- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Directive 2012/34/EU of the European Parliament and of the Council of 21 November 2012 establishing a single European railway area (recast) (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
Cyhoeddir Cyfarwyddebau’r UE ar y wefan hon i gynorthwyo croesgyfeirio o ddeddfwriaeth y DU. Ers diwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.) nid oes unrhyw ddiwygiadau wedi'u cymhwyso i'r fersiwn hon.
1.Charges for the use of railway infrastructure and of service facilities shall be paid to the infrastructure manager and to the operator of service facility respectively and used to fund their business.
2.Member States shall require the infrastructure manager and the operator of service facility to provide the regulatory body with all necessary information on the charges imposed in order to allow the regulatory body to perform its functions as referred to in Article 56. The infrastructure manager and the operator of service facility shall, in this regard, be able to demonstrate to railway undertakings that infrastructure and service charges actually invoiced to the railway undertaking pursuant to Articles 30 to 37 comply with the methodology, rules and, where applicable, scales laid down in the network statement.
3.Without prejudice to paragraph 4 or 5 of this Article or to Article 32, the charges for the minimum access package and for access to infrastructure connecting service facilities shall be set at the cost that is directly incurred as a result of operating the train service.
Before 16 June 2015, the Commission shall adopt measures setting out the modalities for the calculation of the cost that is directly incurred as a result of operating the train. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 62(3).
The infrastructure manager may decide to gradually adapt to those modalities during a period of no more than four years after the entry into force of those implementing acts.
4.The infrastructure charges referred to in paragraph 3 may include a charge which reflects the scarcity of capacity of the identifiable section of the infrastructure during periods of congestion.
5.The infrastructure charges referred to in paragraph 3 may be modified to take account of the cost of environmental effects caused by the operation of the train. Any such modification shall be differentiated according to the magnitude of the effect caused.
Based on the experience gained by infrastructure managers, railway undertakings, regulatory bodies and competent authorities, and recognising existing schemes on noise differentiation, the Commission shall adopt implementing measures setting out the modalities to be followed for the application of the charging for the cost of noise effects including its duration of application and enabling the differentiation of infrastructure charges to take into account, where appropriate, the sensitivity of the area affected, in particular in terms of the size of population affected and the train composition with an impact on the level of noise emissions. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 62(3). They shall not result in the undue distortion of competition between railway undertakings or affect the overall competitiveness of the rail sector.
Any such modification of infrastructure charges to take account of the cost of noise effects shall support the retrofitting of wagons with the most economically viable low-noise braking technology available.
Charging of environmental costs which results in an increase in the overall revenue accruing to the infrastructure manager shall however be allowed only if such charging is applied to road freight transport in accordance with Union law.
If charging for environmental costs generates additional revenue, it shall be for Member States to decide how the revenue is to be used.
Member States shall ensure that the necessary information is kept and that the origin of the charging of environmental costs and its application can be traced. Member States shall provide the Commission with this information upon request.
6.To avoid undesirable disproportionate fluctuations, the charges referred to in paragraphs 3, 4 and 5 may be averaged over a reasonable spread of train services and times. Nevertheless, the relative magnitude of the infrastructure charge shall be related to the costs attributable to the services.
7.The charge imposed for track access within service facilities referred to in point 2 of Annex II, and the supply of services in such facilities, shall not exceed the cost of providing it, plus a reasonable profit.
8.Where services listed in points 3 and 4 of Annex II, as additional and ancillary services are offered by only one supplier, the charge imposed for such a service shall not exceed the cost of providing it, plus a reasonable profit.
9.Charges may be levied for capacity used for the purpose of infrastructure maintenance. Such charges shall not exceed the net revenue loss to the infrastructure manager caused by the maintenance.
10.The operator of the facility for supply of the services referred to in points 2, 3 and 4 of Annex II shall provide the infrastructure manager with the information on charges to be included in the network statement or shall indicate a website where such information is made available free of charge in electronic format in accordance with Article 27.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys