Search Legislation

The Pollution Prevention and Control (Scotland) Regulations 2012

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for: Section 3A

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Pollution Prevention and Control (Scotland) Regulations 2012, Section 3A. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F1Interpretation: medium combustion plantS

This section has no associated Policy Notes

3A.(1) In these Regulations—

[F2Chapter III combustion plant” means a combustion plant, the total thermal input of which is equal to or greater than 50 megawatts, irrespective of the type of fuel used, other than—

(a)

a plant in which the products of combustion are used for the direct heating, drying, or any other treatment of objects or materials,

(b)

a post-combustion plant designed to purify the waste gases by combustion which is not operated as an independent combustion plant,

(c)

a facility for the regeneration of catalytic cracking catalysts,

(d)

a facility for the conversion of hydrogen sulphide into sulphur,

(e)

a reactor used in the chemical industry,

(f)

a coke battery furnace,

(g)

a cowper,

(h)

any technical apparatus used in the propulsion of a vehicle, ship or aircraft,

(i)

a gas turbine or gas engine used on an offshore platform,

(j)

a plant which uses any solid or liquid waste as a fuel other than—

(i)

vegetable waste from agriculture and forestry,

(ii)

vegetable waste from the food processing industry, if the heat generated is recovered,

(iii)

fibrous vegetable waste from virgin pulp production and from production of paper from pulp, if it is co-incinerated at the place of production and the heat generated is recovered,

(iv)

cork waste,

(v)

wood waste, with the exception of wood waste which may contain halogenated organic compounds or heavy metals as a result of treatment with wood preservatives or coating,

Chapter IV plant” means an incineration plant or co-incineration plant which incinerates or co-incinerates solid or liquid waste other than—

(a)

a gasification or pyrolysis plant, if the gases resulting from the gasification or pyrolysis are purified to such an extent that they are no longer a waste prior to their incineration and can cause emissions no higher than those resulting from the burning of natural gas,

(b)

a plant treating only the following wastes—

(i)

vegetable waste from agriculture and forestry,

(ii)

vegetable waste from the food processing industry, if the heat generated is recovered,

(iii)

fibrous vegetable waste from virgin pulp production and from production of paper from pulp, if it is co-incinerated at the place of production and the heat generated is recovered,

(iv)

cork waste,

(v)

wood waste, with the exception of wood waste which may contain halogenated organic compounds or heavy metals as a result of treatment with wood preservatives or coating,

(vi)

radioactive waste,

(vii)

animal carcasses regulated by Regulation (EC) No 1069/2009 of the European Parliament and of the Council laying down health rules as regards animal by-products and derived products not intended for human consumption and repealing Regulation (EC) No 1774/2002 as it forms part of [F3assimilated] law,

(viii)

waste resulting from the exploration for, and the exploitation of, oil and gas resources from off-shore installations and incinerated on board the installations,

(c)

experimental plants used for research, development and testing in order to improve the incineration process which treat less than 50 tonnes of waste per year,

co-incineration” has the meaning given in Section 5.1 of Chapter 5 of schedule 1, and related expressions are to be construed accordingly,

co-incineration plant” has the meaning given in Section 5.1 of Chapter 5 of schedule 1,]

“existing medium combustion plant” means a medium combustion plant put into operation before 20th December 2018 or for which a permit was granted before 19th December 2017 provided that the plant is put into operation no later than 20th December 2018,

[F4incineration plant” has the meaning given in Section 5.1 of Chapter 5 of schedule 1,]

“medium combustion plant” means a combustion plant with a rated thermal input equal to or greater than 1 megawatt and less than 50 megawatts but does not include—

(a)

[F5a Chapter III combustion plant,]

(aa)

[F6a Chapter IV plant,]

(c)

combustion plants covered by Regulation (EU) 2016/1628 of the European Parliament and of the Council on requirements relating to gaseous and particulate pollutant emission limits and type-approval for internal combustion engines for non-road mobile machinery,

(d)

on-farm combustion plants with a total rated thermal input less than or equal to 5 megawatts, that exclusively use unprocessed poultry manure, as referred to in Article 9(a) of Regulation (EC) No 1069/2009 of the European Parliament and of the Council laying down health rules as regards animal by-products and derived products not intended for human consumption and repealing Regulation (EC) No 1774/2002, as a fuel,

(e)

combustion plants in which the gaseous products of combustion are used for the direct heating, drying or any other treatment of objects or materials,

(f)

combustion plants in which the gaseous products of combustion are used for direct gas-fired heating used to heat indoor spaces for the purpose of improving workplace conditions,

(g)

post-combustion plants designed to purify the waste gases from industrial processes by combustion, and which are not operated as independent combustion plants,

(h)

any technical apparatus used in the propulsion of a vehicle, ship or aircraft,

(i)

gas turbines and gas and diesel engines, when used on offshore platforms,

(j)

facilities for the regeneration of catalytic cracking catalysts,

(k)

facilities for the conversion of hydrogen sulphide into sulphur,

(l)

reactors used in the chemical industry,

(m)

coke battery furnaces,

(n)

cowpers,

(o)

crematoria,

(p)

combustion plants firing refinery fuels alone or with other fuels for the production of energy within mineral oil and gas refineries,

(q)

recovery boilers within installations for the production of pulp, and

“new medium combustion plant” means a medium combustion plant which is not an existing medium combustion plant.

(2) For the purposes of regulation 26A, a combination formed by two or more new medium combustion plants is to be treated as a single new medium combustion plant and their rated thermal input is added together for the purpose of calculating the total rated thermal input of the plant where—

(a)the waste gases of the plant are discharged through a common stack, or

(b)the waste gases of the plant could be discharged through a common stack in the opinion of SEPA, taking into account technical and economic factors.]

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Policy Note

Policy Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2012 onwards. Prior to this date these type of notes existed as ‘Executive Notes’ and accompanied Scottish Statutory Instruments from July 2005 until July 2012.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources