Chwilio Deddfwriaeth

Directive (EU) 2018/2001 of the European Parliament and of the CouncilDangos y teitl llawn

Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance)

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about UK-EU Regulation

Deddfwriaeth yn deillio o’r UE

Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.

Close

Mae'r eitem hon o ddeddfwriaeth yn tarddu o'r UE

Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).

Status:

Cyhoeddir Cyfarwyddebau’r UE ar y wefan hon i gynorthwyo croesgyfeirio o ddeddfwriaeth y DU. Ers diwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.) nid oes unrhyw ddiwygiadau wedi'u cymhwyso i'r fersiwn hon.

Article 11U.K.Joint projects between Member States and third countries

1.One or more Member States may cooperate with one or more third countries on all types of joint projects with regard to the production of electricity from renewable sources. Such cooperation may involve private operators and shall take place in full respect of international law.

2.Electricity from renewable sources produced in a third country shall be taken into account for the purposes of calculating the renewable energy shares of the Member States only where the following conditions are met:

(a)the electricity is consumed in the Union, which is deemed to be met where:

(i)

an equivalent amount of electricity to the electricity accounted for has been firmly nominated to the allocated interconnection capacity by all responsible transmission system operators in the country of origin, the country of destination and, if relevant, each third country of transit;

(ii)

an equivalent amount of electricity to the electricity accounted for has been firmly registered in the schedule of balance by the responsible transmission system operator on the Union side of an interconnector; and

(iii)

the nominated capacity and the production of electricity from renewable sources by the installation referred to in point (b) refer to the same period of time;

(b)the electricity is produced by an installation that became operational after 25 June 2009 or by the increased capacity of an installation that was refurbished after that date, under a joint project as referred to in paragraph 1;

(c)the amount of electricity produced and exported has not received support from a support scheme of a third country other than investment aid granted to the installation; and

(d)the electricity has been produced in accordance with international law, in a third country that is a signatory to the Council of Europe Convention for the Protection of Human Rights and Fundamental Freedoms, or other international conventions or treaties on human rights.

3.For the purposes of paragraph 4, Member States may apply to the Commission for account to be taken of electricity from renewable sources produced and consumed in a third country, in the context of the construction of an interconnector with a very long lead-time between a Member State and a third country where the following conditions are met:

(a)construction of the interconnector started by 31 December 2026;

(b)it is not possible for the interconnector to become operational by 31 December 2030;

(c)it is possible for the interconnector to become operational by 31 December 2032;

(d)after it becomes operational, the interconnector will be used for the export to the Union, in accordance with paragraph 2, of electricity from renewable sources;

(e)the application relates to a joint project that fulfils the criteria set out in points (b) and (c) of paragraph 2 and that will use the interconnector after it becomes operational, and to a quantity of electricity that is no greater than the quantity that will be exported to the Union after the interconnector becomes operational.

4.The proportion or amount of electricity produced by any installation in the territory of a third country, which is to be regarded as counting towards the renewable energy share of one or more Member States for the purposes of this Directive, shall be notified to the Commission. When more than one Member State is concerned, the distribution between Member States of that proportion or amount shall be notified to the Commission. The proportion or amount shall not exceed the proportion or amount actually exported to, and consumed in, the Union, shall correspond to the amount referred to in point (a)(i) and (ii) of paragraph 2 and shall meet the conditions set out in point (a) of that paragraph. The notification shall be made by each Member State towards whose overall national target the proportion or amount of electricity is to count.

5.The notification referred to in paragraph 4 shall:

(a)describe the proposed installation or identify the refurbished installation;

(b)specify the proportion or amount of electricity produced from the installation which is to be regarded as counting towards the renewable energy share of a Member State as well as, subject to confidentiality requirements, the corresponding financial arrangements;

(c)specify the period, in whole calendar years, during which the electricity is to be regarded as counting towards the renewable energy share of the Member State; and

(d)include a written acknowledgement of points (b) and (c) by the third country in whose territory the installation is to become operational and an indication of the proportion or amount of electricity produced by the installation which will be used domestically by that third country.

6.The duration of a joint project as referred to in this Article may extend beyond 2030.

7.A notification made under this Article shall be varied or withdrawn only where there is a joint agreement between the Member State making the notification and the third country that has acknowledged the joint project in accordance with point (d) of paragraph 5.

8.Member States and the Union shall encourage the relevant bodies of the Energy Community to take, in conformity with the Energy Community Treaty, the measures necessary to allow the Contracting Parties to apply the provisions on cooperation between Member States laid down in this Directive.

Yn ôl i’r brig

Options/Cymorth

Print Options

You have chosen to open the Whole Directive

The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.

Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.

Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill