- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Commission Delegated Regulation (EU) 2016/1238 of 18 May 2016 supplementing Regulation (EU) No 1308/2013 of the European Parliament and of the Council with regard to public intervention and aid for private storage (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
There are currently no known outstanding effects by UK legislation for Commission Delegated Regulation (EU) 2016/1238, Article 8.![]()
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.The aid for private storage shall be paid for the contractual quantity if the quantity stored during the contractual storage period represents at least 99 % of the contractual quantity.
However, in respect of the following products, the aid shall be paid for the contractual quantity if the quantity stored during the contractual storage period represents at least 97 % of the contractual quantity:
(a)sugar that is stored separately from other sugar in the silo designated by the operator;
(b)olive oil;
(c)flax fibre;
(d)beef, pigmeat, sheepmeat and goatmeat, whereas the contractual quantity relates to the fresh meat entering the store;
(e)cheese;
(f)skimmed milk powder in ‘big bags’ as referred to in point (c) of Part VI of Annex VI.
2.Except in cases of force majeure, if the quantity stored during the contractual storage period, including in the case of sugar stored in bulk in the silo designated by the operator, is less than the percentage of the contractual quantity referred to in paragraph 1, no aid shall be paid. Nevertheless, in the case of cheese, if the paying agency deems that the cheese in question was subject to natural weight loss during the storage period, this weight loss shall not lead to a reduction of the aid or the forfeiture of the security.
[F12A.In relation to England, paragraph 2 is to be read as if “or the forfeiture of the security” were omitted.]
[F22B.In relation to Scotland, paragraph 2 is to be read as if “or the forfeiture of the security” were omitted.]
3.Aid shall only be paid where the contractual storage period respects the storage period laid down in the [F3tendering procedure or the Regulations fixing the amount of aid in advance, referred to in Article 39 of Implementing Regulation (EU) 2016/1240.]
4.If checks during storage or on removal reveal that the products are defective, no aid shall be paid for the quantities concerned. The remainder of the storage lot eligible for aid shall be not less than the minimum quantity provided for in the [F3tendering procedure or the Regulations fixing the amount of aid in advance, referred to in Article 39 of Implementing Regulation (EU) 2016/1240.]
The same rule shall apply where part of a storage lot or batch is removed from storage for reasons of defectiveness before the end of the minimum storage period or before the first date allowed for removal operations, where such a date is provided for in the Implementing Regulation opening the tendering procedure or fixing the amount of aid in advance.
Defective products shall not be included in the calculation of the quantity stored referred to in paragraph 1.
[F44A.In relation to England, the first subparagraph of paragraph 4 is to be read as if “during storage or” were omitted.]
[F54B.In relation to Scotland, the first subparagraph of paragraph 4 is to be read as if “during storage or” were omitted.]
5.Except in cases of force majeure, where in respect of the total quantity stored the operator fails to respect the end of the contractual storage period, which has been fixed in accordance with Article 48(2) of Implementing Regulation (EU) 2016/1240, the aid for the contract in question shall be reduced by 10 % for each calendar day of non-compliance.
However, this reduction shall not exceed 100 % of the aid.
6.No aid for private storage shall be paid in respect of the contract concerned where the requirement laid down in Article 53(3) of Implementing Regulation (EU) 2016/1240 is not complied with.
Textual Amendments
F1Art. 8(2A) inserted (E.) (28.2.2023 at 9.10 a.m.) by The Market Measures Payment Schemes (Amendments, Revocation and Transitional Provision) (England) Regulations 2023 (S.I. 2023/124), regs. 1(2)(b), 8(8)(a) (with reg. 10)
F2Art. 8(2B) inserted (S.) (1.7.2023) by The Public Intervention and Private Storage Aid (Amendment and Suspension) (Scotland) Regulations 2023 (S.S.I. 2023/150), regs. 1, 8(8)(a) (with reg. 10)
F3Words in Art. 8(3)(4) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 5(7); 2020 c. 1, Sch. 5 para. 1(1)
F4Art. 8(4A) inserted (E.) (28.2.2023 at 9.10 a.m.) by The Market Measures Payment Schemes (Amendments, Revocation and Transitional Provision) (England) Regulations 2023 (S.I. 2023/124), regs. 1(2)(b), 8(8)(b) (with reg. 10)
F5Art. 8(4B) inserted (S.) (1.7.2023) by The Public Intervention and Private Storage Aid (Amendment and Suspension) (Scotland) Regulations 2023 (S.S.I. 2023/150), regs. 1, 8(8)(b) (with reg. 10)
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys