Compulsory Purchase Act 1965

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 13

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to Compulsory Purchase Act 1965. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Section 13:

  • s. 13 applied by S.I. 2020/1297 art. 14(10) (This amendment not applied to legislation.gov.uk. S.I. 2020/1297 was withdrawn following a request from the Department of Transport dated 9th August 2021 which followed the decision of the High Court of Justice to quash this Order in the judgement dated 2nd August 2021 (High Court of Justice — Planning Court — The Queen (on the application of Save Stonehenge World Heritage Site) v. Secretary of State for Transport — Case No. CO/4844/2020))
  • s. 13 applied by S.I. 2020/1297 art. 15(7) (This amendment not applied to legislation.gov.uk. S.I. 2020/1297 was withdrawn following a request from the Department of Transport dated 9th August 2021 which followed the decision of the High Court of Justice to quash this Order in the judgement dated 2nd August 2021 (High Court of Justice — Planning Court — The Queen (on the application of Save Stonehenge World Heritage Site) v. Secretary of State for Transport — Case No. CO/4844/2020))
  • s. 13 applied by S.I. 2020/1297 art. 29(10) (This amendment not applied to legislation.gov.uk. S.I. 2020/1297 was withdrawn following a request from the Department of Transport dated 9th August 2021 which followed the decision of the High Court of Justice to quash this Order in the judgement dated 2nd August 2021 (High Court of Justice — Planning Court — The Queen (on the application of Save Stonehenge World Heritage Site) v. Secretary of State for Transport — Case No. CO/4844/2020))
  • s. 13 applied by S.I. 2020/1297 art. 30(10) (This amendment not applied to legislation.gov.uk. S.I. 2020/1297 was withdrawn following a request from the Department of Transport dated 9th August 2021 which followed the decision of the High Court of Justice to quash this Order in the judgement dated 2nd August 2021 (High Court of Justice — Planning Court — The Queen (on the application of Save Stonehenge World Heritage Site) v. Secretary of State for Transport — Case No. CO/4844/2020))
  • s. 13 applied by S.I. 2021/51 art. 33(11) (This amendment not applied to legislation.gov.uk. S.I. 2021/51 removed from the website by request from the Department of Transport dated 12th July 2021 which followed the decision of the High Court of Justice to quash these Regulations in the judgement dated 8th July 2021 (High Court of Justice — Planning Court — The Queen (on the application of Mair Bain) v. Secretary of State for Transport — Case No. CO/642/2021).)
  • s. 13 applied by S.I. 2021/51 art. 34(11) (This amendment not applied to legislation.gov.uk. S.I. 2021/51 removed from the website by request from the Department of Transport dated 12th July 2021 which followed the decision of the High Court of Justice to quash these Regulations in the judgement dated 8th July 2021 (High Court of Justice — Planning Court — The Queen (on the application of Mair Bain) v. Secretary of State for Transport — Case No. CO/642/2021).)
  • s. 13 applied by S.I. 2024/174 art. 20(6) 31(12) 32(11)
  • s. 13 applied by S.I. 2024/230 art. 19(7) 20(11) 32(10)
  • s. 13 applied by S.I. 2024/360 art. 14(10) 15(7) 29(10) 30(10)
  • s. 13 applied by S.I. 2024/393 art. 20(11) 21(9) 36(11) 37(11) 38(11) 39(10)
  • s. 13 applied by S.I. 2024/436 art. 22(9) 34(10) 35(10)
  • s. 13 applied (with modifications) by 2017 c. 20 s. 22

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

13 Refusal to give possession to acquiring authority.E+W

(1)If the acquiring authority are under this Act authorised to enter on and take possession of any land, and the owner or occupier of any of that land, or any other person, refuses to give up possession of it, or hinders the acquiring authority from entering on or taking possession of it, the acquiring authority may issue their warrant to [F1

(a)the sheriff, or

(b)the enforcement officer,

to deliver possession of it to the person appointed in the warrant to receive it. ]

(2)On receipt of the warrant [F2the person to whom it is issued] shall deliver possession of any such land accordingly.

[F3(2A)If, by virtue of paragraph 3A of Schedule 7 to the Courts Act 2003, the warrant is issued to two or more persons collectively, the duty in subsection (2) of this section shall apply to the person to whom the warrant is allocated in accordance with the approved arrangements mentioned in that Schedule.]

(3)The costs accruing by reason of the issue and execution of the warrant, to be settled by [F4the person executing the warrant], shall be paid by the person refusing to give possession, and the amount of those costs shall be deducted and retained by the acquiring authority from the compensation, if any, payable by them to that person.

(4)If no compensation is payable to the person refusing to give possession, or if it is less than the amount of the costs, that amount or the amount by which the costs exceed the compensation, if not paid on demand, shall be [F5recovered by using the procedure in Schedule 12 to the Tribunals, Courts and Enforcement Act 2007 (taking control of goods)], and on application to any justice of the peace for that purpose he shall issue his warrant accordingly.

F6(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(6)In this section[F7

  • "the enforcement officer", in relation to a warrant to deliver possession of land under this section, means the officer or officers identified for that purpose in paragraph 3A of Schedule 7 to the Courts Act 2003, and]

  • sheriff” includes an under sheriff or other legally competent deputy, and means the sheriff for the area where the land is situated, or if land in one ownership is not situated wholly in one such area the sheriff for the area where any part of the land is situated.

Textual Amendments

Modifications etc. (not altering text)

C3Pt. 1 applied (with modifications) (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 31 (with arts. 5, 27, 53, Sch. 8 paras. 6, 64)

C11Pt. 1 applied (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 25, Sch. 8 paras. 4-11 (with arts. 36, 37, Sch. 9 paras. 14, 44(1), 76, 103)

C17S. 13 saved by Rent Act 1965 (c. 75), s. 35(4) and Caravan Sites Act 1968 (c. 52), s. 5(3)

S. 13 applied (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss. 3(1)(2), 13, Sch. (with s. 14(3)(e))

S. 13 modified (24.12.1999) by S.I. 2000/428, art. 13, Sch. 3 para. 7

S. 13 applied (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 1, 30(14) (with art. 30(9))

S. 13 applied (with modifications) (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 1, 36(11), 37(11) (with arts. 65, 66)

S. 13 applied (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 1, 30(10) (with arts. 3(5), 15(3))

S. 13 applied (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 1, 27(10), 28(10) (with arts. 27(7), 43)

S. 13 applied (13.12.2006) by Luton Dunstable Translink Order 2006 (S.I. 2006/3118), arts. 1, 24(11)

S. 13 applied (19.3.2007) by Ouseburn Barrage Order 2007 (S.I. 2007/608), arts. 1, 28(10) (with arts. 46-48, Sch. 6 para. 23)

S. 13 applied (23.8.2007) by Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 1, 26(10), 27(10) (with arts. 3(6), 12(3))

S. 13 applied (21.5.2008) by Teesport (Land Acquisition) Order 2008 (S.I. 2008/1238), arts. 1(1), 6(10)

S. 13 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 5 para. 6

S. 13 applied (28.2.2013) by The Rookery South (Resource Recovery Facility) Order 2013 (S.I. 2013/680), arts. 25(10), 26(10)

S. 13 applied (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 8(9)

S. 13 applied (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 35(11), 36(10)

S. 13 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 29(10)

S. 13 applied (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 34(11) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

S. 13 applied (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), arts. 1, 26(12), 27(9)

S. 13 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 27(10), 28(10) (with art. 27(11))

S. 13 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 1, Sch. 7 para. 6

S. 13 applied (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 26(11), 27(10) (with art. 26(12))

S. 13 applied (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 28(11), 29(11), 30(10) (with arts. 22, 28(12), 29(12))

S. 13 applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), arts. 1, 23(10), 24(10) (with arts. 5(9), 24(8), 36, 37, Sch. 8 para. 34)

S. 13 applied (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 28(9), 29(10) (with Sch. 8 para. 20)

S. 13 applied (with modifications) (15.11.2017) by The Network Rail (Summerway Overbridge) Order 2017 (S.I. 2017/1027), arts. 1, 5

S. 13 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 9(9)

S. 13 applied (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 23(10), 24(10) (with arts. 24(8), 32(2))

S. 13 applied (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 31(10), 32(10) (with arts. 4, 37)

S. 13 applied (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 38(10), 39(10) (with arts. 39(8), 55-57, Sch. 8 para. 13)

S. 13 applied (with modifications) (4.1.2018) by The Network Rail (Streat Green Underbridge) (Temporary Land Acquisition) Order 2017 (S.I. 2017/1302), arts. 1, 4

S. 13 applied (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 32(9), 33(11) (with arts. 58, 59)

S. 13 applied (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 24(10), 25(10) (with arts. 24(8), 25(8), 33(2))

S. 13 applied (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 15(11), 16(6), 30(13) (with arts. 15(6), 30(11))

S. 13 applied (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 9(10)

S. 13 applied (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 24(10), 25(10) (with art. 31(2))

S. 13 applied (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 14(10), 18(2)

S. 13 applied (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 29(11), 30(10) (with arts. 3(3), 5, 22)

S. 13 applied (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 26(10)(11), 27(10) (with arts. 6, 42)

S. 13 applied (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 19(11), 20(6), 32(9), 33(10) (with arts. 32(7), 33(8), 55, 56)

S. 13 applied (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 17(6), 27(11), 28(10) (with art. 27(12))

S. 13 applied (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 8(10), 9(10) (with art. 18)

S. 13 applied (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 17(6), 28(11), 29(10)

S. 13 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 17(6), 28(12), 29(10)

S. 13 applied (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 34(10), 35(10) (with Sch. 13 Pt. 1 para. 19)

S. 13 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 33(10), 34(10) (with arts. 3(1), 33(7), 34(8))

S. 13 applied (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 34(9), 35(11) (with arts. 47, 48, Sch. 10 para. 19)

S. 13 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 26(10), 27(10) (with arts. 7, 26(7)(11), 27(8))

S. 13 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 29(11), 30(10) (with arts. 5, 44)

S. 13 applied (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 31(11), 32(10) (with arts. 7, 31(12))

S. 13 applied (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 16(10), 17(6), 33(10), 34(11) (with arts. 51, 57)

S. 13 applied (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 34(10), 35(10)

S. 13 applied (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 22(10), 23(8), 33(11), 34(12) (with arts. 22(6), 33(12), 37)

S. 13 applied (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 29(11), 30(10) (with arts. 5, 44)

S. 13 applied (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 15(7), 24(9), 25(10) (with art. 37)

S. 13 applied (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 16(8), 26(10), 27(11) (with arts. 41, 42, Sch. 16 para. 66)

S. 13 applied (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 29(11), 31(10) (with art. 5)

S. 13 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 16(6), 27(12), 28(11), 33(12) (with Sch. 9 para. 144)

S. 13 applied (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), arts. 7(10), 8(10) (with art. 11(2))

S. 13 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 21(12), 22(6), 35(10), 36(11)

S. 13 applied (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 20(9), 30(11), 31(11) (with art. 32, Sch. 9 para. 36)

S. 13 applied (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 10(10), 11(5), 12(10)

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources