- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
There are outstanding changes by UK legislation not yet made to Regulation (EU) No 305/2011 of the European Parliament and of the Council. Any changes that have already been made to the legislation appear in the content and are referenced with annotations.![]()
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
1.[F2An approved] body shall meet the requirements set out in paragraphs 2 to 11.
[F32.An approved body must have legal personality and must be established in—
(a)the United Kingdom; or
(b)the territory of a party to the CPTPP.]
3.[F4An approved] body shall be a third-party body independent from the organisation or the construction product it assesses.
A body belonging to a business association or professional federation representing undertakings involved in the design, manufacturing, provision, assembly, use or maintenance of construction products which it assesses, can on condition that its independence and the absence of any conflict of interest are demonstrated, be considered to be such a body.
4.[F4An approved] body, its top-level management and the personnel responsible for carrying out the third party tasks in the process of assessment and verification of constancy of performance shall not be the designer, manufacturer, supplier, installer, purchaser, owner, user or maintainer of the construction products which it assesses, nor the authorised representative of any of those parties. This shall not preclude the use of assessed products that are necessary for the operations of the [F5approved] body or the use of products for personal purposes.
[F4An approved] body, its top-level management and the personnel responsible for carrying out the third party tasks in the process of assessment and verification of constancy of performance shall not become directly involved in the design, manufacture or construction, marketing, installation, use or maintenance of those construction products, nor represent the parties engaged in those activities. They shall not engage in any activity that may conflict with their independence of judgement and integrity related to the activities for which they have been [F5approved]. This shall, in particular, apply to consultancy services.
[F4An approved] body shall ensure that activities of its subsidiaries or subcontractors do not affect the confidentiality, objectivity and impartiality of its assessment and/or verification activities.
5.[F4An approved] body and its personnel shall carry out the third party tasks in the process of assessment and verification of constancy of performance with the highest degree of professional integrity and requisite technical competence in the specific field and must be free from all pressures and inducements, particularly financial, which might influence their judgement or the results of their assessment and/or verification activities, especially from persons or groups of persons with an interest in the results of those activities.
6.[F4An approved] body shall be capable of carrying out all the third party tasks in the process of assessment and verification of constancy of performance assigned to it in accordance with Annex V in relation to which it has been [F5approved], whether those tasks are carried out by the [F5approved] body itself or on its behalf and under its responsibility.
At all times and for each system of assessment and verification of constancy of performance and for each kind or category of construction products, essential characteristics and tasks in relation to which it has been [F5approved], the [F5approved] body shall have the following at its disposal:
(a)the necessary personnel with technical knowledge and sufficient and appropriate experience to perform the third party tasks in the process of assessment and verification of constancy of performance;
(b)the necessary description of procedures according to which the assessment of performance is carried out, ensuring the transparency and the ability of reproduction of these procedures; it shall have appropriate policies and procedures in place that distinguish between the tasks it carries out as [F4an approved] body and other activities;
(c)the necessary procedures to perform its activities which take due account of the size of an undertaking, the sector in which it operates, its structure, the degree of complexity of the product technology in question and the mass or serial nature of the production process.
[F4An approved] body shall have the means necessary to perform the technical and administrative tasks connected with the activities for which it is [F5approved] in an appropriate manner and shall have access to all necessary equipment or facilities.
7.The personnel responsible for carrying out the activities in relation to which the body has been [F6approved], shall have the following:
(a)sound technical and vocational training covering all the third party tasks in the process of assessment and verification of constancy of performance within the relevant scope for which the body has been [F6approved];
(b)satisfactory knowledge of the requirements of the assessments and verifications they carry out and adequate authority to carry out such operations;
(c)appropriate knowledge and understanding of the applicable [F7designated] standards and of the relevant provisions of the Regulation;
(d)the ability required to draw up the certificates, records and reports to demonstrate that the assessments and the verifications have been carried out.
8.The impartiality of the [F8approved] body, its top-level management and assessment personnel shall be guaranteed.
The remuneration of the [F8approved] body’s top-level management and assessment personnel shall not depend on the number of assessments carried out or on the results of such assessments.
[F99.An approved body must have adequate liability insurance in respect of its activities.]
10.The personnel of the [F10approved] body shall be bound to observe professional secrecy with regard to all information gained in carrying out its tasks under Annex V, except in relation to [F11a competent authority, the UK national accreditation body or any other body to which the Secretary of State delegates or otherwise entrusts the monitoring of the approved body.] Proprietary rights shall be protected.
11.[F12An approved] body shall participate in, or ensure that its assessment personnel is informed of, the relevant standardisation activities and the activities of the [F13approved] body coordination group established under this Regulation and shall apply as general guidance the administrative decisions and documents produced as a work result of that group.
Textual Amendments
F1Word in Art. 43 heading substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(2) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F2Words in Art. 43(1) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(3) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F3Art. 43(2) substituted (coming into force in accordance with reg. 1(2) of the amending S.I.) by The Treatment of Conformity Assessment Bodies (Comprehensive and Progressive Agreement for Trans-Pacific Partnership) Regulations 2024 (S.I. 2024/504), reg. 16(7)
F4Words in Art. 43(3)-(6) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(5)(a) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F5Word in Art. 43(3)-(6) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(5)(b) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F6Word in Art. 43(7) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(6)(a) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F7Word in Art. 43(7)(c) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(6)(b) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F8Word in Art. 43(8) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(7) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F9Art. 43(9) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(8) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F10Word in Art. 43(10) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(9)(a) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F11Words in Art. 43(10) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(9)(b) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F12Words in Art. 43(11) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(10)(a) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
F13Word in Art. 43(11) substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 43(10)(b) (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 para. 17); 2020 c. 1, Sch. 5 para. 1(1)
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys