2006 is up to date with all changes known to be in force on or before 19 March 2024. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the affected provisions when you open the content using the Table of Contents below.

View outstanding changes

Changes and effects yet to be applied to :

  • art. 23(1A)(b) words substituted by S.I. 2019/93, Sch. 1 para. 12A(2) (as substituted) by S.I. 2019/1245 reg. 27 (This amendment not applied to legislation.gov.uk. The affecting statutory instrument has no legal effect. It was made under a procedure which meant that it ceased to have effect 28 days after signing unless it was debated and approved in Parliament within that time. It was not debated and approved within 28 days, so it has expired with no effect.)
  • art. 27(6A)(b) words substituted by S.I. 2019/93, Sch. 1 para. 12A(3) (as substituted) by S.I. 2019/1245 reg. 27 (This amendment not applied to legislation.gov.uk. The affecting statutory instrument has no legal effect. It was made under a procedure which meant that it ceased to have effect 28 days after signing unless it was debated and approved in Parliament within that time. It was not debated and approved within 28 days, so it has expired with no effect.)
  • art. 29(3)(a) word inserted by S.I. 2019/93 Sch. 1 para. 12(2) (This amendment not applied to legislation.gov.uk. Sch. 1 para. 12(2)(3) substituted immediately before IP completion day by S.I. 2020/1343, regs. 1(1), 24)
  • art. 29(3)(a) word inserted by S.I. 2019/93, Sch. 1 para. 12A(4)(a) (as substituted) by S.I. 2019/1245 reg. 27 (This amendment not applied to legislation.gov.uk. The affecting statutory instrument has no legal effect. It was made under a procedure which meant that it ceased to have effect 28 days after signing unless it was debated and approved in Parliament within that time. It was not debated and approved within 28 days, so it has expired with no effect.)
  • art. 29(3)(c) omitted by S.I. 2019/93 Sch. 1 para. 12(3) (This amendment not applied to legislation.gov.uk. Sch. 1 para. 12(2)(3) substituted immediately before IP completion day by S.I. 2020/1343, regs. 1(1), 24)
  • art. 29(3)(c)(d) omitted by virtue of S.I. 2019/93, Sch. 1 para. 12A(4)(b) (as substituted) by S.I. 2019/1245 reg. 27 (This amendment not applied to legislation.gov.uk. The affecting statutory instrument has no legal effect. It was made under a procedure which meant that it ceased to have effect 28 days after signing unless it was debated and approved in Parliament within that time. It was not debated and approved within 28 days, so it has expired with no effect.)
  • art. 29(3)(d) omitted by S.I. 2019/93 Sch. 1 para. 12(3) (This amendment not applied to legislation.gov.uk. Sch. 1 para. 12(2)(3) substituted immediately before IP completion day by S.I. 2020/1343, regs. 1(1), 24)
  • art. 293(6) words substituted by 2015 c. 8 (N.I.) Sch. 3 para. 2(a)
  • art. 297 omitted by 2015 c. 8 (N.I.) Sch. 3 para. 3 Sch. 4
  • art. 300(1)(b) words omitted by 2015 c. 8 (N.I.) Sch. 3 para. 4 Sch. 4

Changes and effects yet to be applied to the whole Order associated Parts and Chapters:

Whole provisions yet to be inserted into this Order (including any effects on those provisions):

  1. Introductory Text

  2. PART I INTRODUCTORY

    1. 1.Title and commencement

    2. 2.Interpretation

  3. PART II REGULATORY AUTHORITIES AND GENERAL DUTIES

    1. The Northern Ireland Authority for Utility Regulation

      1. 3.The Authority

      2. 4.Forward work programme of the Authority

      3. 5.Annual report of the Authority

    2. General duties

      1. 6.General duties with respect to water industry

      2. 7.Guidance on social and environmental matters

      3. 8.General environmental and recreational duties

      4. 9.Environmental duties with respect to areas of special interest

      5. 10.Codes of practice with respect to environmental and recreational duties

      6. 11.Co-operation between water regulators

      7. 12.General duties with respect to the water industry

  4. PART III APPOINTMENT AND REGULATION OF UNDERTAKERS

    1. CHAPTER I APPOINTMENTS

      1. Making of appointments

        1. 13.Appointment of relevant undertakers

        2. 14.Continuity of appointments, replacement appointments, etc.

        3. 15.Procedure with respect to appointments and variations

        4. 16.Duties affecting making of appointments and variations

        5. 17.Transitional provision with respect to replacement appointments

      2. Conditions of appointment

        1. 18.Power to impose conditions

        2. 19.Determinations under conditions of appointment

      3. Modification of appointment conditions

        1. 20.Modification by agreement

        2. 21.Modification references to CMA

        3. 22.References under Article 21: time limits

        4. 23.References under Article 21: powers of investigation

        5. 24.Reports on modification references

        6. 25.Modifications following report

        7. 26.CMA's power of veto following report

        8. 27.CMA's power of veto following report: supplementary

        9. 28.Modification by order under other statutory provisions

      4. Competition

        1. 29.Functions of the Authority with respect to competition

    2. CHAPTER II ENFORCEMENT AND INSOLVENCY

      1. Enforcement orders

        1. 30.Orders for securing compliance with certain provisions

        2. 31.Exceptions to the duty to enforce

        3. 32.Procedure for enforcement orders

        4. 33.Validity and effect of enforcement orders

        5. 34.Effect of enforcement order

      2. Financial penalties

        1. 35.Financial penalties

        2. 36.Statement of policy with respect to penalties

        3. 37.Time limits on the imposition of financial penalties

        4. 38.Interest and payment of instalments

        5. 39.Appeals

        6. 40.Recovery of penalties

      3. Special administration orders

        1. 41.Meaning and effect of special administration order

        2. 42.Special administration orders made on application of Department or Authority

        3. 43.Power to make special administration order on winding-up petition

      4. Restrictions on voluntary winding up and insolvency proceedings

        1. 44.Restrictions on voluntary winding up and insolvency proceedings

    3. CHAPTER III CONSUMER PROTECTION: THE GENERAL CONSUMER COUNCIL

      1. 45.The General Consumer Council: preliminary

      2. 46.Forward work programme of the Council

      3. 47.Co-operation between the Council and other authorities

      4. 48.Acquisition and review of information

      5. 49.Provision of advice and information to public authorities and other persons

      6. 50.Provision of information to consumers

      7. 51.Power to publish information and advice about consumer matters

      8. 52.Provision of information to the Council

      9. 53.Provision of information by the Council

      10. 54.Articles 52 and 53: supplementary

      11. 55.Consumer complaints

      12. 56.Power of the Council to investigate other matters

      13. 57.Restrictions on disclosure of information by the Council

      14. 58.Duty to consult the Council

      15. 59.Provision of statistical information about complaints

    4. CHAPTER IV MISCELLANEOUS AND SUPPLEMENTARY

      1. Miscellaneous

        1. 60.General duty of the Authority to keep matters under review

        2. 61.Determination of disputes by the Authority

        3. 62.Remuneration and standards of performance

        4. 63.Procedure for dealing with complaints

      2. Supplementary

        1. 64.Interpretation of Part III

  5. PART IV WATER SUPPLY

    1. CHAPTER I GENERAL DUTIES OF WATER UNDERTAKERS

      1. General water supply duties

        1. 65.General duty to maintain water supply system, etc.

        2. 66.Standards of performance in connection with water supply

        3. 67.Information with respect to levels of performance

        4. 68.Information to be given to customers about overall performance

        5. 69.Procedure for making regulations under Article 66

      2. Water resource management and drought plans

        1. 70.Water resources management plans: preparation ...

        2. 70A.Water resources management plans: review, consultation, etc.

        3. 71.Water resources management plans: publication and representations

        4. 72.Water resources management plans: supplementary

        5. 73.Drought plans: preparation ...

        6. 73A.Combination of water resources management plans and drought plans

    2. CHAPTER II SUPPLY DUTIES

      1. Major supplies

        1. 74.Bulk supplies

        2. 75.Variation and termination of bulk supply agreements

        3. 76.Duty to comply with water main requisition

        4. 77.Financial conditions of compliance

        5. 78.Determination of completion date and routes for requisitioned main

      2. Domestic connections

        1. 79.Duty to make connections with main

        2. 80.Duty to carry out ancillary works for the purpose of making domestic connection

        3. 81.Conditions of connection concerning metering

        4. 82.Conditions of connection with water main

        5. 83.Interest on sums deposited in pursuance of the deposit condition

        6. 84.Restrictions on imposition of condition requiring separate service pipes

        7. 85.Time for performance of connection etc. duties

      3. Adoption of water mains and service pipes

        1. 86.Agreements to adopt water main or service pipe at a future date

        2. 87.Appeals with respect to adoption

        3. 88.Financial conditions of compliance

        4. 89.Prohibition on connection without adoption

        5. 90.Articles 86 to 89: supplementary

      4. Domestic supplies

        1. 91.The domestic supply duty

        2. 92.Conditions of compliance with domestic supply duty

        3. 93.Enforcement of domestic supply duty

      5. Other supplies

        1. 94.Supplies for non-domestic purposes

        2. 95.Determinations on requests for non-domestic supplies

        3. 96.Duty to provide a supply of water etc. for fire-fighting

        4. 97.Specially requested fire hydrants

        5. 98.Supplies for other public purposes

      6. Disconnections

        1. 99.Disconnections for the carrying out of necessary works

        2. 100.Disconnections for non-payment of charges

        3. 101.Disconnections at request of customer

        4. 102.General duties of undertakers with respect to disconnections

      7. Use of limiting devices

        1. 103.Prohibition of use of limiting devices

      8. Means of supply

        1. 104.Supply by means of separate service pipes

        2. 105.Duties of undertakers as respects constancy and pressure

        3. 106.Requirements by undertaker for maintaining pressure

    3. CHAPTER III QUALITY AND SUFFICIENCY OF SUPPLY

      1. Standards of wholesomeness

        1. 107.Standards of wholesomeness

      2. General obligations of water undertakers

        1. 108.Duties of water undertakers with respect to water quality

        2. 109.Regulations for preserving water quality

        3. 110.Offence of supplying water unfit for human consumption

      3. Waste, contamination, misuse, etc.

        1. 111.Waste from water sources

        2. 112.Contamination of water sources

        3. 113.Offences of contaminating, wasting and misusing water, etc.

        4. 114.Regulations for preventing contamination, waste, etc and with respect to water fittings

        5. 115.Power to prevent damage and to take steps to prevent contamination, waste, etc.

        6. 116.Temporary hosepipe bans

      4. Insufficient or unwholesome piped supplies

        1. 117.Functions of the Department where piped supplies insufficient or unwholesome

      5. Private supplies

        1. 118.General functions of DOE in relation to private supplies

        2. 119.Remedial powers in relation to private supplies

        3. 120.Confirmation of private supply notices

        4. 121.Enforcement and variation of private supply notice

        5. 122.Powers to do works in relation to private supplies

        6. 123.Power of DOE to obtain information relating to private supplies

      6. Enforcement

        1. 124.Rights of entry

        2. 125.Assessors for the enforcement of water quality

    4. CHAPTER IV FLUORIDATION

      1. 126.Fluoridation of water supplies at request of DHSSPS

      2. 127.Target concentration of fluoride

      3. 128.Fluoridation arrangements: determination of terms

      4. 129.Fluoridation arrangements: compliance

      5. 130.Power to vary permitted fluoridation agents

      6. 131.Power to vary target concentration of fluoride

      7. 132.Consultation

      8. 133.Indemnities in respect of fluoridation

      9. 134.Review of fluoridation

    5. CHAPTER V SUPPLEMENTAL PROVISIONS OF PART IV

      1. 135.Power to give effect to international agreements etc.

      2. 136.Interpretation

  6. PART V USE OF WATER

    1. CHAPTER I DROUGHT

      1. Drought orders

        1. 137.Power to make drought orders

        2. 138.Provisions and duration of drought order

        3. 139.Provisions of drought order restricting use of water

        4. 140.Provisions of drought order with respect to abstraction and discharges

        5. 141.Works under drought orders

        6. 142.Compensation and charges where drought order made

        7. 143.Offences against drought order

      2. Interpretation

        1. 144.Interpretation of this Chapter

    2. CHAPTER II PROMOTION OF THE EFFICIENT USE OF WATER

      1. 145.Duty to promote efficient use of water

      2. 146.Power of the Authority to impose requirements on water undertakers

      3. 147.Publicity of requirements imposed under Article 146

      4. 148.Information as to compliance with requirements under Article 146

  7. PART VI SEWERAGE SERVICES

    1. CHAPTER I GENERAL FUNCTIONS OF SEWERAGE UNDERTAKERS

      1. Principal duties and standards of performance

        1. 149.General duty to provide sewerage system

        2. 150.Standards of performance in connection with provision of sewerage services

        3. 151.Information with respect to levels of performance

        4. 152.Procedure for regulations under Article 150

        5. 153.Information to be given to customers about overall performance

    2. CHAPTER II PROVISION OF SEWERAGE SERVICES

      1. Requisition of public sewer or lateral drain

        1. 154.Duty to comply with sewer and lateral drain requisition

        2. 155.Financial conditions of compliance

        3. 156.Determination of completion date and route for requisitioned sewer or lateral drain

      2. Provision of sewers other than by requisition

        1. 157.Further duty to provide sewers

        2. 158.Power to construct lateral drains following provision of public sewer

      3. Adoption of sewers , sustainable drainage systems and waste water treatment works

        1. 159.Adoption of sewers , sustainable drainage systems and waste water treatment works

        2. 160.Adoption under Article 159: supplementary

        3. 161.Agreements to adopt sewer, drain , sustainable drainage system or waste water treatment works at future date

        4. 162.Appeals with respect to adoption

      4. Communication of drains and private sewers with public sewers

        1. 163.Right to communicate with public sewers

        2. 163A.Communication as of right only where adoption agreement entered into

        3. 164.Right of sewerage undertaker to undertake the making of communications with public sewers

        4. 165.Communication works by person entitled to communication

        5. 166.Unlawful communications

      5. Connections between public sewers

        1. 167.New connections with public sewers

      6. Provisions protecting public sewers

        1. 168.Restrictions on use of public sewers

        2. 169.Requirement that proposed drain , sewer or sustainable drainage system be constructed so as to form part of general system

        3. 170.Power to alter drainage system of premises in area

        4. 171.Power to investigate defective drain , sewer or sustainable drainage system

      7. Use of pipes for sewerage purposes

        1. 172.Use of road drains as sewers and vice versa

        2. 173.Power to close or restrict use of public sewer

      8. Interpretation of Chapter II

        1. 174.Interpretation of Chapter II

    3. CHAPTER III TRADE EFFLUENT

      1. Consent for discharge of trade effluent into public sewer

        1. 175.Consent required for discharge of trade effluent into public sewer

      2. Consents on an application

        1. 176.Application for consent

        2. 177.Transfer of consent

        3. 178.Applications for the discharge of special category effluent

        4. 179.Conditions of consent

        5. 180.Appeals to the Authority with respect to decisions on applications etc.

        6. 181.Appeals with respect to the discharge of special category effluent

        7. 182.Variation of consents

        8. 183.Variations within time limit

        9. 184.Appeals with respect to variations of consent

        10. 185.Review by DOE of consents relating to special category effluent

      3. Application for variation of time for discharge

        1. 186.Application for variation of time for discharge

      4. Agreements with respect to the disposal etc. of trade effluent

        1. 187.Agreements with respect to the disposal etc. of trade effluent

        2. 188.Reference to DOE of agreements relating to special category effluent

        3. 189.Review by DOE of agreements relating to special category effluent

      5. References and reviews relating to special category effluent

        1. 190.Powers and procedure on references and reviews

        2. 191.Effect of determination on reference or review

        3. 192.Compensation in respect of determinations made for the protection of public health etc.

      6. Supplemental provisions of Chapter III

        1. 193.Restrictions on power to fix charges under Chapter III

        2. 194.Power of DOE to require information for the purpose of its functions in relation to special category effluent

        3. 195.Evidence from meters etc.

        4. 196.Statement of case on appeal

        5. 197.Meaning of “special category effluent”

        6. 198.Power to apply Chapter III to specified activities

      7. Interpretation of Chapter III

        1. 199.Interpretation of Chapter III

  8. PART VII FINANCIAL PROVISIONS

    1. CHAPTER I CHARGES

      1. Manner of fixing charges

        1. 200.Powers of undertakers to charge

        2. 201.Charges schemes

        3. 202.Regulations as to provisions to be included in charges schemes

        4. 203.Liability for charges

        5. 204.Right of consumer to elect for charging by reference to volume

        6. 205.Restriction on undertakers' power to require fixing of charges by reference to volume

        7. 206.Connection charges

        8. 207.Charging for emergency use of water

      2. Metering

        1. 208.Restriction on charging for metering works

        2. 209.Further provisions relating to charging by volume

      3. Charging for services provided with the help of an undertaker

        1. 210.Fixing maximum charges for services provided with the help of undertakers' services

        2. 211.Billing disputes

        3. 212.Interpretation of Chapter I

    2. CHAPTER II FINANCIAL ASSISTANCE FOR UNDERTAKERS

      1. 213.Grants by the Department to relevant undertakers

      2. 214.Financial assistance where special administration orders made

  9. PART VIII UNDERTAKERS' POWERS AND WORKS

    1. CHAPTER I UNDERTAKERS' POWERS

      1. Abstraction and impounding of water

        1. 215.Abstraction and impounding of water

      2. Powers in relation to land

        1. 216.Compulsory acquisition

        2. 217.Restriction on disposals of land

        3. 218.Byelaws with respect to undertakers' waterways and land

      3. Pipe-laying

        1. 219.Power to lay pipes in a street

        2. 220.Power to lay pipes in other land

      4. Other works powers

        1. 221.Power to carry out works and discharge surface water for sewerage purposes

        2. 222.Power to deal with foul water and pollution

        3. 223.Works in connection with metering

        4. 224.Power to fit stopcocks

        5. 225.Agreements for works with respect to water sources

      5. Powers to discharge water

        1. 226.Discharges for works purposes

        2. 227.Consents for certain discharges under Article 226

      6. Compulsory works orders

        1. 228.Compulsory works orders

      7. Entry to land, etc. by relevant undertakers

        1. 229.Entry for works purposes

        2. 230.Power to carry out surveys and search for water

        3. 231.Entry etc. for other purposes

        4. 232.Entry for sewerage purposes

        5. 233.Entry for metering purposes

        6. 234.Regulations as to taking of, and dealing with, samples

        7. 235.Impersonation of persons entitled to entry

    2. CHAPTER II PROTECTION OF UNDERTAKERS' WORKS, APPARATUS, ETC.

      1. Protection of apparatus in general

        1. 236.Offences of interference with works, etc.

      2. Protection of meters

        1. 237.Offence of tampering with a meter

        2. 238.Consent for the purposes of Article 237

        3. 239.Financial obligations with respect to any interference with a meter

        4. 240.Obstruction of works, etc.

    3. CHAPTER III SUPPLEMENTAL PROVISIONS WITH RESPECT TO UNDERTAKERS' POWERS

      1. Vesting of works in undertaker

        1. 241.Vesting of works in undertaker

        2. 242.Compensation for loss or damage caused by works etc.

        3. 243.Complaints with respect to the exercise of works powers on private land, etc

        4. 244.Codes of practice with respect to work on private land

        5. 245.Protection for particular undertakings

        6. 246.Power of certain undertakers to alter public sewers, etc.

        7. 247.Duty to move pipes etc. in certain cases

        8. 248.Protective provisions in respect of watercourses etc.

        9. 249.Works in tidal lands etc.

        10. 250.Power to sell materials deriving from works

        11. 251.Rights as to sewage

      2. Interpretation

        1. 252.Interpretation of Part VIII

  10. PART IX INFORMATION

    1. Registers, maps etc

      1. 253.The Authority's register

      2. 254.Reasons for decisions

      3. 255.Trade effluent registers

      4. 256.Register for the purposes of works discharges

      5. 257.Maps of waterworks

      6. 258.Sewer maps

    2. Publication of certain information and advice

      1. 259.Publication of certain information and advice

    3. Powers to acquire and duties to provide information

      1. 260.Duties of undertakers to provide the Department with information

      2. 261.Power to require information for enforcement purposes

      3. 262.Provision of information to sewerage undertakers with respect to trade effluent discharges

      4. 263.Exchange of metering information between undertakers

      5. 264.Information sharing for purposes of special provision in charges scheme

    4. Restriction on disclosure of information

      1. 265.Restriction on disclosure of information

      2. 266.Unauthorised disclosure of information relating to particular persons

    5. Provision of false information

      1. 267.Provision of false information

  11. PART X REORGANISATION OF THE INDUSTRY

    1. Introductory

      1. 268.Interpretation of this Part

    2. The successor company

      1. 269.The successor company

    3. Transfer to successor company of certain assets and liabilities of the Department

      1. 270.Transfer scheme

    4. Ownership of the successor company

      1. 271.Initial Departmental holding in the successor company

      2. 272.Departmental investment in securities of the successor company

      3. 273.Disposal of securities, etc

      4. 274.Exercise of Departmental powers through nominees

    5. Finances of the successor company

      1. 275.Statutory reserves

      2. 276.Accounts, etc. of successor company

      3. 277.Restrictions on borrowing, charging, etc.

      4. 278.Departmental lending, guarantees, etc.

      5. 279.Exercise of certain functions of the Department under this Part

  12. PART XI AMENDMENTS TO THE WATER ORDER

    1. 280.Pollution of water

    2. 281.Relationship of Part II of Water Order with other statutory provisions

    3. 282.Charges for transfer of discharge consent

    4. 283.Anti-pollution works

    5. 284.Provision of information

    6. 285.Restriction on disclosure of information

    7. 286.Civil liability

    8. 287.Liability to prosecution for certain offences

    9. 288.Application of Part II of the Water Order to the Crown

    10. 289.Matters to be taken into account in exercising certain functions under Part III of Water Order

    11. 290.Discharge consents

    12. 291.Minor amendments

  13. PART XII MISCELLANEOUS AND SUPPLEMENTAL

    1. The Water Appeals Commission

      1. 292.The Water Appeals Commission

      2. 293.Procedure of the Appeals Commission

    2. Miscellaneous

      1. 294.Directions in the interests of national security

      2. 295.Directions for preserving services or mitigating effects of emergency

      3. 296.Abolition of Northern Ireland Water Council

      4. 297.Safety of reservoirs

      5. 298.Civil liability of water undertaker for escape of water, etc

    3. Supplemental

      1. 299.Prosecutions

      2. 300.Regulations

      3. 301.Directions

      4. 301A.Consent to receive notices or other documents by electronic communication

      5. 302.Power to prescribe forms

      6. 302A.Transitional provisions (Environmental Better Regulation Act (Northern Ireland) 2016)

      7. 303.Local inquiries

      8. 304.Construction of provision conferring powers by reference to undertakers' functions

      9. 305.Local statutory provisions

      10. 306.Supplementary, incidental, consequential, transitional provision etc.

      11. 307.Application to the Crown

      12. 308.Amendments and repeals

  14. Signature

  15. SCHEDULES

    1. SCHEDULE 1

      TRANSITIONAL PROVISION ON TERMINATION OF APPOINTMENTS

      1. Cases where Schedule applies

        1. 1.(1) This Schedule applies in each of the cases specified...

      2. Making and effect of scheme

        1. 2.(1) The existing appointee, acting with the consent of the...

      3. Contents of scheme

        1. 3.(1) A scheme under this Schedule— (a) shall specify the...

      4. Transfer of appointment

        1. 4.(1) Where a scheme under this Schedule is made in...

      5. Employment contracts

        1. 5.(1) This paragraph applies if rights and liabilities under a...

      6. Effect on third parties

        1. 6.(1) Sub-paragraph (2) applies where (apart from that sub-paragraph) a...

      7. External assets, etc.

        1. 7.(1) This paragraph applies in any case where a scheme...

      8. Further transitional provision

        1. 8.(1) The Department may, if it thinks it appropriate to...

    2. SCHEDULE 2

      PREMISES NOT TO BE DISCONNECTED FOR NON-PAYMENT OF CHARGES

      1. 1.(1) Any dwelling which is occupied by a person as...

      2. 2.(1) Any house in multiple occupation which does not constitute...

      3. 3.(1) Accommodation for the elderly in which a person has...

      4. 4.A hospital within the meaning of Article 2(2) of the...

      5. 5.(1) Premises used— (a) for the provision of primary medical...

      6. 6.Any of the following (within the meaning of the Health...

      7. 7.A school within the meaning of the Education and Libraries...

      8. 8.(1) Premises used by— (a) an institution of further education...

      9. 9.Premises used for the provision of day care for children...

      10. 10.A prison, young offenders centre or juvenile justice centre.

      11. 11.Any premises which are used solely for detaining persons under...

      12. 12.Premises occupied for the purposes of the police.

      13. 13.Premises occupied for the purposes of the Northern Ireland Fire...

      14. 14.Premises occupied for the purposes of the provision of an...

    3. SCHEDULE 3

      PROCEDURE FOR ORDERS RELATING TO PRESSURE AND CONSTANCY

      1. Applications for orders

        1. 1.(1) Where the Authority or a water undertaker applies to...

      2. Supply of copies of draft orders

        1. 2.The applicant for an order under Article 105(5) shall, at...

      3. Modifications of proposals

        1. 3.(1) On an application for an order under Article 105(5),...

      4. Consideration of objections, etc.

        1. 4.Where an application for an order to which this Schedule...

    4. SCHEDULE 4

      RIGHTS OF ENTRY

      1. PART I RIGHTS REQUIRING NOTICE FOR ENTRY TO NON-BUSINESS PREMISES

        1. Notice of entry

          1. 1.(1) Where this Part of this Schedule applies to any...

        2. Warrants to exercise right

          1. 2.(1) Subject to sub-paragraph (3), if it is shown to...

        3. Supplementary power of person making entry

          1. 3.Any person entitled to enter any premises by virtue of...

        4. Obstruction of person exercising right

          1. 4.Any person who intentionally obstructs any person upon whom a...

        5. Duty of persons exercising rights to maintain confidentiality

          1. 5.(1) Without prejudice to Article 265 and subject to sub-paragraphs...

      2. PART II OTHER RIGHTS OF ENTRY AND RELATED POWERS

        1. Notice of Entry

          1. 6.(1) Without prejudice to any power exercisable by virtue of...

        2. Warrant to exercise right or power

          1. 7.(1) If it is shown to the satisfaction of a...

        3. Manner of exercise of right or power

          1. 8.A person designated as the person who may exercise any...

        4. Supplementary powers of person making entry, etc.

          1. 9.A person authorised to enter any premises by virtue of...

        5. Duty to secure premises

          1. 10.A person who enters any premises in the exercise of...

        6. Compensation

          1. 11.(1) Where any person exercises any right or power to...

        7. Obstruction of person exercising right or power

          1. 12.A person who intentionally obstructs another person acting in the...

        8. Interpretation of Part II

          1. 13.(1) In this Part of this Schedule “relevant authority”, in...

    5. SCHEDULE 5

      PROCEEDINGS ON APPLICATION FOR A DROUGHT ORDER

      1. Notice of application for drought order

        1. 1.(1) The applicant for a drought order shall—

      2. Objections to, and making of, drought order

        1. 2.(1) If any objection is duly made with respect to...

      3. Notice after making of drought order

        1. 3.After a drought order has been made, the person on...

    6. SCHEDULE 6

      COMPENSATION IN RESPECT OF DROUGHT ORDERS

      1. Cases where compensation payable

        1. 1.(1) Where a drought order has been made, compensation in...

      2. Claims for compensation

        1. 2.(1) A claim for compensation under this Schedule shall be...

        2. 3.(1) A claim for compensation under paragraph 1(2) to (5)...

    7. SCHEDULE 7

      COMPULSORY ACQUISITION OF LAND

      1. PART I COMPULSORY ACQUISITION OF LAND BY RELEVANT UNDERTAKERS

        1. 1.(1) Where a relevant undertaker proposes to acquire, otherwise than...

        2. 2.(1) Except with the consent of the Authority, no application...

        3. 3.(1) The power to make a vesting order under paragraph...

        4. 4.(1) Nothing in this Schedule shall authorise the acquisition, without...

        5. 5.Schedule 6 to the Local Government Act (Northern Ireland) 1972...

      2. PART II LAND OF RELEVANT UNDERTAKERS EXCLUDED FROM COMPULSORY PURCHASE

        1. 6.Where— (a) an application for a vesting order is made...

    8. SCHEDULE 8

      PROCEDURE RELATING TO BYELAWS UNDER ARTICLE 218

      1. Confirmation of byelaws

        1. 1.(1) Byelaws made by a relevant undertaker under Article 218...

      2. Confirmation with or without modifications

        1. 2.(1) Subject to the following sub-paragraphs, where byelaws are submitted...

      3. Commencement of byelaws

        1. 3.(1) The Department may fix the date on which any...

      4. Availability of confirmed byelaws

        1. 4.(1) Byelaws made by a relevant undertaker and confirmed under...

      5. Revocation of byelaws

        1. 5.Without prejudice to paragraph (5) of Article 218, if it...

      6. Proof of byelaws etc.

        1. 6.The production of a printed copy of byelaws purporting to...

    9. SCHEDULE 9

      ORDERS CONFERRING COMPULSORY WORKS POWERS

      1. Applications for orders

        1. 1.(1) Where a water undertaker applies to the Department for...

      2. Supply of copies of draft orders

        1. 2.A water undertaker applying for a compulsory works order shall,...

      3. Powers on an application

        1. 3.(1) On an application for a compulsory works order, the...

      4. Consideration of objections etc.

        1. 4.(1) If, where an application for a compulsory works order...

      5. Notice after making of order

        1. 5.(1) As soon as practicable after a compulsory works order...

      6. Compulsory acquisition provisions

        1. 6.The statutory provisions for the time being in force with...

      7. Compensation in respect of powers other than acquisition powers

        1. 7.(1) If the value of any estate in any relevant...

      8. Protection of public undertakings

        1. 8.The provisions of Article 248 and of Part I of...

      9. Interpretation

        1. 9.In this Schedule— “compulsory works order” means an order under...

    10. SCHEDULE 10

      PROTECTIVE PROVISIONS IN RESPECT OF CERTAIN UNDERTAKINGS

      1. PART I PROVISIONS APPLYING GENERALLY

        1. General provisions protecting undertakings

          1. 1.(1) Nothing in this Order conferring power on a relevant...

        2. Protection for statutory powers and jurisdiction

          1. 2.Nothing in any provision of this Order conferring power on...

        3. Special protection for certain undertakings in respect of street works

          1. 3.(1) Subject to the following provisions of this paragraph and...

        4. Protection for electronic communications networks

          1. 4.Part 10 of Schedule 3A to the Communications Act 2003...

      2. PART II FURTHER PROTECTIVE PROVISIONS IN RESPECT OF SEWERAGE POWERS

        1. Protection for airports, railways etc.

          1. 5.(1) Subject to the provisions of this paragraph, nothing in...

        2. Saving for Part I and other powers

          1. 6.The provisions of this Part of this Schedule are without...

    11. SCHEDULE 11

      THE TRANSFER SCHEME

      1. Interpretation

        1. 1.(1) In this Schedule— “specified” means specified in the transfer...

      2. Contents of transfer scheme

        1. 2.(1) The transfer scheme— (a) shall specify the assets and...

      3. Modification of the transfer scheme

        1. 3.(1) If, at any time after the transfer date but...

      4. Proof of title by certificate

        1. 4.A certificate issued by the Department to the effect that—...

      5. Employment contracts

        1. 5.(1) This paragraph applies if rights and liabilities under a...

      6. Effect on third parties

        1. 6.(1) Sub-paragraph (2) applies where (apart from that sub-paragraph) a...

      7. Compensation

        1. 7.(1) Where, in consequence of any provision included in a...

      8. External assets etc.

        1. 8.(1) This paragraph applies in any case where the transfer...

    12. SCHEDULE 12

      AMENDMENTS

      1. The Public Health (Ireland) Act 1878 (c. 52)

        1. 1.(1) In section 2 for the definition of “sewer” substitute—...

      2. The Water Supplies and Sewerage Act (Northern Ireland) 1945 (c. 17)

        1. 2.(1) In section 4(1)(a) for “the Ministry of Development” substituted...

      3. The Requisitioned Land and War Works Act 1948 (c. 17)

        1. 3.The undertaking of a relevant undertaker shall be deemed to...

      4. The Interpretation Act (Northern Ireland) 1954 (c. 33)

        1. 4.In section 46(1) at the appropriate places in alphabetical order...

      5. The Lough Neagh and Lower Bann Drainage and Navigation Act (Northern Ireland) 1955 (c. 15)

        1. 5.In section 2(1)(a) at the end add “ and every...

      6. The Nuclear Installations Act 1965 (c. 57)

        1. 6.In section 27(1)(c), in the substituted paragraph (ca), after “Northern...

      7. The Fisheries Act (Northern Ireland) 1966 (c. 17)

        1. 7.In section 11A(5) for “Article 9(1)” substitute “ Article 7A(3)(a)...

      8. The Mineral Development Act (Northern Ireland) 1969 (c. 35)

        1. 8.(1) For the purposes of section 40, where pipes in...

      9. The Land Registration Act (Northern Ireland) 1970 (c. 18)

        1. 9.In Schedule 11 for paragraph 28 substitute— Any of the following matters under the Water and Sewerage...

      10. The Drainage (Northern Ireland) Order 1973 (NI 1)

        1. 10.(1) In Article 2(2), in the definition of “the Commission”,...

      11. The Northern Ireland Assembly Disqualification Act 1975 (c. 25)

        1. 11.(1) In Part II of Schedule 1, in the entry...

      12. The Rates (Northern Ireland) Order 1977 (NI 28)

        1. 12.(1) In Article 39E(1)(a), for “for the purposes of water...

      13. The Health and Safety at Work (Northern Ireland) Order 1978 (NI 9)

        1. 13.(1) In Article 30(3)(c) at the end add—

      14. The Pollution Control and Local Government (Northern Ireland) Order 1978 (NI 19)

        1. 14.(1) In Article 42(2)(a) for the words “or the Water...

      15. The Statutory Rules (Northern Ireland) Order 1979 (NI 12)

        1. 15.In Part I of Schedule 1, in the entry relating...

      16. The Housing (Northern Ireland) Order 1981 (NI 3)

        1. 16.In Article 88E(2)(b) for “or electricity” substitute “ electricity, water...

      17. The Judgments Enforcement (Northern Ireland) Order 1981 (NI 6)

        1. 17.(1) In Article 2(2), in the definition of “company”, at...

      18. The Civil Aviation Act 1982 (c. 16)

        1. 18.(1) For the purposes of the Civil Aviation Act 1982,...

      19. The Telecommunications Act 1984 (c. 12)

        1. 19.(1) In section 98(9)— (a) in paragraph (c) of the...

      20. The General Consumer Council (Northern Ireland) Order 1984 (NI 12)

        1. 20.In Schedule 1, in paragraph 10(8) after “consultation with” insert...

      21. The Nature Conservation and Amenity Lands (Northern Ireland) Order 1985 (NI 1)

        1. 21.(1) A water undertaker or sewerage undertaker shall be deemed...

      22. The Wildlife (Northern Ireland) Order 1985 (NI 2)

        1. 22.In Article 3(1), in the definition of “authorised person” after...

      23. The Airports Act 1986 (c. 31)

        1. 23.In section 74(3) at the end add—

      24. The Companies (Northern Ireland) Order 1986 (NI 6)

        1. 24.In Articles 418(5)(a) and 453(2) after “under this Order” insert...

      25. The Business Names (Northern Ireland) Order 1986 (NI 7)

        1. 25.In Article 3(1)(c) after “Order 1986” insert “ (or which...

      26. The Consumer Protection (Northern Ireland) Order 1987 (NI 20)

        1. 26.In Article 29(3) at the end add—

      27. The Insolvency (Northern Ireland) Order 1989 (NI19)

        1. 27.(1) In Article 197(3) for sub-paragraph (b) substitute—

      28. The Food Safety (Northern Ireland) Order 1991 (NI 7)

        1. 28.In Article 50(1) for the words from “the Department of...

      29. The Planning (Northern Ireland) Order 1991 (NI 11)

        1. 29.(1) In Article 2(2), at the end of the definition...

      30. The Social Security Administration (Northern Ireland) Act 1992 (c. 8)

        1. 30.(1) In section 103B (2A) after paragraph (h) insert—

      31. The Electricity (Northern Ireland) Order 1992 (NI 1)

        1. 31.(1) In Schedule 4— (a) in paragraph 1(1) in the...

      32. The Radioactive Substances Act 1993 (c. 12)

        1. 32.(1) In section 47(1), in paragraph (c) of the definition...

      33. The Roads (Northern Ireland) Order 1993 (NI 15)

        1. 33.In Article 2(2), in the definition of “statutory undertaker”, after...

      34. The Airports (Northern Ireland) Order 1994 (NI 1)

        1. 34.In Article 49(3) at the end add—

      35. The Street Works (Northern Ireland) Order 1995 (NI 19)

        1. 35.(1) In Article 7(5)(a) for “the Department” substitute “ the...

      36. The Gas (Northern Ireland) Order 1996 (NI 2)

        1. 36.In Schedule 3— (a) in paragraph 1(1) in the definition...

      37. The Ombudsman (Northern Ireland) Order 1996 (NI 8)

        1. 37.(1) In Schedule 2 , in the entry relating to...

      38. The Industrial Pollution Control (Northern Ireland) Order 1997(NI 18)

        1. 38.In Article 2(11)(c) for “1973” substitute “ 2006 ”.

      39. Waste and Contaminated Land (Northern Ireland) Order 1997 (NI 19)

        1. 39.(1) In Article 20 for paragraph (6) substitute—

      40. The Water (Northern Ireland) Order 1999 (NI 6)

        1. 40.(1) In Article 32(12) for “to (9)” substitute “ and...

      41. The Postal Services Act 2000 (c. 26)

        1. 41.In Schedule 7 in paragraph 3(3)(hh), for “1973” substitute “...

      42. The Utilities Act 2000 (c. 27)

        1. 42.In section 105(6)(l) at the end add “ or the...

      43. The Freedom of Information Act 2000 (c. 36)

        1. 43.In Part VII of Schedule 1 at the appropriate place...

      44. The Capital Allowances Act 2001 (c. 2)

        1. 44.In section 274(1), in Table B, in item 4 at...

      45. The Social Security Fraud Act (Northern Ireland) 2001 (c. 17)

        1. 45.In section 4(1) at the end add—

      46. The Enterprise Act 2002 (c. 40)

        1. 46.(1) In section 136(7) at the end add(

      47. The Company Directors Disqualification (Northern Ireland) Order 2002 (NI 4)

        1. 47.In Article 13E(2)(b) for “Energy” substitute “ Utility ”.

      48. The Energy (Northern Ireland) Order 2003 (NI 6)

        1. 48.(1) In Article 2(2) in the definition of “the Authority”...

      49. The Fire and Rescue Service (Northern Ireland) Order 2006 (NI 9)

        1. 49.(1) In Article 16(2) for “Article 35(2) of the Water...

    13. SCHEDULE 13

      REPEALS

Back to top

Options/Help

Print Options

You have chosen to open The Whole Order

The Whole Order you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Order as a PDF

The Whole Order you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Order

The Whole Order you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Order without Schedules

The Whole Order without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Northern Ireland Order in Council and provides information about its policy objective and policy implications. They aim to make the Order accessible to readers who are not legally qualified and accompany any Northern Ireland Order in Council made since 2002.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources