- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
EU_status_warning_original_version
This legislation may since have been updated - see the latest available (revised) version
For the purposes of verifying compliance with the targets set in Article 11(2) of Directive 2008/98/EC, the following rules shall apply:
Member States shall verify compliance with the targets set in Article 11(2) of Directive 2008/98/EC by calculating the weight of the waste streams which are generated and the waste streams which are prepared for reuse, recycled or have undergone other material recovery in 1 calendar year.
The weight of the waste prepared for reuse, recycled or materially recovered shall be determined by calculating the input waste used in the preparation for reuse or the final recycling or other final material recovery processes. A preparatory operation prior to the submission of the waste to a recovery or disposal operation is not a final recycling or other final material recovery operation. Where waste is collected separately or the output of a sorting plant is sent to recycling or other material recovery processes without significant losses, that waste may be considered the weight of the waste which is prepared for reuse, recycled or has undergone other material recovery.
The amount of waste prepared for reuse shall be included in the amount of recycled waste and shall not be reported separately.
Where waste is sent for preparation for reuse, recycling or other material recovery in another Member State, it may only be counted toward the targets of the Member State in which it has been collected.
Where waste is exported out of the Union for preparation for reuse, recycling or other material recovery, it shall be counted as prepared for reuse, recycled or having undergone other material recovery only where there is sound evidence showing compliance of the shipment with the provisions of Regulation (EC) No 1013/2006 of the European Parliament and of the Council(1), and in particular Article 49(2) thereof.
Where the target calculation is applied to the aerobic or anaerobic treatment of biodegradable waste, the input to the aerobic or anaerobic treatment may be counted as recycled where that treatment generates compost or digestate which, following any further necessary reprocessing, is used as a recycled product, material or substance for land treatment resulting in benefit to agriculture or ecological improvement.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys