- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast) (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
There are currently no known outstanding effects by UK legislation for Regulation (EU) 2019/943 of the European Parliament and of the Council, CHAPTER IV.![]()
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.F2... [F3The Secretary of State may] carry out [F4a] resource adequacy [F5assessment] pursuant to Article 24.
2.Where [F6a] resource adequacy assessment referred to in Article 24 identifies a resource adequacy concern, the [F7Secretary of State] shall identify any regulatory distortions or market failures that caused or contributed to the emergence of the concern.
3.F8... When addressing resource adequacy concerns, the [F9Secretary of State] shall in particular take into account the principles set out in Article 3 and shall consider:
(a)removing regulatory distortions;
(b)removing price caps in accordance with Article 10;
(c)introducing a shortage pricing function for balancing energy as referred to in Article 44(3) of Regulation (EU) 2017/2195;
F10(d). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(e)enabling self-generation, energy storage, demand side measures and energy efficiency by adopting measures to eliminate any identified regulatory distortions;
(f)ensuring cost-efficient and market-based procurement of balancing and ancillary services[F11.]
F12(g). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F134.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F135.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F146.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F157.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F168.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F1Words in Art. 20 heading omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(2)
F2Words in Art. 20(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(3)(a)
F3Words in Art. 20(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(3)(b)(i)
F4Word in Art. 20(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(3)(b)(ii)
F5Word in Art. 20(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(3)(b)(iii)
F6Word in Art. 20(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(4)(a)
F7Words in Art. 20(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(4)(b)
F8Words in Art. 20(3) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 4(a)
F9Words in Art. 20(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(5)(b)
F10Art. 20(3)(d) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(5)(c)
F11Art. 20(3)(f): full stop substituted for semicolon (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(5)(d)
F12Art. 20(3)(g) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(5)(e)
F13Art. 20(4)(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(6)
F14Art. 20(6) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 4(b)
F15Art. 20(7) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 19(8)
F16Art. 20(8) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 4(b)
1.To eliminate residual resource adequacy concerns, [F17the Secretary of State] may, F18... while implementing the measures referred to in Article 20(3) of this Regulation F19..., introduce [F20a] capacity [F21mechanism].
F222.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F233.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.[F24The Secretary of State] shall not introduce [F25a capacity mechanism] where [F26any] resource adequacy assessment [F27has] F28... not identified a resource adequacy concern.
F295.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.[F30The Secretary of State] shall review [F31the] capacity mechanism and shall ensure that no new contracts are concluded under that mechanism where [F32the] resource adequacy assessment [F33has] not identified a resource adequacy concern F34....
F357.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F368.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F17Words in Art. 21(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(2)(a)
F18Words in Art. 21(1) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 5(a)
F19Words in Art. 21(1) omitted (E.W.S.) (31.12.2020) by virtue of The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(5) (with Sch. 3)
F20Word in Art. 21(1) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(2)(b)
F21Word in Art. 21(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(2)(c)
F22Art. 21(2) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(3)
F23Art. 21(3) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 5(b)
F24Words in Art. 21(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(5)(a)
F25Words in Art. 21(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(5)(b)
F26Word in Art. 21(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(5)(c)
F27Word in Art. 21(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(5)(d)
F28Word in Art. 21(4) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 5(c)
F29Art. 21(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(6)
F30Words in Art. 21(6) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(7)(a)
F31Word in Art. 21(6) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(7)(b)
F32Word in Art. 21(6) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(7)(c)
F33Word in Art. 21(6) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(7)(d)
F34Words in Art. 21(6) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 20(7)(e)
F35Art. 21(7) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 5(d)
F36Art. 21(8) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 5(d)
1.Any capacity mechanism shall:
F37(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)not create undue market distortions F38...;
(c)not go beyond what is necessary to address the adequacy concerns referred to in Article 20;
(d)select capacity providers by means of a transparent, non-discriminatory and competitive process;
(e)provide incentives for capacity providers to be available in times of expected system stress;
(f)ensure that the remuneration is determined through the competitive process;
(g)set out the technical conditions for the participation of capacity providers in advance of the selection process;
(h)be open to participation of all resources that are capable of providing the required technical performance, including energy storage and demand side management;
(i)apply appropriate penalties to capacity providers that are not available in times of system stress.
2.The design of strategic reserves shall meet the following requirements:
(a)where a capacity mechanism has been designed as a strategic reserve, the resources thereof are to be dispatched only if the transmission system operators are likely to exhaust their balancing resources to establish an equilibrium between demand and supply;
(b)during imbalance settlement periods where resources in the strategic reserve are dispatched, imbalances in the market are to be settled at least at the value of lost load or at a higher value than the intraday technical price limit as referred in Article 10(1), whichever is higher;
(c)the output of the strategic reserve following dispatch is to be attributed to balance responsible parties through the imbalance settlement mechanism;
(d)the resources taking part in the strategic reserve are not to receive remuneration from the wholesale electricity markets or from the balancing markets;
(e)the resources in the strategic reserve are to be held outside the market for at least the duration of the contractual period.
The requirement referred to in point (a) of the first subparagraph shall be without prejudice to the activation of resources before actual dispatch in order to respect the ramping constraints and operating requirements of the resources. The output of the strategic reserve during activation shall not be attributed to balance groups through wholesale markets and shall not change their imbalances.
3.In addition to the requirements laid down in paragraph 1, capacity mechanisms other than strategic reserves shall:
(a)be constructed so as to ensure that the price paid for availability automatically tends to zero when the level of capacity supplied is expected to be adequate to meet the level of capacity demanded;
(b)remunerate the participating resources only for their availability and ensure that the remuneration does not affect decisions of the capacity provider on whether or not to generate;
(c)ensure that capacity obligations are transferable between eligible capacity providers.
4.Capacity mechanisms shall incorporate the following requirements regarding CO2 emission limits:
(a)from 4 July 2019 at the latest, generation capacity that started commercial production on or after that date and that emits more than 550 g of CO2 of fossil fuel origin per kWh of electricity shall not be committed or to receive payments or commitments for future payments under a capacity mechanism;
(b)from 1 July 2025 at the latest, generation capacity that started commercial production before 4 July 2019 and that emits more than 550 g of CO2 of fossil fuel origin per kWh of electricity and more than 350 kg CO2 of fossil fuel origin on average per year per installed kWe shall not be committed or receive payments or commitments for future payments under a capacity mechanism.
The emission limit of 550 g CO2 of fossil fuel origin per kWh of electricity and the limit of 350 kg CO2 of fossil fuel origin on average per year per installed kWe referred to in points (a) and (b) of the first subparagraph shall be calculated on the basis of the design efficiency of the generation unit meaning the net efficiency at nominal capacity under the relevant standards provided for by the International Organization for Standardization.
F39....
5.[F40The Secretary of State must adapt the capacity mechanism that was applied on 4 July 2019] to comply with Chapter 4 without prejudice to commitments or contracts concluded by 31 December 2019.
Textual Amendments
F37Art. 22(1)(a) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 6
F38Words in Art. 22(1)(b) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 21(2)
F39Words in Art. 22(4) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 21(3)
F40Words in Art. 22(5) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 21(4)
F421.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F422.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F423.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F424.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.The F43... resource adequacy assessment [F44must cover the territory of Great Britain and] shall be based on a transparent methodology which shall ensure that the assessment:
F45(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)is based on appropriate central reference scenarios of projected demand and supply including an economic assessment of the likelihood of retirement, mothballing, new-build of generation assets and measures to reach energy efficiency and electricity interconnection targets and appropriate sensitivities on extreme weather events, hydrological conditions, wholesale prices and carbon price developments;
(c)contains separate scenarios reflecting the differing likelihoods of the occurrence of resource adequacy concerns which [F46a capacity mechanism is] designed to address;
(d)appropriately takes account of the contribution of all resources including existing and future possibilities for generation, energy storage, sectoral integration, demand response, and import and export and their contribution to flexible system operation;
(e)anticipates the likely impact of the measures referred in Article 20(3);
(f)includes variants without existing or planned capacity mechanisms and, where applicable, variants with such mechanisms;
(g)is based on a market model using the flow-based approach, where applicable;
(h)applies probabilistic calculations;
(i)applies a single modelling tool;
(j)includes at least the following indicators referred to in Article 25:
(j)‘expected energy not served’, and
‘loss of load expectation’;
(k)identifies the sources of possible resource adequacy concerns, in particular whether it is a network constraint, a resource constraint, or both;
(l)takes into account real network development;
(m)ensures that the national characteristics of generation, demand flexibility and energy storage, the availability of primary resources and the level of interconnection are properly taken into consideration.
F476.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F477.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F41Words in Art. 23 heading substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(2)
F42Art. 23(1)-(4) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(3)
F43Word in Art. 23(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(4)(a)(i)
F44Words in Art. 23(5) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(4)(a)(ii)
F45Art. 23(5)(a) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(4)(b)
F46Words in Art. 23(5)(c) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(4)(c)
F47Art. 23(6)(7) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 22(5)
1.F49... Resource adequacy assessments [F50may] have a regional scope and shall be based on the methodology F51... in points (b) to (m) of Article 23(5).
F52...
F49... Resource adequacy assessments may take into account additional sensitivities to those referred in point (b) of Article 23(5). In such cases, F49... resource adequacy assessments may:
(a)make assumptions taking into account the particularities of national electricity demand and supply;
(b)use tools and consistent recent data that are complementary to those used by the ENTSO for Electricity for the European resource adequacy assessment.
F53...
2.F54... Resource adequacy assessments F55... shall be made publicly available.
F563.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F48Word in Art. 24 heading omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(2)
F49Word in Art. 24(1) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 7(a)
F50Word in Art. 24(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(3)(a)(i)
F51Words in Art. 24(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(3)(a)(ii)
F52Words in Art. 24(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(3)(a)(iii)
F53Words in Art. 24(1) omitted (E.W.S.) (25.1.2025) by virtue of The Electricity Capacity Mechanism (Amendment) Regulations 2025 (S.I. 2025/74), regs. 1(2), 7(b)
F54Word in Art. 24(2) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(4)(a)
F55Words in Art. 24(2) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(4)(b)
F56Art. 24(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 23(5)
1.[F57The capacity mechanism] shall have a reliability standard in place. A reliability standard shall indicate the necessary level of security of supply F58... in a transparent manner. F59...
[F602.The reliability standard shall be set by the Secretary of State in accordance with regulation 6 of the Electricity Capacity Regulations 2014.]
3.The reliability standard shall be calculated using at least the value of lost load and the cost of new entry over a given timeframe and shall be expressed as ‘expected energy not served’ and ‘loss of load expectation’.
4.When applying capacity mechanisms, the parameters determining the amount of capacity procured in the capacity mechanism shall be approved by the [F61the Secretary of State].
Textual Amendments
F57Words in Art. 25(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 24(2)(a)
F58Words in Art. 25(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 24(2)(b)
F59Words in Art. 25(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 24(2)(c)
F60Art. 25(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 24(3)
F61Words in Art. 25(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 24(4)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F62Arts. 26-49 omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F62Arts. 26-49 omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 25
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys