Search Legislation

The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 13A

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, SCHEDULE 13A. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 7

[F1SCHEDULE 13AN.I.ENERGY EFFICIENCY DIRECTIVE

This schedule has no associated Explanatory Memorandum

ApplicationN.I.

1.  This Schedule applies to every installation or mobile plant to which Article 14(5) of the Energy Efficiency Directive applies.

InterpretationN.I.

2.  In this Schedule—

“economically justified demand” means demand that does not exceed the needs for heating or cooling and which would otherwise be satisfied at market conditions by energy generation processes other than cogeneration;

“electricity from cogeneration” means electricity generated in a process linked to the production of useful heat and calculated in accordance with the methodology laid down in Annex II of the Energy Efficiency Directive;

“substantial refurbishment” means a refurbishment whose cost exceeds 50% of the investment cost for a new comparable unit, but the fitting of equipment to carry out the activity falling within head (a) of Part A of section 6.10 of Part 1 of Schedule 1 shall not be considered as refurbishment for the purposes of paragraphs 4, 7 and 10 of this Schedule; and

“unit” means any boilers, furnaces, kilns, turbines or engines forming part of an installation which added together have a rated thermal input of more than 20 megawatts.

Cost-benefit analysisN.I.

3.  An application to an enforcing authority under regulation 10 for a permit to operate a new installation, carrying out an activity with a total net thermal input exceeding 20 megawatts and generating electricity must be accompanied by a cost-benefit analysis that assesses the costs and benefits of operating the installation or converting the installation to operate as a high-efficiency cogeneration installation.

4.  An operator of an installation, carrying out an activity with a total net thermal input exceeding 20 megawatts and generating electricity must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.

5.  The application for a variation of the conditions of the permit required by paragraph 4 must be accompanied by a cost-benefit analysis that assesses the costs and benefits of operating the installation, or converting the installation to operate, as a high-efficiency cogeneration installation.

6.  An application to an enforcing authority under regulation 10 for a permit to operate a new installation with a total net thermal input exceeding 20 megawatts, other than an installation falling within paragraph 3, and generating waste heat at a useful temperature level, must be accompanied by a cost-benefit analysis that assesses the cost and benefits of utilising the waste heat to satisfy economically justified demand, including through cogeneration, and of the connection of that installation to a district heating and cooling network.

7.  An operator of an installation with a total net thermal input exceeding 20 megawatts, and generating waste heat at a useful temperature level must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.

8.  The application for a variation of the conditions of the permit required by paragraph 7 must be accompanied by a cost-benefit analysis that assesses the cost and benefits of utilising the waste heat to satisfy economically justified demand, including through cogeneration, and of the connection of that installation to a district heating and cooling network.

9.  An application to an enforcing authority under regulation 10 for a permit to operate a new installation with a total net thermal input exceeding 20 megawatts which forms part of a new or existing district heating and cooling network must be accompanied by a cost-benefit analysis that assesses the cost and benefits of utilising the waste heat from nearby installations.

10.  An operator of an installation with a total net thermal input exceeding 20 megawatts which forms part of an existing district heating or cooling network must apply to the enforcing authority under regulation 19(2) for a variation in the conditions of his permit before undertaking a substantial refurbishment.

11.  The application for a variation in the conditions of the permit required by paragraph 10 must be accompanied by a cost-benefit analysis that assesses the cost and benefits of utilising the waste heat from nearby installations.

12.  Paragraphs 3 to 11 shall not apply to—

(1) peak load and back-up electricity generating installations for which the application states that operation under 1,500 operating hours per year as a rolling average over a period of five years is planned; or

(2) installations that need to be located close to a geological storage site approved under Directive 2009/31/EC [F2as last amended by Directive 2011/92/EU] .

13.  Where the exemption specified in paragraph 12(1) applies, the enforcing authority shall include, in the permit, conditions ensuring that the operating hours remain within the constraints specified in paragraph 12(1).

14.  Paragraphs 6 to 11 shall not apply to individual installations:

(1) which do not form part of a district cooling network; and

(2) with any of the following—

(a)available waste heat of 100 kilowatts or less;

(b)available waste heat,

(i)greater than 100 kilowatts as hot water or steam, where there is no hot water heat demand greater than 100 kilowatts within the search radius from the source installation as set out in the table below, located within the connection distance from the centre of the source installation; or

(ii)greater than 500 kilowatts as steam, where there is no steam-based heat demand greater than 500 kilowatts and no water heat demand greater than 100 kilowatts within the search radius from the centre of the installation as set out in the table below, located within the connection distance from the centre of the source installation;

(c)a heat demand of—

(i)100 kilowatts or less for hot water heat demands; or

(ii)500 kilowatts or less for steam-based heat demands;

(d)a hot water heat demand greater than 100 kilowatts, with no source of available waste heat greater than 100 kilowatts within the search radius from the centre of the installation as set out in the Table, located within the connection distance from the centre of the demand installation; or

(e)a steam-based heat demand greater than 500 kilowatts, with no source of steam-based waste heat greater than 500 kilowatts within the search radius from the centre of the installation as set out in the Table, located within the connection distance from the centre of the demand installation.

Table

Installation typeThermal capacity (kilowatts (kW) and megawatts (MW))

Search radius (km)

(measured from centre of the installation)

Hot water demand>100kW and <3.9 MW0.0038 x H, where H = thermal capacity in kW
≥3.9MW15
Steam demand>500kW and <12.5 MW0.0012 x H, where H = thermal capacity in kW
≥12.5 MW15
Waste heat source (hot water or steam)>100kW and <3.9 MW0.0038 x H, where H = thermal capacity in kW
≥3.9MW15

15.  For the purposes of paragraph 14, “connection distance” means—

(1) in the case of a hot water heat link, the thermal capacity in kilowatts of the source or demand, whichever is smaller, multiplied by 0.0038; or

(2) in the case of a steam heat link, the thermal capacity in kilowatts of the source or demand, whichever is smaller, multiplied by 0.0012,

expressed in kilometres.

16.  From 31st December 2015, when considering permit applications and applications for the variation of conditions, the enforcing authority shall take into account both the outcome of the cost-benefit analysis and the outcome of the United Kingdom’s comprehensive national assessment required by Article 14(1) of the Energy Efficiency Directive.

17.  Subject to paragraph 19, where a cost-benefit analysis, required pursuant to paragraphs 3, 5, 6 or 8 shows that benefits exceed costs, the enforcing authority may only grant the permit or vary the conditions of the permit subject to the inclusion of appropriate conditions that will ensure the operation of the installation in a manner shown by that analysis to be cost beneficial.

18.  Subject to paragraph 19, where a cost-benefit analysis required pursuant to paragraphs 9 or 11 shows that benefits exceed costs, the regulator may only grant the permit or vary the conditions of the permit subject to the inclusion of appropriate conditions that will ensure the operation of the installation, in conjunction with the utilisation of the waste heat from nearby installations, in a manner shown by that analysis to be cost beneficial.

19.  Paragraphs 17 and 18 do not apply if, in individual cases, the enforcing authority decides that there are imperative reasons of law, ownership or finance for it not to apply. In such cases, within two months of its decision, the enforcing authority shall submit a reasoned notification of it to the Department.

20.  The provisions of this Schedule apply to installations covered by the IED without prejudice to the requirements of that Directive.]

Back to top

Options/Help

Print Options

You have chosen to open The Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Rule as a PDF

The Whole Rule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Rule and provides information about its policy objective and policy implications. They aim to make the Statutory Rule accessible to readers who are not legally qualified and accompany any Northern Ireland Statutory Rule or Draft Northern Ireland Statutory Rule laid before the UK Parliament during the suspension of the Northern Ireland Assembly.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources