Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Regulation 8(d)
1.—(1) In order to be injected into the storage site the CO2 stream must consist overwhelmingly of carbon dioxide, and must satisfy the conditions in sub-paragraph (2).
(2) The stream—
(a)must contain no waste or other matter added for the purposes of disposal;
(b)may only contain incidental or trace substances (to the extent permitted by any legislation applicable to those substances) if the concentrations of all such substances are below the levels that would—
(i)adversely affect the integrity of the storage site or the relevant transport infrastructure; or
(ii)pose a significant risk to the environment or human health.
(3) In sub-paragraph (2)—
(a)“incidental substance” means a substance which has become associated with the CO2 either at its original source or as a result of the process of capture or injection; and
(b)“trace substance” means a substance which has been added to the CO2 in order to assist in the monitoring and verifying of its migration after injection.
(4) Before accepting and injecting the stream the operator must ensure that the conditions in sub-paragraphs (1) and (2) can be met, by carrying out—
(a)an analysis of the composition of the stream, and in particular of any corrosive substances that may be present in it; and
(b)an assessment of the risk that the stream will fail to comply with those conditions.
(5) The operator must maintain a register, at a place and in a manner approved by the authority, of the quantities and properties of the CO2 streams that have been delivered to, and injected in, the storage site (including the composition of those streams).
2.—(1) The operator must carry out a programme of monitoring of the storage complex and injection facilities, for the purposes specified in sub-paragraph (3).
(2) Such monitoring must include (where possible) the monitoring of the CO2 plume and (where appropriate) of the surrounding environment.
(3) The purposes are—
(a)the comparison of the actual and modelled behaviour of the CO2 (and the naturally-occurring formation water) in the storage site;
(b)the detection of any significant irregularities;
(c)the detection of any migration of CO2;
(d)the detection of any leakage of CO2;
(e)the detection of any significant adverse effects on the surrounding environment, and in particular on—
(i)drinking water;
(ii)human populations; and
(iii)users of the surrounding biosphere;
(f)the assessment of the effectiveness of any corrective measures taken;
(g)updating the assessment of the safety and integrity, both short-term and long-term, of the storage complex (including the assessment of whether the stored CO2 will be completely and permanently contained).
(4) The monitoring must be based on the monitoring plan.
(5) The monitoring plan must be updated in accordance with Annex II to the Directive and in any event within five years of the approval of the original plan, in order to take account of—
(a)changes to the assessed risk of leakage;
(b)changes to the assessed risks to the environment and human health;
(c)new scientific knowledge; and
(d)improvements in best available technology.
(6) The updated plan must be submitted for approval by the authority.
(7) The authority may—
(a)approve that plan; or
(b)require the operator to make such modifications to it as the authority (after consulting the operator) considers necessary,
and the updated monitoring plan is the plan as so approved or modified.
(8) Sub-paragraphs (5) to (7) apply to the further updating of an updated plan as they apply to the updating of the original plan.
3.—(1) The operator must send to the authority a report in respect of each reporting period containing the information specified in sub-paragraph (5).
(2) The report must be sent to the authority no later than 4 weeks after the end of the relevant reporting period.
(3) Unless the authority determines otherwise under sub-paragraph (4), the reporting periods are the period of one year beginning with the commencement of injection and each subsequent yearly period.
(4) At any time before the commencement of injection, or during a current reporting period, the authority may notify the operator that (beginning with the next reporting period) reporting periods are to be a period of less than one year that is specified in the notice.
(5) The information referred to in sub-paragraph (1) is—
(a)the results of the monitoring carried out in accordance with the provisions of this storage permit (including details of the monitoring technology employed);
(b)the quantities, properties and composition of the CO2 streams delivered to, injected by, and registered by the operator in accordance with the provisions of this storage permit;
(c)proof that the financial security to be maintained in accordance with the provisions of this storage permit has come into effect and remains in force; and
(d)any other information requested by the authority that the authority considers relevant for the purposes of assessing compliance with the conditions of the storage permit or for increasing knowledge of the behaviour of the CO2 stored at the storage site.
(6) If the operator becomes aware of any leakages or significant irregularities, the operator must immediately notify the authority.
(7) If the operator becomes aware of any leakages, or of any significant irregularities which imply the risk of leakage, the operator must immediately notify the person who is the regulator in relation to [F1emissions from] the storage site for the purposes of [F2climate change legislation].
Textual Amendments
F1Words in sch. 2 para. 3(7) inserted (1.12.2021) by The Storage of Carbon Dioxide (Licensing etc.) (EU Exit) (Scotland) (Amendment) Regulations 2021 (S.S.I. 2021/354), regs. 1, 9(a)(i)
F2Words in sch. 2 para. 3(7) substituted (1.12.2021) by The Storage of Carbon Dioxide (Licensing etc.) (EU Exit) (Scotland) (Amendment) Regulations 2021 (S.S.I. 2021/354), regs. 1, 9(a)(ii)
4.—(1) The operator must notify the authority of any change planned in the operation of the storage site, including any changes concerning the operator.
(2) A notification under sub-paragraph (1) must specify the date on which the operator proposes to implement the planned change (“the target date”).
(3) Except where sub-paragraph (4) applies, such a notification must be made at least three months before the target date.
(4) If the change solely concerns the operator, the notification must be made at least four weeks before the target date.
(5) The change may not be implemented before the later of—
(a)the target date or any date notified under regulation 10(4)(b) of the Regulations; and
(b)the date notified by the authority in accordance with regulation 10(1)(b)(ii) of the Regulations.
(6) The change may not be implemented if the authority makes a notification to that effect under regulation 10(2)(b) of the Regulations.
(7) Notwithstanding sub-paragraphs (5) and (6), the change may be implemented on or after the later of the dates mentioned in sub-paragraph (5)(a) if the authority has not before then made a notification under regulation 10(1)(b)(ii) or (2)(b) of the Regulations.
5. The permit is to be reviewed, and where necessary modified or revoked, by the authority in accordance with regulation 10 of the Regulations.
6.—(1) If the operator becomes aware of any leakages or significant irregularities, the operator must take the necessary corrective measures and measures for the protection of human health.
(2) Subject to regulation 9 of the Regulations, the measures taken must include those set out in the corrective measures plan.
7.—(1) The operator must maintain a financial security that—
(a)is of an amount (“the secured amount”) sufficient to ensure that the obligations specified in sub-paragraph (5) can be met; and
(b)is in force before the commencement of injection.
(2) The financial security remains in force until—
(a)the licence is terminated; or
(b)if the storage permit is revoked, until—
(i)a new storage permit is granted; or
(ii)if the storage site is closed following such revocation, until the licence is terminated and the financial contribution obligation is fulfilled.
(3) Following receipt of a report in respect of a reporting period made by the operator in accordance with the provisions of this storage permit, the authority is to assess whether the secured amount is appropriate in the light of—
(a)the assessed risk of leakage; and
(b)the estimated costs of meeting the obligations specified in sub-paragraph (5).
(4) If, following that assessment, the authority decides that the secured amount is to be adjusted—
(a)the authority must notify the operator of the new amount that is required; and
(b)where the secured amount is less than that new amount, the operator must ensure that it is increased to the new amount within 3 months of receiving that notification.
(5) The obligations are—
(a)all obligations of the operator arising under the storage permit, including those arising in respect of the closure of the storage site and during the period between such closure and the termination of the licence;
(b)the obligation to pay the authority's costs under regulation 9(4)(b) or 11(6) of the Regulations; F3...
(c)any obligations of the operator arising in respect of the storage site under [F4climate change legislation] [F5; and
(d)the obligation to provide the financial contribution to the authority in accordance with regulation 10(5) of the Storage of Carbon Dioxide (Termination of Licences) Regulations 2011].
(6) Where the storage permit is revoked—
(a)the obligations of the operator under this paragraph continue in effect until the licence is terminated; but
(b)the assessment by the authority under sub-paragraph (3) is to be made at such intervals as the authority may determine.
Textual Amendments
F3Word in sch. 2 para. 7(5) omitted (23.12.2011) by virtue of The Storage of Carbon Dioxide (Licensing etc.) (Scotland) Amendment Regulations 2011 (S.S.I. 2011/457), regs. 1, 5(a)
F4Words in sch. 2 para. 7(5)(c) substituted (1.12.2021) by The Storage of Carbon Dioxide (Licensing etc.) (EU Exit) (Scotland) (Amendment) Regulations 2021 (S.S.I. 2021/354), regs. 1, 9(b)
F5Sch. 2 para. 7(5)(d) and word inserted (23.12.2011) by The Storage of Carbon Dioxide (Licensing etc.) (Scotland) Amendment Regulations 2011 (S.S.I. 2011/457), regs. 1, 5(b)
8. In this storage permit—
(1) “the Regulations” means the Storage of Carbon Dioxide (Licensing etc.) (Scotland) Regulations 2011.
(2) The following expressions have the meaning given by regulation 1(3) of the Regulations—
“the authority”;
“corrective measures plan”;
“the Directive”;
“the ETS Directive”;
“financial security”;
“injection”;
“legislation”;
“licence”;
“monitoring plan”;
“operator”; and
“storage permit”.
(3) The following expressions have the meanings given by Article 3 of the Directive (and cognate expressions are to be construed accordingly)—
“closure” of a storage site;
“corrective measures”;
“CO2 plume”;
“CO2 stream”;
“leakage”;
“migration”;
“significant irregularity”;
“significant risk”;
“storage complex”;
“storage site”; and
“waste”.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys